St. Barbara Ltd. · ASX:SBM

St. Barbara — Diggers & Dealers Mining Forum 2018

45 slides from St. Barbara's conference presentation, Aug 6, 2018

  1. Slide 1: Presentation to Diggers and Dealers Mining Forum

    ASX Release / 6 August 2018 Presentation to Diggers and Dealers Mining Forum Attached is a presentation by Bob Vassie, Managing Director and CEO, to the Diggers and Dealers Mining Forum in Kalgoorlie, Western Australia. Investor Relations Mr David Cotterell Manager Investor Relations +61 3 8660 1959

  2. Slide 2: Diggers & Dealers Mining Forum

    BOB VASSIE, MANAGING DIRECTOR & CEO / 6-8 August 2018 Diggers & Dealers Mining Forum

  3. Slide 3: Disclaimer

    Disclaimer This presentation has been prepared by St Barbara Limited (“Company”). The material contained in this presentation is for information purposes only. This presentation is not an offer or invitation for subscription or purchase of, or a recommendation in relation to, securities in the Compa

  4. Slide 4: Contents

    Contents • Overview • Safety • Highlights • Operations & Growth • Exploration • Strategy • Conclusion Gwalia mine - June 2018 3/ Diggers & Dealers Mining Forum – 6-8 August 2018

  5. Slide 5: Corporate Overview

    Corporate Overview ASX 200 (ASX: SBM; ADR: STBMY), est. 1969 Papua Simberi Commodity Gold (Au) New Guinea Market cap2 A$2.2B @ A$4.17/sh Shares2 521 M Liquidity5 3.2 M/day (0.6%) H1 FY18 EPS6 A$0.21 H1 FY18 Dividend A$0.04 Australia Leonora Cash and cash deposits7 A$344 M (Gwalia mine) Debt Nil Ore

  6. Slide 6: St Barbara Safety Focus

    St Barbara Safety Focus Total Recordable Injury Frequency Rate1 6.0 5.0 4.1 2.4 2.6 2.1 2.1 1.2 1.2 FY 13 FY 14 FY15 FY16 FY17 Q1 Q2 Q3 Q4 FY18 FY18 FY18 FY18 • TRIFR corresponds to 9 low range injuries in last 12 mths • Corresponding LTIFR (lost time/ ’serious’ injury frequency rate) of 0.5 to 30 J

  7. Slide 7: Strong margins & liquidity, actively growing, well positioned

    Strong margins & liquidity, actively growing, well positioned Operational •Record FY18 production 403 koz @ record low AISC1 of A$891/oz excellence •Cornerstone Gwalia Mine with Life of Mine Plan to FY31 •Simberi mine life extension to FY21 Financial •EBITDA margin of 49%2 performance •A$870/oz cash

  8. Slide 8: Balance Sheet

    Balance Sheet Cash and cash deposits at FY18 of A$344M , no debt1 A$M Cash, cash deposits and debt 400 344 300 262 216 116 199 Cash deposits 200 161 137 79 77 100 228 Cash 0 -1 -100 Debt -200 -226 -300 -340 -347 -400 FY14 FY15 FY16 FY17 Q1 Q2 Q3 Q4 FY18 FY18 FY18 FY18 1. Amounts rounded to nearest $

  9. Slide 9: Main current projects - timeline

    Main current projects - timeline FY18 FY19 FY19 Q3 Mar Q4 Jun Q1 Sep Q2 Dec Q3 & beyond Gwalia Extension Project construction (completion due Q2 Dec FY20) Gwalia Mass Extraction feasibility study Investment decision Dec 2018 Gwalia 2600 mbs hole drilling analysis and further drilling Gwalia 3D Targe

  10. Slide 10: Gwalia production year on year

    Gwalia production year on year Mined Grade 12.5 (g/t Au) 10.7 10.5 8.8 8.9 9.3 8.2 8.4 6.9 6.3 5.7 Reserve Grade 7.8 g/t Au June 2017 Production 267 265 268 260 (koz) 248 245 214 AISC 185 183 (A$/oz) 950 940 131 841 802 783 785 109 83 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19

