Exxaro Resources Limited · JSE:EXX

Exxaro Resources — FY2010 Earnings Presentation

51 slides from Exxaro Resources's earnings presentation, February 2011

  1. Slide 1: Overview

    Slide 1: Overview

    Overview Sipho Nkosi: Chief Executive Officer

  2. Slide 2: Highlights

    Slide 2: Highlights

    Highlights LTIFR* 0,39 0,36 0,33 0,25 LTIFR down from 0,33 to 0,25 14% increase in revenue to R17 billion 2007 2008 2009 2010 17 135 3% increase in coal production to 47Mt 17 135 Revenue (Rm) 17,2 105% increase in headline earnings per share to 1 495 cents 15, 0 13,8 10,2 R1,5 billion decrease in ne

  3. Slide 3: Safety

    Slide 3: Safety

    Safety Reportable fatalities LTIFR* 4 4 0,39 0,36 0,33 3 0,25 Target 0,21 1 2007 2008 2009 2010 2007 2008 2009 2010 • Regrettably one fatality was recorded during 2010 • 24% improvement in LTIFR year-on-year • 5 sites were without lost time injuries • Our target is to create an injury free environme

  4. Slide 4: Financial and operational overview

    Slide 4: Financial and operational overview

    Financial and operational overview Wim de Klerk: Finance Director

  5. Slide 5: Financial highlights

    Slide 5: Financial highlights

    Financial highlights Revenue (Rm) Healthy financial metrics 17 135+ 19% * 17 155 15009 15 009 – 14% increase in revenue 1313843 843 – 52% increase in comparable net operating profit 11 449 10 157 – 105% increase in HEPS – 38% ROCE Disciplined cost control 2007 2008 2009 2010 Strong cash flow and bal

  6. Slide 6: Financial overview

    Slide 6: Financial overview

    Financial overview Excluding Including % Change FY10 impairment impairment R million FY09 FY09 Revenue 17 155 15 009 14 15 009 Operating expenses 14 519 13 270 (9) 14 705 Net operating profit 2 636 1 739 52 304 Operating margin (%) 15 12 25 2 Post-tax equity accounted income 3 717 1 898 96 1 898 Att

  7. Slide 7: Revenue

    Slide 7: Revenue

    Revenue R million FY10 FY09 % Change Coal 10 515 9 731 8 – Tied operations 2 952 2 681 10 – Commercial operations 7 563 7 050 7 Mineral Sands 4 640 3 508 32 – KZN Sands 1 288 705 83 – Namakwa Sands 1 801 1 334 35 – Australia Sands 1 551 1 469 6 Base Metals 1 787 1 582 13 – Rosh Pinah 674 566 19 – Zi

  8. Slide 8: Coal production

    Slide 8: Coal production

    Coal production • Total production increase of 3% to 46,7Mt • 1% increase from commercial operations to meet power station demand • 13% increase in steam coal production • 20% increase in coking coal production due to higher demand from ArcelorMittal SA • First full year of char production at 114kt

  9. Slide 9: Coal markets and sales

    Slide 9: Coal markets and sales

    Coal markets and sales Steam coal and market coke prices (USD/t-FOB) 2010 180 800 • Eskom demand marginally higher • Steam coal export decreased by 9% to 4,1Mt 600 • 10% increase in domestic metals market demand 120 Outlook 400 • Stable Eskom demand 60 • Flat export volumes at higher prices 200 • Ma

  10. Slide 10: Mineral sands production

    Slide 10: Mineral sands production

    Mineral sands production Slag • Burn through of Furnace 2 on 26 October 2010 • KZN Sands Furnace 1 down for 5 months and back in operation end January 2011 • Namakwa Sands benefited from increased side feed into furnaces • Furnace 2 at Namakwa Sands will be down for 3 months for a planned reline Zir

  11. Slide 11: Mineral sands markets and sales

    Slide 11: Mineral sands markets and sales

    Mineral sands markets and sales Prices (USD/t – FOB)* 2010 700 3 000 • Higher demand for all products during 2010 600 • Mineral sands and pig iron price increased 500 2 000 • Pigment prices significantly higher 400 Outlook 300 • Increase in demand for all products 1 000 200 • Upward price pressure d

