Cvw Sustainable Royalties Inc. · TSXV:CVW

Cvw Sustainable Royalties — CVW CleanTech — Investor Presentation (June 2024)

28 slides from Cvw Sustainable Royalties's investor presentation, Jun 24, 2024

  1. Slide 1: Creating Value from Waste

    TSX-V: CVW OTCQX: CVWFF Creating Value from Waste A New Environmentally Sustainable Technology for Alberta and Canada I N V E S TO R P R E S E N TAT I O N | J U N E 2 0 2 4 Creating Value from Waste 1

  2. Slide 2: Disclaimer

    Disclaimer The information provided in this presentation is provided as of June 24, 2024 for informational purposes only, is not complete, and may not contain certain material information about CVW CleanTech Inc. (“CVW CleanTech" or the "Company"), including important disclosures and risk factors as

  3. Slide 3: Forward-looking Information

    Forward-looking Information Certain statements included in this presentation of CVW CleanTech constitute forward-looking statements and results from the Company's research, pilot programs; the belief that the Company's technology will provide information within the meaning of applicable Canadian sec

  4. Slide 4: The CVW CleanTech Story

    The CVW CleanTech Story TSX-V: CVW, OTCQX: CVWFF The oil and gas industry will be an A generic plant site could produce important source of energy between $136-341M in annual for decades to come as the world commodity revenue and $105-113M transitions to green energy in annual operator cost savings

  5. Slide 5: Corporate Profile

    CAPITAL STRUCTURE & SHAREHOLDER BREAKDOWN Corporate Profile June 24, 2024 Shares Outstanding 125.6M Strong alignment between Shareholders, Equity Awards 10.7M Board of Directors and Management Warrants 11.8M Fully Diluted Shares Outstanding 148.1M SHARE PRICE PERFORMANCE Share Price (As of June 24,

  6. Slide 6: Board of Directors

    Board of Directors Darren Morcombe Jennifer Kaufield Bruce Griffin CHAIRMAN DIRECTOR DIRECTOR • Founder of Springtide Capital Pty. Ltd., a private investment • Independent businesswoman with over 30 years of experience • Owner of Farview Solutions Limited, providing consulting and company specializi

  7. Slide 7: Management Team

    Management Team Akshay Dubey Joshua Grant Kevin Moran Mathew Ullattikulam CFO & CORPORATE SECRETARY EVP AND CHIEF TECHNOLOGY OFFICER VP, CORPORATE DEVELOPMENT CEO AND DIRECTOR • Extensive oil sands industry experience, • Extensive experience in the oil sands, • Joined CVW CleanTech in September 2022

  8. Slide 8: The World Continues To Need Hydrocarbons

    CVW CleanTech is committed to the transition The World The pathway to net zero targets to a sustainable world and utilizing emission will require time, innovation Continues and investment abatement technologies like the patented CVWTM technology is key to this global To Need transition Hydrocarbons

  9. Slide 9: The Opportunity: Creating Value from Oil Sands Tailings

    The Opportunity: Creating Value from Oil Sands Tailings THE WORLD’S 4TH LARGEST MINING FOOTPRINT OF SIGNIFICANT GDP OIL RESERVES LESS THAN 1% CONTRIBUTORS Contain over 170B barrels of oil, Oil sands cover an area greater than The oil sands industry represents 3% producing over 3M barrels/day 142,000

  10. Slide 10: Oil Sands: Mining vs In-Situ

    Oil Sands: Mining vs In-Situ RESERVES Oil sands is a mixture of bitumen, sand, clay and water. Because it does not flow like conventional crude oil which is a liquid, it must be extracted before it IN-SITU 80% can be processed Extraction methods include mining for near surface deposits and MINING st

  11. Slide 11: Mining Operations

    Mining Operations • Once the bitumen has been extracted, it is processed and upgraded into higher-value synthetic crude oil, diesel fuel and other products • Waste is processed before being disposed of in tailings ponds covering around 120 km2 of land and containing over 1.4 trillion liters of waste

  12. Slide 12: CVW CleanTech Process Overview

    CVW CleanTech Process Overview Creating Value from Waste 12

  13. Slide 13: How CVW CleanTech Can Add Value to Oil Sands

    How CVW CleanTech Can Add Value to Oil Sands Recover valuable Reduces Fugitive Reduces Operating and Enhanced Tailings commodities Emissions Environmental Costs Management • Recover additional bitumen • Recovery of solvent leads to • Carbon tax savings • Reduces tailings in ponds and solvent that wo

  14. Slide 14: CVW Technology: Over 15 Years of Development

    CVW Technology: Over 15 Years of Development Integrated demonstration pilot CVWTM Horizon CVWTM Horizon On-site minerals validation & and bitumen for CNRL, Suncor, FEED (Stantec) Syncrude and Imperial optimization (CNRL) recovery pilots Joint project at Syncrude engineering agreements with CNRL Inde

