Entergy Corporation · NYSE:ETR

Entergy — Q1 2025 Earnings Presentation

39 slides from Entergy's earnings presentation, Apr 29, 2025

  1. Slide 1: First quarter 2025 earnings call

    First quarter 2025 earnings call 0 April 29, 2025

  2. Slide 2: Caution regarding forward-looking statements and Regulation G compliance

    Caution regarding forward-looking statements and Regulation G compliance In this presentation, and from time to time, Entergy Corporation makes certain “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements include, am

  3. Slide 3: Table of contents

    Table of contents Section Slides Business discussion 3–7 Appendix About Entergy 9 Utility 10–28 Financial disclosures 29–32 Financial summaries and Regulation G reconciliations 33–37 2

  4. Slide 4: Highlights

    Highlights  First quarter results: 1Q25 adjusted EPS – Strong retail sales growth, $0.82 including 9.3% industrial growth – Successfully sold forward an 1Q25 OCF $536M additional $1.7 billion equity; equity needs into 2027 contracted – Affirming guidance and outlooks 3 See Financial summaries and R

  5. Slide 5: First quarter adjusted earnings per share

    First quarter adjusted earnings per share Entergy adjusted EPS; $ 0.03 0.09 0.01 (0.03) (0.10) (0.02) (0.03) 0.33 0.87 0.87 0.87 0.86 0.84 0.84 0.82 0.82 0.54 0.54 1 1Q24 Utility Utility Utility Utility Utility P&O Income Share effect 1Q25 operating other other other interest taxes – / other 1 rev.

  6. Slide 6: Credit

    Credit Credit metric outlooks remain within or better than agency thresholds Credit ratings1 (outlooks) E-AR E-LA E-MS E-NO E-TX SERI ETR Moody’s A2 A2 A2 Baa2 A3 Baa2 Baa2 (stable) (stable) (stable) (stable) (stable) (stable) (stable) S&P A A A BBB A BBB+ BBB+ (stable) (stable) (stable) (stable) (s

  7. Slide 7: Equity plan

    Equity plan Equity needs into 2027 successfully sold forward Illustrative Equity needs; $B Equity cash inflow by year 27E–28E 25E–26E Completed1 Remaining need to be contracted contracted  Forward 1.5 offering in 1Q25  Forwards using Sufficient market capacity 1.6 ATM 1.6 to satisfy with ATM Settl

  8. Slide 8: Affirming adjusted EPS guidance and outlooks

    Affirming adjusted EPS guidance and outlooks Greater than 8% CAGR1 through 28E Entergy adjusted EPS; $ 5.10–5.40 4.65–4.95 4.25–4.45 3.65 3.75–3.95 24 25E 26E 27E 28E guidance outlook outlook outlook As-reported 2.45 7 1. From 2024 adjusted EPS

  9. Slide 9: Appendix

    Appendix eS) entergy

  10. Slide 10: About Entergy

    About Entergy Vertically integrated utility with five operating companies in four states – AR, LA, MS, and TX 3 million retail customers 24,479 MW owned and leased generating assets 16,100 circuit miles of interconnected high-voltage transmission lines 106,900 circuit miles of distribution lines 202

  11. Slide 11: Utility overview

    Utility overview E-AR E-LA1 E-MS E-NO1 E-TX • Electric utility – • Electric and gas utility • Electric utility – • Electric and gas utility • Electric utility – 735,000 customers – 1,110,000 electric 459,000 customers – 209,000 electric 524,000 customers • Authorized ROE: customers • Authorized ROE:

  12. Slide 12: Utility 2024 weather-adjusted electric retail sales

    Utility 2024 weather-adjusted electric retail sales 123 TWh Governmental E-TX E-AR 2% 17% 19% Residential 29% E-NO 5% By By Industrial operating 46% customer E-MS company class 10% Commercial E-LA 23% 49% 11

  13. Slide 13: Utility generation overview

    Utility generation overview Renewables 1 Renewables 2% Coal 3% Purchases 8% CT / CCCT 16% 43% Coal CT / CCCT 3% 42% Nuclear Owned and 2024 sources 21% leased capability of energy as of 12/31/24 142 TWh 24 GW Nuclear 27% Legacy gas / oil Legacy gas 25% 10% Note: the percentage of renewable and nuclea

  14. Slide 14: New generation to meet growing demand

    New generation to meet growing demand Approved / in progress Regulatory reviews pending Owned / Est. in Owned / Est. in Project MW PPA service1 Project MW PPA service1 Flat Fork Solar (E-AR) 200 PPA 2025 ETR OpCo filings Forgeview Solar (E-AR) 200 PPA 2025 Segno Solar (E-TX) 170 Owned 2027 Votaw Sol

