Sky Metals Limited · ASX:SKY
Sky Metals — RIU Sydney Conference 2022
17 slides from Sky Metals's conference presentation, May 3, 2022
Slide 1: Exploring Large Scale Tin Systems in NSW
EXPLORING LARGE SCALE TIN SYSTEMS IN NSW MAY 2022
Slide 2: Disclaimer - Important Information
ASX: SKY D I S CL A I MER - I MPO R T AN T I N FO R MA TI O N Disclaimer Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by such forward looking information, in
Slide 3: Sky's Strategy: Advanced Exploration Portfolio
ASX: SKY S KY’ S ST R AT E GY ADVANCED EXPLORATION PORTFOLIO TIN GOLD COPPER-GOLD Doradilla Project Cullarin Project Iron Duke Project (100% SKY) (80% SKY:HRR JV) (Balmain Option) Tallebung Project Kangiara Project Galwadgere Project (100% SKY) (80% SKY:HRR JV) (100% SKY) Emmaville Project Caledonia
Slide 4: Experienced and Proven Management
ASX: SKY S KY’ S TE AM EXPERIENCED AND PROVEN MANAGEMENT NORMAN SECKOLD | Chairman RICHARD HILL | Non-Executive Director CAPITAL STRUCTURE 30+ years in the full-time management of natural resource 25+ years experience in the mineral resources sector as a Shares on issue 376.8M companies. Past Chairm
Slide 5: Tin Market: Breaching Record Highs
ASX: SKY D O R AD I L L A TI N PR O JE C T TIN MARKET: BREACHING RECORD HIGHS Major price breakout driven by electronic sector demand and supply crunch driven by 30+ year under investment 20-year 3M tin price (AUD/tonne) (source: LME).
Slide 6: Tin Market – Diminishing Stockpiles, Increasing Demand
ASX: SKY D O R AD I L L A TI N PR O JE C T TIN MARKET – DIMINISHING STOCKPILES, INCREASING DEMAND LME Stockpiles 6
Slide 7: Tin Market – Strong Tin Price to Continue
ASX: SKY D O R AD I L L A TI N PR O JE C T TIN MARKET – STRONG TIN PRICE TO CONTINUE Tin price at record highs over 60,000 AUD/t LME cash over 4x copper price, 1% tin corresponds to ~7g/t Au. LME and Shanghai Futures Exchange stockpiles have reached all time lows, falling to around 2,000 tons, or le
Slide 8: Doradilla - 3KEL Tin-Copper Focus
ASX: SKY D O R AD I L L A TI N PR O JE C T DORADILLA - 3KEL TIN-COPPER FOCUS
Slide 9: 3KEL Target: Open In All Directions
ASX: SKY D O R AD I L L A TI N PR O JE C T 3KEL TARGET: O P EN IN A L L D I R E CT I O N S SCHEMATIC LONG SECTION 9
Slide 10: 3KEL Target: Open At Depth
ASX: SKY D O R AD I L L A TI N PR O JE C T 3KEL TARGET: OPEN AT DEPTH SCHEMATIC CROSS SECTIONS 10
Slide 11: Primary Tin – Malayaite-Hosted Metallurgy
ASX: SKY D O R AD I L L A TI N PR O JE C T PRIMARY TIN – MALAYAITE-HOSTED METALLURGY • Discussion with smelting group indicate that malayaite concentrates of +30% Sn are amenable to smelting. • Previous metallurgical work demonstrates +90% recovery on oxide copper. • Optical and XRT ore sorting inve
Slide 12: 3KEL Target: Follow-Up Drilling Commenced
ASX: SKY D O R AD I L L A TI N PR O JE C T 3KEL TARGET: FOLLOW-UP DRILLING COMMENCED SKY drilling results have defined a large system, open along strike and down plunge. Diamond drilling continued extension, large RC drilling program arranged for May to quickly advance project. Metallurgical test wo
Slide 13: Tallebung Target: Bulk Tonnage Tin
ASX: SKY TA L L E B UN G TI N PR O J EC T TALLEBUNG TARGET: BULK TONNAGE TIN 13
Slide 14: Tallebung Target: Potential Bulk Tonnage Tin Resource
ASX: SKY TA L L E B UN G TI N PR O J EC T TALLEBUNG TARGET: POTENTIAL BULK TONNAGE TIN RESOURCE • Site of large-scale tin mining activity over 100 years from the 1880s to 1980s. • 2019 drilling by SKY targeting high-grade lodes; re- assessed to show significant bulk tonnage potential: TBRC006: 87m @
Slide 15: Infrastructure Already Connected
ASX: SKY TA L L E B UN G TI N PR O J EC T INFRASTRUCTURE ALREADY CONNECTED Infrastructure is already in place from previous mining including: • Powerlines to site. • Established past water supply. • Sealed and unsealed roads constructed to site. • Use of historic tailings dam, only 1/3 full. • Exten
Slide 16: Tallebung Target: Drilling
ASX: SKY TA L L E B UN G TI N PR O J EC T TALLEBUNG TARGET: DRILLING • Extensive historic mining and drilling. • 10 holes completed for a total of 1,217m. • All holes successfully intercepted the tin lode system. • Tin hosted in cassiterite (tin oxide) indicating favourable concentration by gravity
Slide 17: Sky
8K Y