  11. Slide 11: Gwalia animation

    Gwalia animation Animation of Gwalia underground mine available at https://youtu.be/ya-GEzscdCY 10 / Diggers & Dealers Mining Forum – 6-8 August 2018

  12. Slide 12: Gwalia Extension Project update – on schedule

    Gwalia Extension Project update – on schedule • Gwalia Extension Project (GEP) consists of two main • Raise bore activities progressing to schedule with components, a ventilation upgrade and paste second surface shaft pilot hole complete aggregate fill (PAF)1 • Plan now anticipates some concurrent r

  13. Slide 13: Gwalia Mass Extraction – PFS (Original)

    Gwalia Mass Extraction – PFS (Original) • Pre-feasibility Study announced February 2018 • Comprises selective “island pillar” mining and hydraulic hoisting • Supports mine life to FY31 12 / Diggers & Dealers Mining Forum – 6-8 August 2018 For details refer to ASX release 26 July 2018 ‘Quarterly Repo

  14. Slide 14: Gwalia Mass Extraction – PFS (Alternative)

    Gwalia Mass Extraction – PFS (Alternative) • Feasibility Study considering alternative 3- stage crushing underground 13 / Diggers & Dealers Mining Forum – 6-8 August 2018 For details refer to ASX release 26 July 2018 ‘Quarterly Report Q4 June FY18’

  15. Slide 15: Exploration | Gwalia Deeps, Seismic and 2600 mbs targets

    Exploration | Gwalia Deeps, Seismic and 2600 mbs targets FY19 2600mbs Drilling • 2,600 mbs hole completed in July 2018 intersecting four mineralised zones • Confirms Gwalia ore lodes are continuous to at least 2,700 mbs 14 / Diggers & Dealers Mining Forum – 6-8 August 2018 For full explanation and r

  16. Slide 16: Exploration | Gwalia Deeps, Seismic and 2600 mbs targets

    Exploration | Gwalia Deeps, Seismic and 2600 mbs targets Gwalia Seismic Exploration • Two hole drill program completed in Q4 June FY18 showed shearing and alteration similar to the Gwalia deposit • Downhole surveys planned in Q1 Sep FY19 for future drill targeting • Further seismic testing planned i

  17. Slide 17: Simberi production year on year

    Simberi production year on year AISC1 (A$/oz) New Life of mine plan 2,300 • Recent work on Simberi’s life of mine plan has 1,464 1,293 1,325 extended oxide mine life to the end of FY21 1,187 1,068 • Mining continues through FY19 and FY20 • Low grade stockpiles accumulated over FY18 to 135 FY20 to be

  18. Slide 18: Simberi Strategic Review

    Simberi Strategic Review • Decision in November 2016 to retain Simberi operating assets was the right one • Cash contribution1 since the decision to retain the asset is A$126 million Quarterly cash contribution from Simberi A$M Decision to retain $82 M FY18 24 24 23 23 19 20 12 12 10 9 8 5 5 2 -4 $1

  19. Slide 19: Exploration | Simberi Island, PNG, Q4 June FY18

    Exploration | Simberi Island, PNG, Q4 June FY18 Sorowar Pit Best results include: SORDGC001 – 28m @ 1.37g/t Au from 114m SORDGC002 – 19m @ 4.96g/t Au from 82m SORDGC007 – 20m @ 8.42g/t Au from 60m; and 15m @ 7.08g/t Au from 89m All intercepts downhole, for full explanation and results refer to ASX r

  20. Slide 20: Exploration | Simberi Island, PNG, Q4 June FY18

    Exploration | Simberi Island, PNG, Q4 June FY18 One of four sections, remaining sections in appendix. For full explanation and results refer to ASX 19 / Diggers & Dealers Mining Forum – 6-8 August 2018 release 26 July 2018 ‘Quarterly Report Q4 June FY18’

  21. Slide 21: Simberi Sulphide – potential long life mine extension

    Simberi Sulphide – potential long life mine extension 1.4 Moz Sulphide Reserve @ 3.5 g/t Au, 3.2 Moz Sulphide Resource @ 1.8 g/t Au Simberi Sulphide PFS Capex US$100 million • Focused exploration for sulphide ore Annual Production 130,000 ounces over 8 years underway to improve project economics (1

