    Disclaimer All presentations and their appendices (hereinafter referred to as “Investor Presentations”) published on www.detnor.no have been prepared by Det norske oljeselskap ASA (“Det norske oljeselskap ” or the “Company”) exclusively for information purposes. The presentations have not been revie

  3. Slide 3: Highlights

    Highlights  Positive result from Grevling appraisal well (PL 038D)  Commerciality of Draupne confirmed (PL 001B)  Storklakken discovery appraised (PL 460) • Proved good quality oil  Dry wildcats on Storkinn, Optimus and Storkollen  Farm down agreements with Repsol and Faroe • From 100% to 60% i

  4. Slide 4: Production

    Production Production & realised oil prices Issues Boepd USD/bbl 2500 100  Production in the second quarter averaged 2,059 2000 80 bpd 1500 60  Realised oil price USD 79.9/bbl 1000 40  Production from Glitne and 500 20 Enoch was affected by maintenance 0 0 Q2 09 Q3 09 Q4 09 Q1 10 Q2 10  Maintena

  5. Slide 5: Agenda

    Agenda  Operations  Financials  Exploration  Development projects  Outlook & Summary  Appendix 5

  6. Slide 6: Financial position as of second quarter

    Financial position as of second quarter ”net cash” position as of Q2 Elements  Total cash and tax receivables for refund in 2010/11: 3 917 MNOK 1 409 1 820  Interest bearing debt: Short term debt and convertible bond expiring in December 2011: 2 226 MNOK 406 1 691  ”Net cash” position: 1 691, dow

  7. Slide 7: Profit & Loss Q2 2010

    Profit & Loss Q2 2010 MNOK Q2 2010 Q2 2009* Comment Operating revenues 88.7 66.8 Realised oil price USD 79.9 per barrel Exploration expenses 367.2 410.4 See next slide Change in inventories -1.6 0.7 Production cost 39.6 37.4 Payroll expenses 1.4 6.2 Increased depr. of abandonment ”asset” and Depreci

  8. Slide 8: Exploration Expenses Q2 2010

    Exploration Expenses Q2 2010 MNOK Q1 2010 Q1 2009 Comment Seismic, well data, field studies, etc. 1.7 25.3 Exploration expenses from license 87.2 124.3 G&G studies in partner licenses participation Expensed capitalized exploration wells 9.8 11.4 previous years Expensed dry wells this quarter 293.6 2

  9. Slide 9: Balance Sheet 30.06.2010

    Balance Sheet 30.06.2010 Assets (MNOK) *Q2 2010 31.12.09 Q2 2009 Comment Goodwill 669.7 697.9 864.3 Capitalized exploration exp. 1 697.4 893.5 493.3 Grevling, Storklakken and Draupne Other intangible assets 1 238.1 1 320.5 1 319.5 Property, plant and equipment 421.1 447.6 302.4 Depreciation producin

  10. Slide 10: Balance Sheet 30.06.2010 (cont.)

    Balance Sheet 30.06.2010 (cont.) Equity and Liabilities (MNOK) Q2 2010 31.12.09 Q2 2009* Comment Equity 3 571.4 3 850.5 3 621.4 Pension obligations 19.5 19.9 15.9 Deferred taxes 1 778.6 1 173.5 1 130.8 Abandonment provision 230.5 224.5 139.9 Deferred revenues 5.6 5.6 52.4 Total Provisions Derivative

  11. Slide 11: Agenda

    Agenda  Operations  Financials  Exploration  Development projects  Outlook & Summary  Appendix 11

  12. Slide 12: Promising results from Grevling appraisal

    Promising results from Grevling appraisal  Appraisal program completed by the drilling of 15/12-23 and -23A • Oil filling levels and reservoir properties established • New data acquired for potential production stimulation  Recoverable oil 38 – 94 MBO  Well results and potential development solut

  13. Slide 13: Grevling

    Grevling 15/12-21 15/12-21A 45/12-23 15/12-23A Ap k —_ ——y A fl 1 ST2 1 I > ODT 3097m shales i= ODT 3125m "~~ 5 andst 1 ; g _... ODT320Tm__ 1b H Triassic 163 shales 328%

  14. Slide 14: Exploration roadmap

    Exploration roadmap Dalsnuten PL Prospect net Drilling Mboe Gross % resources 392 Dalsnuten 10 Q3-10 600 Dovregubben 341 Stirby 30 Q3-10 150-340 102 David 10 Q3-10 16-52 414 Kalvklumpen 40 Q1-11 75-180 Krafla 468 Dovregubben 100* Q1-11 120-200 Kalvklumpen 450 Storebjørn 75* Q2-11 40-90 David Stirby

  15. Slide 15: PL 341 Stirby – spudded this week

    PL 341 Stirby – spudded this week  Large HTHP prospect • East Brae, Miller, Gudrun analogue Stirby  Recoverable gas/condensate  Stirby Upper 150 MBOE  High case Upper 800 MBOE East Brae  Stirby Deep 190 MBOE  Main risk  Reservoir quality  Stratigraphic seal  Water depth 120 meters  Det nor