  12. Slide 12: Base metals production

    Slide 12: Base metals production

    Base metals production Rosh Pinah • Strong zinc and stable lead concentrate production • Logistical chain to Zincor remains a challenge • Electrical reticulation upgrade underway • Life of mine extended to 10 years Zincor • Zinc metal production 3kt higher • Raw material solution for long term requi

  13. Slide 13: Base metals markets and sales

    Slide 13: Base metals markets and sales

    Base metals markets and sales Zinc metal price US$ ZAR 2010 3 000 30 000 • Higher realised zinc metal price 25 000 • Global demand for zinc metal declined by 9% 2 000 20 000 Outlook • Structural imbalance, high LME stocks 15 000 • Prices forecast to soften in 2H11 1 000 10 000 • Steady global zinc c

  14. Slide 14: Financial overview

    Slide 14: Financial overview

    Financial overview Excluding Including % Change FY10 impairment impairment R million FY09 FY09 Revenue 17 155 15 009 14 15 009 Operating expenses 14 519 13 270 (9) 14 705 Net operating profit 2 636 1 739 52 304 Operating margin (%) 15 12 25 2 Post-tax equity accounted income 3 717 1 898 96 1 898 Att

  15. Slide 15: Net operating profit

    Slide 15: Net operating profit

    Net operating profit* R million FY10 FY09 % Change Coal 2 690 1 905 41 – Tied operations 186 75 148 – Commercial operations 2 504 1 830 37 Mineral Sands 179 (124) – KZN Sands* (66) (12) (450) – Namakwa Sands 107 (110) – Australia Sands 138 (2) Base Metals (113) (8) – Rosh Pinah 143 105 36 – Zincor (

  16. Slide 16: Net operating profit: FY09 vs FY10

    Slide 16: Net operating profit: FY09 vs FY10

    Net operating profit: FY09 vs FY10* R million 1 453 (544) (662) (571) 1 221 2 636 1 739 1 739 FY09 Price Volume Exchange Inflation Cost FY10 Coal 1 905 564 764 (178) (329) (36) 2 690 Mineral Sands (124) 504 674 (486) (198) (191) 179 Base Metals (8) 141 7 102 (108) (247) (113) Other (34) 12 8 18 (27)

  17. Slide 17: Financial overview

    Slide 17: Financial overview

    Financial overview Excluding Including % Change FY10 impairment impairment R million FY09 FY09 Revenue 17 155 15 009 14 15 009 Operating expenses 14 519 13 270 (9) 14 705 Net operating profit 2 636 1 739 52 304 Operating margin (%) 15 12 25 2 Post-tax equity accounted income 3 717 1 898 96 1 898 Att

  18. Slide 18: Attributable earnings

    Slide 18: Attributable earnings

    Attributable earnings Excluding Including FY10 impairment % Change impairment R million FY09 FY09 Net operating profit 2 636 1 739 52 304 Net financing cost (455) (415) (10) (415) Income from investments 2 2 2 Post-tax equity income 3 717 1 898 96 1 898 - Sishen Iron Ore Company (SIOC) 3 623 1 762 1

  19. Slide 19: Dividend

    Slide 19: Dividend

    Dividend • Final cash dividend declared of 300 cents per share • Total dividend covered 3 times by attributable earnings Total Final Interim dividend dividend dividend 31 Dec 2010 31 Dec 2010 30 Jun 2010 Attributable earnings per share (cent) 1 501 805 696 Dividend declared (cent per share) 500 300

  20. Slide 20: Financial overview

    Slide 20: Financial overview

    Financial overview Excluding Including % Change FY10 impairment impairment R million FY09 FY09 Revenue 17 155 15 009 14 15 009 Operating expenses 14 519 13 270 (9) 14 705 Net operating profit 2 636 1 739 52 304 Operating margin (%) 15 12 25 2 Post-tax equity accounted income 3 717 1 898 96 1 898 Att