  15. Slide 15: CVW Value Proposition

    CVW Value  Bitumen: ~1.9 MMbbl  Solvent: ~328 Mbbl Potential to Proposition: COMMODITY RECOVERIES  Zircon Concentrate: 73 kT Reduce Canada’s Annual Metrics for a  Chloride Ilmenite: 170 kT Emissions by (TiO2 concentrate) Generic Site1 0.5%  CO2e Emissions Abatement: ~380+ kT  Heat Integration:

  16. Slide 16: CVW Development Approaches

    CVW CleanTech has a variety of development approaches CVW : Development Approaches based on the operator’s preference to optimize capital costs and operational benefits TM TM TM EcoBase1 EcoFlex1 EcoMax1 Hydrocarbon Revenue $136M $136M $136M CVW CleanTech is Minerals Revenue — Phase 1: - $205M explo

  17. Slide 17: EcoBase Illustrative Financing

    EcoBase Illustrative Financing CVWTM EcoBase should be an CVW CleanTech envisions a CVWTM EcoBase deployment under a joint venture structure with an excellent fit for the Strategic oil sands operator Innovation Fund, Canada Growth Fund, Emissions • Aim is to secure ~60% of the funding from project d

  18. Slide 18: Illustrative Project Execution

    CVW CleanTech envisions an EcoBase project deployment in Illustrative Project Execution collaboration with an oil sands operator to unfold over a 4 year timeframe to commercial production YEAR 1 YEAR 2 YEAR 3 YEAR 4 Execute MOU with Oil Sands Operator CVW CleanTech has received interest from multipl

  19. Slide 19: Indigenous Partnership

    Indigenous Partnership A CVW project would continue to build upon efforts towards Truth and Reconciliation through a meaningful partnership between industry and Indigenous communities over the long term CVW CleanTech has announced a framework agreement with Athabasca Chipewyan First Nation, Fort Chi

  20. Slide 20: CVW Technology is aligned with stakeholder priorities

    CVW Technology is  Canada 2030 Emissions Reduction Plan aligned with  GHG/methane emissions reduction  VOC and SOA reduction stakeholder Climate  Water conservation Leadership  Low carbon minerals priorities  Net Zero Pathway Alliance  Alberta Directive 85  Canada’s Mineral and Metals Plan 

  21. Slide 21: Track Record of Government Support

    Track Record of $3.5M Government Support MAR 2008 $16.4M DEC 2009 & 2020 $0.5M JUL 2012 $10.0M OCT 2017 & SEP 2020 Over $80M in grants awarded $40.0M MAR 2019 $5.0M JAN 2020 CVW CleanTech’s R&D has benefitted from government grants and expect a significant $5.0M amount of support for commercializati

  22. Slide 22: For Additional Information Please Contact

    For Additional Information Please Contact: Akshay Dubey CHIEF EXECUTIVE OFFICER Dr. Kevin Moran EXECUTIVE VICE PRESIDENT AND AND DIRECTOR CHIEF TECHNOLOGY OFFICER CVWcleantech.com Tel: 403-460-8135 Tel: 403-460-8135 Akshay.Dubey@CVWcleantech.com Kevin.Moran@CVWcleantech.com TSX Venture Exchange symb

  23. Slide 23: Appendix

    APPENDIX Creating Value from Waste 23

  24. Slide 24: GHG Avoided Emissions Benefit Quantified & Monetized

    A Rapid volatization of VOCs as hot tailings solvents are GHG Avoided Emissions Benefit B discharged into the atmosphere. VOCs volatized from oily films at pond surface (slicks), secondary organic aerosols precursors Quantified & Monetized C Anaerobic fermentation of solvents into methane (methanoge

  25. Slide 25: Proven Technology with Industry Leading Pilots

    Proven Technology with Industry Leading Pilots… Minerals Process Development Facility Integrated Pilot Plant (SRC – Regina) – 2004-2008 (CanmetENERGY) – 2010-2014 Focused on full scale mineral dressing test facility • SDTC Consortium with operator participation including processing tailings beach Ca

  26. Slide 26: Followed by Front End Engineering

    …Followed by Front End Engineering Greenfield Project Engineering 2010 CVW Horizon FEED Study 2018-2019 • Full scale generic greenfield installation • Front end engineering design with active engineered to AACE Class 4 level of participation by Canadian Natural Resources project definition; Study re

  27. Slide 27: Potential to Create a New Mineral Industry Leader

    APPENDIX Potential to Create a New Mineral Industry Leader Mineral sand CVW CleanTech has developed unique and Titanium and Life-style Strong production from environmentally friendly Zircon classified enhancing in correlation with Alberta has the technologies to recover critical as “strategic and em

  28. Slide 28: Titanium and Zircon: Used in Everyday Life

    APPENDIX Titanium and Zircon: Used in Everyday Life Titanium Zircon • Titanium dioxide (TiO2) is a bright white substance used primarily as • Zircon (zirconium silicate) has a unique set of physical properties which a vivid colorant in a wide array of common products make it suitable for use in a va

CVW CleanTech — Investor Presentation (June 2024) on 6ix