  22. Slide 22: Exploration | FY19 Guidance - A$21 to A$27 million

    Exploration | FY19 Guidance - A$21 to A$27 million A$9 – A$12 million Leonora • Greater Gwalia Area • Gwalia Deep Drilling • Gwalia Seismic A$4 – A$5 million Pinjin WA • Aircore drilling of identified targets A$8 – A$10 million PNG • Simberi Oxides/Sulphides and Porphyry • Tatau Sulphides In additio

  23. Slide 23: Exploration activities

    Exploration activities Leonora, Western Australia Pinjin, Western Australia Simberi Island Group (PNG) For full explanation and results refer to ASX release 26 July 2018 ‘Quarterly Report Q4 June FY18’ 22 / Diggers & Dealers Mining Forum – 6-8 August 2018

  24. Slide 24: Growth Pipeline

    Growth Pipeline Exploration Feasibility Construction Production Back Creek Pinjin Australia Greater Catalyst Gwalia Metals Peel 16% Mining Gwalia Tower Gwalia 16%. GMX Hill Extension Gwalia Mine Prodigy Duketon Gold2 Mining 10% 12% Inorganic growth Evaluating exploration, project, development and op

  25. Slide 25: Strategy for the next 5 years – “stronger for longer”

    Strategy for the next 5 years – “stronger for longer” Diversify production base Seeking a portfolio of robust operations Sustainable long life operations Aiming for above average mine life at bottom-third AISC Quality growth pipeline Actively add, manage and progress assets in all phases of the pipe

  26. Slide 26: Gender Diversity

    Gender Diversity • WGEA Employer Of Choice For Gender Equality in 2014-15, 2015-16, 2016-17 and 2017-18 and the only mining company to be certified in 2017-18. • 2017 Winner Excellence in Diversity Programs and Performance, National Women in Resources Awards • 2018 Winner of AMMA’s Australian Women

  27. Slide 27: Shooting Stars for Leonora

    Shooting Stars for Leonora Shooting Stars – education through netball for Aboriginal girls Our commitment • St Barbara has committed $100,000 per year for three years, joining with Saracen and others to support the initiative • Aim of the program is to increase Leonora District High School Aborigina

  28. Slide 28: Conclusion

    Conclusion • Yet another record year – production, costs and cash flow • Outlook for production, cash flow and cash reserves remains positive • Paying fully franked dividends • Near-term growth options at current operations: • Gwalia extension project & mass extraction • Simberi sulphide exploration

  29. Slide 29: Questions?

    Questions? Gwalia - June 2018 28 / Diggers & Dealers Mining Forum – 6-8 August 2018

  30. Slide 30: Appendices

    Appendices Gwalia - June 2018 29 / Diggers & Dealers Mining Forum – 6-8 August 2018

  31. Slide 31: Exploration | Gwalia Deeps, Seismic and 2600 mbs targets

    Exploration | Gwalia Deeps, Seismic and 2600 mbs targets Gwalia deep drilling objectives • Further drilling 2,000 to 2,200 mbs seeking to extend Indicated Resource • Additional targets identified from 3D seismic model 30 / Diggers & Dealers Mining Forum – 6-8 August 2018 For full explanation and res

  32. Slide 32: Gwalia Deeps 1540 – 1580 lode schematic

    Gwalia Deeps 1540 – 1580 lode schematic 31 / Diggers & Dealers Mining Forum – 6-8 August 2018 Reproduced from ASX release 25 September 2017 ‘Denver Gold Forum 2017’

  33. Slide 33: Gwalia Mining Strategy

    Gwalia Mining Strategy Mining method Dual Lift Stoping in SWB mining sequence manages the hanging wall • Long hole stoping with fill • North & South access on two FY11 dual lift levels gives 4 mining 2 areas • Greater percentage of free 1 5 bogging increases productivity of each stope 4 • Sill drive

  34. Slide 34: Gwalia Production Profile – ‘Centre out’ method

    Gwalia Production Profile – ‘Centre out’ method Objective: Maximise production, constrained by: 1) Waiting for adjacent/above stope’s paste fill to dry Plunge, centre 2) Geotech considerations – not too many open stopes of lode too close together = ‘Centre out’ method Historical stopes (light blue)