  21. Slide 21: Net debt variance: FY10

    Slide 21: Net debt variance: FY10

    Net debt variance: FY10 R million 118 1 817 2 677 3 731 4 106 125 2 220 1 056 430 256 Opening Cash Net Tax Dividends Capex Investing Dividend Other Closing balance retained financing activities received balance 2010 costs 2010

  22. Slide 22: Capital expenditure

    Slide 22: Capital expenditure

    Capital expenditure R million ESTIMATE ACTUAL FY12 FY11 FY10 FY09 Sustaining and environmental 3 956 2 244 1 155 992 – Coal 2 204 1 014 516 432 – Mineral Sands 1 610 676 398 340 – Base Metals 150 169 127 – Other 142 404 72 93 Expansion 3 717 5 957 1 522 990 – Coal* 3 655 5 872 1 225 492 – Mineral Sa

  23. Slide 23: Capital structure

    Slide 23: Capital structure

    Capital structure Ratios: FY10 FY09 Net financing cost cover (times) - EBITDA 9 7 Return on equity - attributable income (%) 34 8 Return on capital employed (%) 38 15 Maturity profile of debt R million Drawn Undrawn Repayment year Rm Corporate 3 576 355 2011 716 GMEP 4 500 2012 856 Australia Sands 7

  24. Slide 24: Strategic intent, major projects and outlook

    Slide 24: Strategic intent, major projects and outlook

    Strategic intent, major projects and outlook Sipho Nkosi: Chief Executive Officer

  25. Slide 25: Strategic intent

    Slide 25: Strategic intent

    Strategic intent • Exxaro will remain a diversified mining • Mineral Sands company – Construction of Fairbreeze mine • Coal • Base Metals – Develop more mega mines such as GMEP – Progress divestment initiatives – Increase export allocation – Develop down stream value-adding products • Iron ore and F

  26. Slide 26: Major projects

    Slide 26: Major projects

    Major projects • Safety always - All the way • Grootegeluk Medupi Expansion Project (GMEP) • Fairbreeze • Siyaya

  27. Slide 27: GMEP

    Slide 27: GMEP

    GMEP GMEP capital and coal ramp-up (Rbn) (Mt) • 41% completed by 31 January 2011 10 16 • R9,5 billion capex 8 12 • Cold commissioning: 1Q12 6 • First coal under “take or pay”: 2Q12 8 4 4 2 2009 2010 2011 2012 2013 2014 2015 Cumulative capital Coal ramp-up

  28. Slide 28: Fairbreeze

    Slide 28: Fairbreeze

    Fairbreeze Fairbreeze capital and ramp-up • Replacement of Hillendale mine (Rm) (kt) 100 – 500kt ilmenite average per year 1 000 – 60kt zircon average per year 80 800 – 25kt rutile average per year 60 600 – 12 year life of mine 400 40 • R2,4 billion capex 200 20 • Subject to normal regulatory approv

  29. Slide 29: Siyaya Programme

    Slide 29: Siyaya Programme

    Siyaya Programme • New proposed operating models for services and core business • Consultation process with labour unions started on 2 November 2010 • Implementation to start when consultation process is concluded Overall Siyaya Programme timelines 2009 2010 2011 2012 Operating Model Business Proces

  30. Slide 30: Outlook

    Slide 30: Outlook

    Outlook • Demand for most products expected to remain strong • Relative strength of the Rand and Australian Dollar will impact on earnings • Iron ore – Stable performance by SIOC expected • Coal – Stronger international prices – Similar export volumes due to logistical constraints – Eskom volumes to

  31. Slide 31: Questions

    Slide 31: Questions

    XX POSSIBILITY Questions

  32. Slide 32: Additional information

    Slide 32: Additional information

    WA Witt XX POSSIBILITY Additional information

  33. Slide 33: Net operating profit margins

    Slide 33: Net operating profit margins

    Net operating profit margins Excluding Including FY10 impairment impairment % FY09 FY09 Coal 26 20 20 – Tied operations 6 3 3 – Commercial operations 33 26 26 Mineral Sands 4 (4) (44) – KZN Sands (5) (2) (205) – Namakwa Sands 6 (8) (8) – Australia Sands 9 Base Metals (6) (1) (1) – Rosh Pinah 21 19 1