  15. Slide 15: Jurisdictional base rate filing frameworks

    Jurisdictional base rate filing frameworks E-AR E-LA1 E-MS E-NO1 E-TX2 SERI Latest filing 7/5/24 (FRP) 8/27/24 (FRP) 2/28/25 (FRP) 4/30/24 (FRP) 7/1/22 Monthly cost of date (rate case) service Rate effective Jan. following filing Sept. following filing April following filing Sept. following filing 3

  16. Slide 16: Regulatory timeline

    Regulatory timeline Regulatory activities 2Q25 3Q25 4Q25 1Q26 FRPs E-AR Filing  E-LA Filing  E-MS Filing E-NO Filing  Significant investment proposals E-LA invest. for new customer Filing E-LA resilience rider Filing  Filing  E-LA West Bank 500kV Filing E-TX generation CCN Filing E-TX renewable

  17. Slide 17: Entergy Arkansas

    Entergy Arkansas E-AR (currently in rates) Metric Detail Authorized ROE 9.15% – 10.15% Rate base $11.3B retail rate base (2025 test year) WACC (after-tax) 5.58% Equity ratio 37.9% (47.0% excluding $2.0B ADIT at 0% rate) Regulatory construct Forward test year FRP; result outside ROE band reset to mid

  18. Slide 18: Entergy Louisiana

    Entergy Louisiana E-LA (currently in rates) Metric Detail – electric Detail – gas1 Authorized ROE 9.3% – 10.1% 9.3% – 10.3% Rate base $16.4B (12/31/23 test year) $0.16B + $0.1B TRM, $0.4B DRM, $(0.4B) tax reform, (9/30/23 test year) $0.3B RPCR WACC (after-tax) 6.81% 7.08% Equity ratio 50.81% 54.35%

  19. Slide 19: E-LA investment to support new customer

    E-LA investment to support new customer Filing request highlights (docket U-37425) • Generation and transmission resources proposed in connection with service to a new hyperscale data center in north Louisiana, including: – three new CCCTs totaling 2,262 MW, each of which will be enabled for future

  20. Slide 20: E-LA framework to accelerate storm securitization

    E-LA framework to accelerate storm securitization Filing request highlights (docket TBD) • Framework establishing a 120-day timeline for the LPSC to issue an order on future requests for securitization of storm restoration costs • Accelerated timeline would reduce carrying costs for customers • Full

  21. Slide 21: E-LA West Bank 500kV transmission filing

    E-LA West Bank 500kV transmission filing Filing request highlights (docket U-37467) • A portfolio of Amite South transmission projects located on the west bank of the Mississippi River, including construction of a new 84-mile 500kV line • Total estimated cost $955M • Proposed recovery through TRM, i

  22. Slide 22: Entergy Mississippi

    Entergy Mississippi E-MS (currently in rates) Metric Detail Authorized ROE 11.25% performance-adjusted midpoint (10.90% + 0.35% performance factor); 10.25% – 12.26% range (reset annually based on formula) Rate base $4.6B (2025 forward test year) WACC (after-tax) 7.69% Equity ratio 49.83% Regulatory

  23. Slide 23: Entergy New Orleans

    Entergy New Orleans E-NO (currently in rates) Metric Detail – electric Detail – gas1 Authorized ROE 8.85% – 9.85% (9.35% midpoint) Rate base $1.3B $0.2B (12/31/23 test year plus known and measurables through 12/31/24) WACC (after-tax) 7.28% Equity ratio 55% Regulatory FRP with forward-looking featur

  24. Slide 24: Entergy Texas

    Entergy Texas E-TX (currently in rates) Metric Detail Authorized ROE 9.57% Rate base $4.4B (12/31/21 test year) +$0.5B DCRF, $0.1B TCRF(through 6/30/24) WACC (after-tax) 6.61% Equity ratio 51.2% Regulatory Historical test year rate case1; interim rate base construct riders: TCRF2, DCRF3, and GCRR4 K

  25. Slide 25: E-TX generation CCN filing

    E-TX generation CCN filing Filing request highlights (docket 56693) Item Legend Power Station Lone Star Power Station MW 754 453 Est. total investment $1.6B $0.8B Plant type CCCT with H2 capability and CT with H2 capability CCS-enabled Location Jefferson County, TX San Jacinto County, TX In-service

