UK Oil & Gas PLC · LSE:UKOG
UK Oil & Gas — Investor Presentation (May 2025)
6 slides from UK Oil & Gas's investor presentation, May 21, 2025
Slide 1: Dorset Clean Energy Super Cluster: £28bn investment
Dorset Clean Energy Super Cluster: £28bn investment
Slide 2: UKEn South Dorset H₂ Storage
UKEn South Dorset H₂ Storage National Gas Project Union Hydrogen Pipeline £1.5 bn Investment* • Key enabler for UK National Hydrogen system & Clean Power £2.3 bn/yr GVA** • Up to 60-year life • Sole at scale storage node in S UK H₂ H₂ H₂ • Modular: up to 24 new salt caverns • Critical for H₂ backbon
Slide 3: Why Dorset H₂ Storage: Enabler for UK hydrogen
Why Dorset H₂ Storage: Enabler for UK hydrogen
Slide 4: Why Hydrogen Storage & Salt Caverns?
Why Hydrogen Storage & Salt Caverns? 1. Hydrogen Battery: solve renewable intermittence 2. Balance supply & demand 3. Maintain pipeline pressure/fill
Slide 5: UKEn Dorset: Key element of UK H₂ infrastructure
UKEn Dorset: Key element of UK H₂ infrastructure Oxford London Milford Haven Reading LHR Grain LNG Hinkley Point Fawley LGW Dorset Salt refinery Basin (SAF) UKEn H₂ storage Southampton Brighton Portsmouth 1 bn m³/max 30 TWh Solent Hydrogen Cluster Portland Port Plymouth 1 GW H₂ generation H2 Connect
Slide 6: South Dorset Hydrogen Storage Economic Benefits
South Dorset Hydrogen Storage Economic Benefits Material Economic Benefits to UK and Dorset Economies ➢ £2.28 bn/year GVA during 30-60 year operational life (Quod Economic Impact report) ➢ 2,100 direct + 5,100 supply chain jobs, 135 permanent jobs in site operations Significant National Scale Contri