  34. Slide 34: EBITDA

    Slide 34: EBITDA

    EBITDA R million FY10 FY09 Coal 3 255 2 420 – Tied operations 226 116 – Commercial operations 3 029 2 304 Mineral Sands 797 431 – KZN Sands 194 160 – Namakwa Sands 272 105 – Australia Sands 331 166 Base Metals 31 107 – Rosh Pinah 200 166 – Zincor (112) 7 – Other (57) (66) Other (88) 5 Total EBITDA 3

  35. Slide 35: Depreciation and amortisation per segment

    Slide 35: Depreciation and amortisation per segment

    Depreciation and amortisation per segment R million FY10 FY09 Coal 608 509 – Tied operations 39 41 – Commercial operations 569 468 Mineral Sands 602 480 – KZN Sands 249 171 – Namakwa Sands 167 147 – Australia Sands 186 162 Base Metals 115 108 – Rosh Pinah 56 55 – Zincor 59 53 Other 55 39 Total 1 380

  36. Slide 36: Headline earnings

    Slide 36: Headline earnings

    Headline earnings R million FY10 FY09 Attributable earnings 5 208 1 023 Adjustments: – Impairment of property, plant and equipment (PPE) 4 1 435 – Gains or losses on disposal of PPE (26) 88 – Share of associate’s gains on disposal of PPE 1 (8) – Tax and minorities effect of adjustments (1) (24) Head

  37. Slide 37: Cash flow

    Slide 37: Cash flow

    Cash flow R million FY10 FY09 Cash retained from operations 4 106 2 117 Net financing cost (256) (381) Tax (430) (892) Dividends (1 056) (1 050) Net cash from operating activities 2 364 (206) Fixed assets (2 677) (1 982) Investments acquired (149) (8) Acquisition of Mafube JV (1 082) Dividend income

  38. Slide 38: Net financing cost

    Slide 38: Net financing cost

    Net financing cost R million FY10 FY09 Interest expense and loan cost 321 460 Finance leases 70 66 Interest income (135) (145) Net interest expense 256 381 Interest adjustment on non-current provisions 199 34 Net financing cost as per income statement 455 415

  39. Slide 39: MPower trust

    Slide 39: MPower trust

    MPower trust As at 31 December 2010 Number of beneficiaries 9 168 Share of total dividends paid or declared to date (R’000) 65 572 Paid on: – 10 September 2007 3 186 – 17 March 2008 5 310 – 22 September 2008 9 292 – 30 March 2009 10 619 – 28 September 2009 5 309 – 19 April 2010 5 309 – 4 October 201

  40. Slide 40: Physical information: power station coal

    Slide 40: Physical information: power station coal

    Physical information: power station coal '000 tonnes FY10 FY09 FY08 Production 36 767 36 562 36 700 - Grootegeluk 14 924 15 324 14 581 - Leeuwpan 1 688 1 247 1 188 - Matla 12 288 11 273 13 230 - Arnot 4 173 5 213 4 865 - NCC 115 - NBC 2 674 2 822 2 721 - Mafube 1 020 683 Sales 36 428 36 299 36 255 -

  41. Slide 41: Physical information: steam coal

    Slide 41: Physical information: steam coal

    Physical information: steam coal '000 tonnes FY10 FY09 FY08 Production 7 502 6 638 5 574 - Grootegeluk 1 441 1 207 1 387 - Leeuwpan 1 408 1 259 1 801 - NCC 850 822 984 - NBC 697 691 561 - Inyanda (1) 1 779 1 843 841 - Mafube 1 327 816 Sales 7 136 7 802 6 233 - Domestic 3 030 3 297 3 273 - Export 4 1

  42. Slide 42: Physical information: coking coal and char

    Slide 42: Physical information: coking coal and char

    Physical information: coking coal '000 tonnes FY10 FY09 FY08 Production 2 419 2 020 2 560 - Grootegeluk 2 134 1 752 2 233 - Tshikondeni 285 268 327 Sales 2 014 1 500 2 524 - ArcelorMittal 1 880 1 232 2 116 - Export 211 316 - Other 134 57 92 Physical information: char '000 tonnes FY10 FY09 FY08 Produ