  26. Slide 26: E-TX renewable CCN filing

    E-TX renewable CCN filing Filing request highlights (docket 56865) Item Segno Solar Votaw Solar MW 170 141 Plant type Solar photovoltaic Solar photovoltaic Location Polk County, TX Hardin County, TX In-service date 2027 2028 Recovery mechanism GCRR GCRR Key dates Date Event 5/19/25 Initial post-hear

  27. Slide 27: E-TX DCRF filing

    E-TX DCRF filing Filing request highlights (docket 57899) • $188M net distribution investment from 7/1/24 through 12/31/24 • $29M incremental revenue requirement • ROE, WACC, and equity ratio from most recent rate case Key dates Date Event 6/3/25 Targeted decision 26 See discussion in Rate and Regul

  28. Slide 28: E-TX SETEX 500kV transmission CCN filing

    E-TX SETEX 500kV transmission CCN filing Filing request highlights (docket 57648) • 500 kV transmission line and two stations and associated 138/230 kV facilities − ~131–160 line miles − Babel 500kV switching station and Running Bear substation • Total estimated cost ~$1.3B – $1.5B • Recovery throug

  29. Slide 29: System Energy Resources

    System Energy Resources Grand Gulf Nuclear Station Energy and capacity allocation1 SERI (most recent monthly bill) E-AR Metric Detail E-NO 24% 20% Principal asset Ownership and leasehold interest in GGNS Authorized ROE 9.65% Last calculated $1.85B rate base WACC (after-tax) 7.46% Equity ratio 51.6%

  30. Slide 30: Financial disclosures

    29 Financial disclosures eS) entergy

  31. Slide 31: Progress against guidance

    Progress against guidance Guidance YTD Driver assumption1 result1 Full-year comments ETR adjusted EPS 3.75–3.95 0.82 Estimated weather in sales Normal 0.05 Weather-adj. retail sales volume ~0.25 0.09 Now expect ~0.20 YoY ~6% 5.2% Now expect ~5.5% Utility other O&M ~0.15 0.03 Now expect ~0.10 YoY • E

  32. Slide 32: 2025 ETR adjusted EPS sensitivities

    2025 ETR adjusted EPS sensitivities Estimated annual EPS Variable Description of sensitivity impact (+/-) Utility Retail sales volume 1% change in residential MWh sold ~0.03 incremental to plan1 1% change in commercial MWh sold ~0.015 1% change in industrial MWh sold ~0.01 Other O&M 1% change in exp

  33. Slide 33: Debt financing activity

    Debt financing activity 1Q25 debt financing activity Amount OpCo Activity Date Rate ($M) Maturity Notes E-LA Issuance 1/7/25 5.80% 750 3/15/34 To repay debt outstanding, capital expenditures, and for general corporate purposes E-NO Issuance 2/21/25 5.77%1 80 3/20/26 To repay debt outstanding and for

  34. Slide 34: Financial summaries and Regulation G reconciliations

    Financial summaries and Regulation G reconciliations 33

  35. Slide 35: Earnings summary

    Earnings summary Table 1: First quarter earnings summary $ in millions Per share in $ 1Q25 1Q24 1Q25 1Q24 As-reported (after-tax) Utility 490 195 1.11 0.46 Parent & Other (129) (120) (0.29) (0.28) Consolidated 361 75 0.82 0.18 Less adjustments Utility - (155) - (0.36) Parent & Other - - - - Consolid

  36. Slide 36: Regulation G reconciliations

    Regulation G reconciliations Table 2: ETR adjusted earnings Reconciliation of GAAP to non-GAAP measures 1Q25 1Q24 (Pre-tax except for income taxes and totals; $ in millions) Net income (loss) attributable to ETR Corp. 361 75 Less adjustments: Utility - 1Q24 E-AR write-off of a regulatory asset relat

  37. Slide 37: Regulation G reconciliations

    Regulation G reconciliations Table 2: ETR adjusted earnings Reconciliation of GAAP to non-GAAP measures 2024 (Pre-tax except for income taxes and totals; $ in millions) Net income (loss) attributable to ETR Corp. 1,056 Less adjustments: Utility - 4Q24 E-LA adjustment to a regulatory liability primar

  38. Slide 38: Utility book ROEs

    Utility book ROEs Table 3: Utility book ROE summary LTM ending March 31, 2025 ($ in millions) E-AR E-LA E-MS E-NO E-TX Utility1 As-reported earnings available to common stock (a) 443 959 276 77 322 2,121 Less adjustments: 2Q24 E-LA global agreement to resolve its FRP extension filing and other retai

  39. Slide 39: ETR

    5) entergy