  16. Slide 16: PL 392 Dalsnuten – east of Gro discovery

    PL 392 Dalsnuten – east of Gro discovery  Gas prospect to be drilled by Aker Barents Luva Asterix  Gross unrisked resources 600 mmboe  Norske Shell is operator PL392 Dalsnuten Gro-discovery  Det norske holds 10 percent Gro  Drilling to commence after Gro well  Water depth 1 350 to 1 500 meters

  17. Slide 17: PL 102C David – potential addition to Frøy

    PL 102C David – potential addition to Frøy  Significant oil prospect near Frøy  Potentially recoverable oil  Brent 16-26 MBOE  Statfjord 31-52 MBOE David  Main risk  Oil migration  Water depth 119 m, TD 3100 m  Spud September, Ocean Vanguard  Operator Total • Det norske holds 10 percent Wel

  18. Slide 18: PL 356 Ulvetanna farm-down to Repsol

    PL 356 Ulvetanna farm-down to Repsol  Planned drilled in Q1 2011  Gross unrisked resources  ~ 140 mill boe  40 percent farm out to Repsol  Portfolio and risk optimisation  Cost recovery terms 18

  19. Slide 19: PL 440S Clapton farm-down to Faroe Petroleum

    PL 440S Clapton farm-down to Faroe Petroleum  Farm-down to Faroe Petroleum from 30 percent to 10 percent interest  Det norske has offered to resign as operator  Faroe to carry Det norske’s 10 percent interest in the upcoming exploration well  Planned drilled in Q2 2011 19

  20. Slide 20: Agenda

    Agenda  Operations  Financials  Exploration  Development projects  Outlook & Summary  Appendix 20

  21. Slide 21: Frøy – Contractor negotiations ongoing

    Frøy – Contractor negotiations ongoing Preferred development solution:  A Sevan production unit  Wellhead platform  Production wells  Gas export pipeline to UK  No final agreements signed Current view on financing:  Lease of production unit  Contractor financing of wellhead platform in constr

  22. Slide 22: Draupne – progressing according to plan

    Draupne – progressing according to plan  Recoverable reserves of 110 million to 150 Mboe • About 95 percent inside Det norske operated licenses  Production test:  Good productivity – App. 12 000 bpd per well  Oil of good light quality  Draupne is appraised with three wells and one sidetrack  A

  23. Slide 23: Agenda

    Agenda  Operations  Financials  Development projects  Exploration  Outlook & Summary  Appendix 23

  24. Slide 24: Outlook & Summary

    Outlook & Summary  Exploration  Two high impacts well on the menu – Dalsnuten and Stirby  Field developments  Frøy – aiming for contractor financing in construction period  Draupne is progressing well  These two developments could bring Det norske’s production to 40 000 BOPD  Business develop

  25. Slide 25: DETNORSKE

    DETNORSKE NEST STORST PA NORSK SOKKEL

  26. Slide 26: The making of a discovery

    The making of a discovery TICKER – - DETNOR - Sr. Drilling Advisor Inge Myhre

  27. Slide 27: Risk Based Management

    Risk Based Management  Systematically identify risk (probability and consequences)  Reduce risk to an acceptable level  Control risk  Use the identified risk for decicion-making  Regular updates and reviews Two years 6 months to one year Application for Spud, follow Basis of discarges and Prepa

  28. Slide 28: To drill or not to drill

    To drill or not to drill  Acquire relevant subsurface data  Interpretation of well logs and seismic data  Match geological knowledge and geophysical understanding  Tematically identify risk  Probability and consequences  Set reservoir parameters  Volumes and risking  Set by the quality assur

  29. Slide 29: Det norske – well planning

    Det norske – well planning Weeks prior to spud 26 w 19 w 15 w 9w 4w 2w 0w RTD (Rec. To Discharge AFE & detailed Application to Preparing for Basis of Design Drilling concent Drilling Drill) application proceedures drill spud • Long lead items • Miljørisiko analyse • Boreprogram • Detaljprosedyrer fo

  30. Slide 30: Pre well planning

    Pre well planning  Safety issues – acquisition of site survey • Shallow gas pockets • Corals • Ice plough marks • Other obstacles to the well – boulders, shallow faults, etc.  Mapping of seabed and sub-seabed condition • Identify corals with side scan sonar • Verification with camera

  31. Slide 31: How to drill a well

    How to drill a well Rotary table [__0m TVD RKB] MSL Oe }8-%4" Wellhead datum Seabed 30" conductor shoe 20" casing shoe 1279 m MD RKB TOC 2796 m MD RKB 13-5/8" casing shoe 2996 m MD RKB] TOC 3836 m MD RKB] | eh err So | \ 2829 m TVD RKB| 23m TVD RKB 144 m TVD RKB| 2s m TWD RKB] 1279 m TVD RKB) [Top K

  32. Slide 32: Key objective - Pressure control

    Key objective - Pressure control Standard well HTHP well

  33. Slide 33: Example of Primary and secondary safety barriers

    Example of Primary and secondary safety barriers

  34. Slide 34: The discovery – Draupne test flare

    The discovery – Draupne test flare

Det norske oljeselskap — Q2 2010 Earnings Presentation on 6ix