  43. Slide 43: Mineral Sands: production

    Slide 43: Mineral Sands: production

    Mineral Sands: production (1) '000 tonnes FY10 FY09 FY08 - Ilmenite 718 819 718 - Zircon 196 185 193 - Rutile 63 62 59 - Synthetic rutile 90 109 113 - Pig iron 153 181 153 - Scrap iron 12 15 22 - Slag tapped 262 331 278 - Chloride slag 232 201 230 - Sulphate slag 52 44 42 - Leucoxene 13 14 16 - Pigm

  44. Slide 44: Mineral Sands: sales

    Slide 44: Mineral Sands: sales

    Minerals Sands: sales (1) '000 tonnes FY10 FY09 FY08 - Ilmenite (external sales) 40 - Zircon 243 146 206 - Rutile 79 51 55 - Synthetic rutile 30 50 62 - Pig iron 194 138 146 - Scrap iron 3 6 8 - Chloride slag 264 144 246 - Sulphate slag 39 44 43 - Leucoxene 16 15 17 - Pigment 55 54 44 (1) Includes E

  45. Slide 45: Physical information: Base Metals

    Slide 45: Physical information: Base Metals

    Physical information: Base Metals '000 tonnes FY10 FY09 FY08 Zinc concentrate (Rosh Pinah) - Production 101 94 94 - Sales: inter company 98 96 86 Lead concentrate (Rosh Pinah) - Production 19 20 20 - Sales: export 20 19 22 Zinc metal (Zincor) - Production 90 87 87 - Sales 90 93 98 Zinc metal (Chifen

  46. Slide 46: Zinc hedging: January - December 2011

    Slide 46: Zinc hedging: January - December 2011

    Zinc hedging: 1 January - 31 December 2011 Tonnes Average USD Average Year hedged price ZAR price 2011 26 700 2 061 19 976

  47. Slide 47: Project details

    Slide 47: Project details

    Project details Estimated Status Estimated Ownership Scope capex start-up Coal GMEP 14,6Mtpa R9,5bn Construction 2Q12 Committed Coal Char phase 2 140-280ktpa TBD Feasibility 2013 Coal Belfast 3-5Mtpa TBD Pre-feasibility 2014 Coal Market coke 1Mtpa TBD Pre-feasibility 2014 Coal Moranbah South (Austra

  48. Slide 48: Project pipeline

    Slide 48: Project pipeline

    Project pipeline Makhado CoAL Belfast Paardeplaats Thabametsi Phase 1 Market Completed business case Thabametsi Coke Phase 1 GMEP Concept screening Phase 2 Investment decision Mafutha JV Moranbah Char Phase 2 South Market Alloystream Trans Coke Phase 2 Energy Kalahari Rail Company Market coke Cogen

  49. Slide 49: Salient dates

    Slide 49: Salient dates

    Salient dates Last day to trade cum dividend Friday 1 April 2011 Shares trade ex-dividend Monday 4 April 2011 Record date Friday 8 April 2011 Payment date Monday 11 April 2011

  50. Slide 50: Definitions

    Slide 50: Definitions

    Definitions • Operating margin: Net operating profit as a percentage of revenue. • Net financing cost cover – EBITDA: Net operating profit (before interest, tax, depreciation, amortisation, impairment charges and net deficit/surplus on sale of investments and assets) divided by net financing cost. •

  51. Slide 51: Index

    Slide 51: Index

    Index Item Page Item Page Attributable earnings 18 Headline earnings 36 Commodities Projects 26, 47,48 – Base Metals – GMEP 27 Hedging 46 – Fairbreeze 28 Production 12, 45 – Siyaya 29 Markets and sales 13, 45 MPower trust 39 – Coal Net debt variance 21 Production 8, 40 - 42 Net financing cost 38 Mar

Source: Internet Archive copy of exxaro.com

More decks from Exxaro Resources Limited

All 59 Exxaro Resources decks