Catalyst Metals Limited · ASX:CYL
Catalyst Metals — Investor Presentation (June 2017)
37 slides from Catalyst Metals's investor presentation, June 2017
Slide 1: Corporate Presentation June 2017
Corporate Presentation June 2017 Bruce Kay Technical Director
Slide 2: Competent Person's Statement
Competent Persons Statement Competent Person’s Statement The information in this report that relates to exploration results is based on information compiled by Mr Bruce Kay, a Competent Person, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Kay is a non-executive director
Slide 3: Company Objectives
Company Objectives Develop assets with strong upside potential Enhance value via professional exploration Make a major gold discovery Become dominant in a world class gold province Gold production “Dominate the Region” Slide 3
Slide 4: Catalyst Capital Structure
Catalyst Capital Structure Capital Structure (ASX: CYL, CYLO) 58,129,785 fully paid ordinary shares 2,572,403 listed options @ 50c (30 June 2018) 1,100,000 unlisted options @ $1.00 Top 20 control approximately 70% of issued capital Cash in hand A$2.3 million (at 31 March 2017) Market Capit
Slide 5: Non-Executive Directors
Corporate Structure Non-Executive Directors Bruce Kay – Former Head of Worldwide Exploration for Normandy Mining and Newmont Stephen Boston – Principal of Perth based private investment group Robin Scrimgeour – Former banker in London, Tokyo, Hong Kong and Singapore Gary Schwab – Certified P
Slide 6: Victorian Gold
Victorian Gold Bendigo Australia’s 2nd largest goldfield (22 moz historic production) Whitelaw Fault controls gold mineralisation Mines Dept predicts 32 moz covered by Murray Basin Sediments Slide 6
Slide 7: Whitelaw Fault Interpretation (Seismic)
Whitelaw Fault Interpretation (Seismic) Slide 7
Slide 8: Bendigo: A World Class Gold Field
Bendigo: A World Class Gold Field Bendigo Goldfield Largest gold producer in the world from 1850 to 1890 22 million ounces at 15g/t Au Every vertical 100 metres contained 3 to 5 moz of gold Larger footprint than the Kalgoorlie Super Pit Slide 8
Slide 9: Finding the Next Bendigo
Finding the Next Bendigo Recognising this major geological opportunity Manage the entire Whitelaw Gold Corridor Using world-class exploration techniques Strong JV partner GEV (sub of Hancock Prospecting) High grade gold at Four Eagles and Tandarra Excellent infrastructure and gold plants
Slide 10: Control of Entire Whitelaw Gold Corridor
Control of Entire Whitelaw Gold Corridor Bendigo produced 22 million ounces of gold at 15g/t Au Gold corridor continues north of Bendigo Totally concealed by younger sediments Whitelaw Fault controls gold New EL Application “If there is a gold deposit north of Bendigo, Catalyst will be a m
Slide 11: Gold beneath the wheat fields
Gold beneath the wheat fields 10.0m @ 17.9g/t Au (ACT015) 19.0m @ 9.5g/t Au (FERC158) 6.0m @ 82.7g/t Au (FE328) 3.0m @ 154g/t Au (FE732) “Finding a large 6.0m @50.4g/t Au (FERC152) gold deposit beneath 3.0m @ 36.6g/t Au (FE415) the wheat fields” 3.0m @ 59.2g/t Au (FE633) 10.0m @ 6.4g/t Au (FERC147)
Slide 12: 'Lifting the Cover' 2011-2016
‘Lifting the Cover’ 2011-2016 Control of entire Whitelaw Gold Corridor Gravity and seismic reveal basement structures Pathfinder geochemistry defines gold trends Air core drilling at Four Eagles and Tandarra GEV support enables major drilling programme “Potential for both shallow open pit
Slide 13: Four Eagles Gold Project JV 2011
Four Eagles Gold Project JV 2011 Initial Catalyst Providence JV Signed January 2011 $2.1 m to earn 50% Totally concealed by cover 3 gold intersections > 1g/t Au Slide 13
Slide 14: 2017 Drilling Programme
2017 Drilling Programme Slide 14
Slide 15: Four Eagles Gold Project: Summary
Four Eagles Gold Project: Summary Three prospects defined with high grades – Hayanmi – high grade gold over 2kms – Boyd’s Dam – gold over 0.8 km – Boyd North – gold over 0.7 km Discovery Trend still untested 40 kilometres of Whitelaw trend still unexplored “Large areas of gold potential in sha