  35. Slide 35: Gwalia Mass Extraction PFS – Alternative Flow Sheet

    Gwalia Mass Extraction PFS – Alternative Flow Sheet 34 / Diggers & Dealers Mining Forum – 6-8 August 2018 For details refer to ASX release 26 July 2018 ‘Quarterly Report Q4 June FY18’

  36. Slide 36: Exploration | Simberi Island, PNG, Q4 June FY18

    Exploration | Simberi Island, PNG, Q4 June FY18 35 / Diggers & Dealers Mining Forum – 6-8 August 2018 For full explanation and results refer to ASX release 26 July 2018 ‘Quarterly Report Q4 June FY18’

  37. Slide 37: Exploration | Simberi Island, PNG, Q4 June FY18

    Exploration | Simberi Island, PNG, Q4 June FY18 36 / Diggers & Dealers Mining Forum – 6-8 August 2018 For full explanation and results refer to ASX release 26 July 2018 ‘Quarterly Report Q4 June FY18’

  38. Slide 38: Exploration | Simberi Island, PNG, Q4 June FY18

    Exploration | Simberi Island, PNG, Q4 June FY18 37 / Diggers & Dealers Mining Forum – 6-8 August 2018 For full explanation and results refer to ASX release 26 July 2018 ‘Quarterly Report Q4 June FY18’

  39. Slide 39: Sustainability Report

    Sustainability Report Sustainability Report Sustainability Report topics • Complements Annual Report and Corporate Governance & Economic Performance Governance Statement • Core values and Code of Conduct • Disclosure guided by GRI standards • Ethical business conduct with all stakeholders • Manage f

  40. Slide 40: Reserves and Resources as at 30 June 2017

    Reserves and Resources as at 30 June 2017 Ore Reserves Gwalia Reserves (Moz) 4.3 4.0 • Increased by net 325 koz after depletion 1.4 Simberi Sulphide 1.3 0.5 Simberi Oxide • Lower average grade 8.3 to 7.8 g/t Au 0.6 0.3 0.3 Tower Hill • Cost of discovery at depth in FY17 A$23/oz 2.1 Gwalia 1.8 Gwalia

  41. Slide 41: Gwalia – lowest expected mined depth

    Gwalia – lowest expected mined depth Lowest Expected Mined Depth in Year mbs FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19F FY20F FY21F FY22F 1000 1100 1200 1220 1300 1400 Mineral Resources 1380 Ore Reserves 1420 1500 1500 1600 1540 1580 1620 1700 1800 1740 1780 1820 2000 2200 2140 Ore Rese

  42. Slide 42: Gwalia – depth of Ore Reserves

    Gwalia – depth of Ore Reserves 2.5 0.27 Moz Production 2.0 0.21 Moz 0.27 Moz Ore Reserves 0.25 Moz At end of year 1.5 (+ production during year) (Moz) 1.0 1.9 Moz 2.1 Moz Reserves 1.6 Moz 1.8 Moz 0.5 0.0 30 Jun 2014 30 Jun 2015 30 Jun 2016 30 Jun 2017 0 Maximum Depth 500 of Ore Reserves (mbs) 1000 1

  43. Slide 43: Competent Persons Statement

    Competent Persons Statement Exploration Results The information in this presentation that relates to Exploration Results for Simberi and Pinjin is based on information compiled by Dr Roger Mustard, who is a Member of The Australasian Institute of Mining and Metallurgy. Dr Mustard is a full-time empl

  44. Slide 44: Non-IFRS Measures

    Non-IFRS Measures We supplement our financial information reporting determined under International Financial Reporting Standards (IFRS) with certain non-IFRS financial measures, including cash operating costs. We believe that these measures provide meaningful information to assist management, invest

  45. Slide 45: Investor Relations Enquiries

    Investor Relations Enquiries Rowan Cole David Cotterell Company Secretary Manager Investor Relations T: +61 3 8660 1900 E: info@stbarbara.com.au Gwalia Board visit November 2017, Underground, L to R: Ashleigh Smyth - Graduate Geologist, Kerry Gleeson – Director, 44 / Diggers & Dealers Mining Forum –

St Barbara — Diggers & Dealers Mining Forum 2018 on 6ix