  1. Slide 1: Investor Update January 2025

    January 2025 Investor Update A NewFortress energy

  2. Slide 2: NFE Corporate Overview

    NFE Corporate Overview 2. FLNG 1 Overview 3. FLNG 2 Overview

  3. Slide 3: NFE Corporate Overview

    NFE Corporate Overview Terminals) Customers served”) = 251 TBtu 12 years 2026 estimated LNG ‘Avg. contract Za Montego Bay / Old Harbour / supply & demand®) duration”) (EE \ Jamalco CHP, Jamaica La Paz, Mexico ~ ~~, (, n Juan, Puerto Rico, . DN. ~9 GW 4.2 MTPA Altantiva, Mexic Power owned, Liquefacti

  4. Slide 4: NFE is reaffirming guidance for Q4 & FY 2024

    NFE Corporate Overview NFE is reaffirming guidance for O4 & FY 2024 rack for 2024 AEBITDA target of $835 - $855 Forecast + FLNG 1 advancing in Smm, except where noted 2023 Q1-24 Q2-24 3-24 4-24 2024 Pe een phase producing above 1.4.MTPA nameplate capacity he Seren $2,435 $690 $428 $525 ~$475() ~$2.1

  5. Slide 5: Notable events: Fast LNG, Puerto Rico, Brazil, refinancing

    Fast LNG Puerto Rico Corporate refinancing NFE Corporate Overview Notable events In final phase of commissioning Have completed 9 portfolio cargo transfers Expect annual production to be in excess of nameplate capacity Signed new GSA for 478 MW power plant * 20-year HH based gas contract with signif

  6. Slide 6: NFE Corporate Overview

    NFE Corporate Overview NFE's first country ~10 years ago Series of gas & power customer contracts with significant duration (~20 years) * Long-term gas supply matches downstream demand; provides stable net margins with minimal commodity exposure Significant growth opportunities for new power & bunke

  7. Slide 7: NFE Corporate Overview

    1. NFE Corporate Overview (2. FLNG 1 Overview: 3. FLNG 2 Overview

  8. Slide 8: How did we build Fast LNG 1?

    FLNG 1 Overview How did we build Fast LNG 1? Built “modules” at Kiewit shipyard utilizing existing LNG technology (jackup rigs) Selected blue chip partners for engineering, procurement & construction “hese; Used existing marine infrastructure T ZS = SIEMENS Baker Arendal FLUOR, Honeywell @Kiewit

  9. Slide 9: First LNG cargoes sold to date

    FLNG 1 Overview First LNG(5) 9 cargoes A sold to date

  10. Slide 10: FLNG is producing above nameplate capacity

    FLNG 1 Overview FLNG 1 is producing above name plate capacity FLNG 1 has been steadily producing at 1.67 MTPA (440 m3/hour) 120% of name plate capacity FLNG 1 production 11,000.00 Cold box LNG production 10,500.00 = —+ 10,000.00 9,500.00 9,000.00 Nameplate capacity 8,500.00 8,000.00 7,500.00 1/17/20

  11. Slide 11: Only Gulf Coast liquefier permitted to export LNG to Puerto Rico

    FLNG 1 Overview FLNG 1 is the only LNG liquefier in the Gulf Coast that is permitted to export LNG to Puerto Rico Current downstream.committed volumes. ~75 TBtu.with.potential to grow.to.~200+ TBtu with short-term conversion opportunities & long-term new build opportunities in Puerto Rico Shuttle sh

  12. Slide 12: Phase I: Existing FLNG & power plants

    PhaseJ: Existing FLNG 1 & power plants FLNG 1: 1.4 MTPA online (offshore) San Juan LNG terminal & power plants FLNG 1 Overview 12

  13. Slide 13: NFE Corporate Overview

    1. NFE Corporate Overview 2. FLNG 1 Overview 13,

  14. Slide 14: FLNG 2 leverages FLNG 1 design and engineering

    FLNG 2 Overview @ ©O 8 | Reduced costs & increased speed to operations by leveraging FLNG 1 design & engineering Cost synergies as result of shared personnel, management & logistics Time & price certainty as result of turnkey-EPC, procurement of long lead time equipment, & advanced engineering & civ

  15. Slide 15: Identical equipment procured for FLNG 2

    Gas turbine generators Transformers BOG compressor FLNG 2 Overview We are utilizing identical equipment from the same manufacturers to accelerate the construction process SIEMENS FLNG 1 + MR compressor purchased + Installed Cold Boxes purchased Installed + GT generators purchased Installed + Transfo

  16. Slide 16: FLNG 2 under development timeline

    FLNG 2 Overview Q2 Q2 2023 2026 Procurement Modules to begins ship from Kiewit Shipyard FLNG 2 is under development & expect 70 TBtu (1.4mm tonnes) production 16

  17. Slide 17: Disclaimers

    Disclaimers NO OFFER; NO RELIANCE. This Presentation is for informational purposes only and does not constitute an offer to sell, or a solicitation of an offer to buy, any security and may not be relied upon in connection with the purchase ‘or sale of any security. You should not rely on this Presen

  18. Slide 18: Disclaimers

    Disclaimers PAST PERFORMANCE. Our past performance is not a reliable indicator or indicative of future results and should not be relied upon for any reason. There can be no assurance that the future performance of the Company, or any project, investment or asset of the Company, will be profitable or

  19. Slide 19: Endnotes

    Endnotes Reserved. ‘Adjusted EBITDA‘ is not a measurement of financial performance under GAAP and should not be considered in isolation or as an altemative to income from operations, net income, cash flow from operating activites or any other measure of performance or liquidity derived in accordance

  20. Slide 20: Endnotes

    10, " 12, 13 M4 15. € Endnotes Reflects Management's estimates for total customers and the average duration of those customers’ contracts with the Company as of the date of this presentation, Many of these contracts relate to projects and facilities of the Company that are not yet complete. These co

  21. Slide 21: Endnotes

    16. W. 18. Endnotes Reflects management's current plans for FLNG 2 Development and the conversion of existing power plants and the building of new plants in Puerto Rico. There can be no assurance that management's plans will be successful or completed in the projected time frame. ‘The Altamira impor