Slide 16: 2017 Drill Intersections
2017 Drill Intersections 4m @ 20.0g/t Au (BN) 5m @ 8.0g/t Au (BN) 5m @ 4.4g/t Au (BN) 6m @ 50.4g/t Au (BD) 19m @ 9.5g/t Au (BD) 10m @ 6.4g/t Au (BD) 4m @ 9.3g/t Au (BD) 13m @ 2.9g/t Au (BD) 10m @ 3.4g/t Au (BD) 1m @ 30.9g/t Au (BD) 6m @ 4.6g/t Au (H) Slide 16
Slide 17: Boyd's Trend
Boyd's Trend High grade gold confirmed at Boyd North; basement 20-40m deep High grades up to 247g/t Au at Boyd’s Dam Structure semi- continuous over 1.7 kilometres Slide 17
Slide 18: Boyd's Trend Long Projection
Boyd's Trend Long Projection Slide 18
Slide 19: Hayanmi Trend
Hayanmi Trend 2.9 kms long High Grade Gold 3m @ 13.4g/t Au 9m @ 5.7g/t Au 1m @ 103g/t Au 41m @ 3.9g/t Au 9m @ 7.9g/t Au 2m @ 25.7g/t Au 3m @ 14.7g/t Au 2m @ 19.2g/t Au 2m @ 13.9g/t Au Slide 19
Slide 20: Hayanmi Longitudinal Projection
Hayanmi Longitudinal Projection “Further gold intersections at northern end” Slide 20
Slide 21: TARGET: Deep Diamond Drilling
TARGET: “Deep” Diamond Drilling Slide 21
Slide 22: Hayanmi vs New Chum Bendigo
Hayanmi vs New Chum Bendigo Slide 22
Slide 23: Hayanmi Long Projection cf Fosterville
Hayanmi Long Projection cf Fosterville Slide 23
Slide 24: Lifting the Cover Gravity Survey
Lifting the Cover Gravity Survey First vertical derivative shows known gold channels Other potential gold zones targeted (yellow lines) Eight (8) targets defined for drilling Basement depth estimates of 40 to 80 metres Slide 24
Slide 25: TARGET: Macorna Bore
TARGET: Macorna Bore 20 km long strike length Anomalous As in shallow basement Weak Au in old WMC holes TARGET co-funding $312,000 Gravity survey and air core drilling Slide 25
Slide 26: Sebastian Project
Sebastian Project Along strike from Bendigo Goldfield Produced 186,000 ozs @ 10.4g/t Au 5km strike extension untested Shallow basement depth < 30 metres Possible structure to west Slide 26
Slide 27: Tandarra Gold Project - Summary
Tandarra Gold Project - Summary Large areas of potential in basement (< 60m) High grade gold at less than 20m depth 10 to 20km strike length of untested structure Open pit potential at Tomorrow Prospect Angled RC and/or Diamond Drilling required Slide 27
Slide 28: 2017 Tandarra Drilling Plan
2017 Tandarra Drilling Plan Follow-up Aircore reconnaissance drilling: – Tandarra North – Dingee Infill RC Blade drilling: – Tomorrow zone Large areas of strike length still untested Slide 28
Slide 29: Tomorrow Zone Aircore RC/DD
Tomorrow Zone Aircore RC/DD Slide 29
Slide 30: Tandarra 2017 RC Drilling (Completed)
Tandarra 2017 RC Drilling (Completed) Slide 30
Slide 31: Tomorrow Conceptual Pit
Tomorrow Conceptual Pit Slide 31
Slide 32: Four Eagles Fine and Coarse Gold
Four Eagles Fine and Coarse Gold 60% Fine Gold, Low Nugget Effect (16%) Good correlation between small and large sample assays High metallurgical recovery likely Slide 32
Slide 33: Four Eagles Gold Distribution
Four Eagles Gold Distribution Metallurgy shows 53% finer than 38 microns: 26% coarser than 150 microns Variography shows 16% nugget effect cf. 90% at Bendigo Good correlation between 25 gram and 2 kg assays Gravity and Cyanide should get good recoveries Slide 33
Slide 34: LeachWELL Correlation Graph
LeachWELL Correlation Graph Correlation 2kg LeachWELL vs 30gm Aqua Regia/AAS 40 ±2kg sample by LeachWELL (g/t Au) Hole Type Diamond hole 30 Aircore hole INSET ±2kg sample by LeachWELL (g/t Au) 5 ne 20 Li on si es gr Re 10 0 0 5 See 30 gram sample by AAS (g/t Au) Inset 10 20 30 40 50 30 gram sample b
Slide 35: Technical Programme 2017-18
Technical Programme 2017-18 Drilling at Four Eagles Gold Project (+ 20,000 metres Jan to May 17) Confirmation drilling of shallow mineralisation at Tomorrow Zone Pit modelling for Tandarra Reconnaissance drilling at Macorna Bore, Sebastian, Tandarra. Deep diamond drilling at Four Eagles Sl
Slide 36: Disclaimer & Forward Looking Statements
Disclaimer & Forward Looking Statements This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive o
Slide 37: Corporate Presentation June 2017
Corporate Presentation June 2017 Bruce Kay Technical Director