Mcewen Inc. · NYSE:MUX

Mcewen — McEwen Mining — Shareholder Meeting (May 2013)

82 slides from Mcewen's shareholder meeting presentation, May 17, 2013

  1. Slide 1: McEwen Mining AGM 2013

    McE weno Mininc Pose MUX AGM 2013

  2. Slide 2: Agenda

    2 1. Formal Meeting 2. Financial Overview 3. Operation + Exploration Update 4. Gold Market Overview Agenda

  3. Slide 3: Formal Meeting

    3 Nils Engelstad Vice President, Corporate Affairs & Secretary FORMAL MEETING 3

  4. Slide 4: Financial Overview

    4 Perry Ing Chief Financial Officer FINANCIAL OVERVIEW

  5. Slide 5: Cautionary Statement

    5 Cautionary Statement This presentation contains certain forward-looking statements and information, including "forward- looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this p

  6. Slide 6: Statement of Operations

    6 Year ended Dec 31, 2012 Three months ended Mar 31, 2013 Income from MSC $20,835 ($237) Gold and silver sales from El Gallo 1 $5,966 $13,498 Production costs applicable to sales from El Gallo 1 ($3,861) ($10,593) Gross margin $22,940 $2,668 Mine operating and construction costs ($22,767) ($471) Exp

  7. Slide 7: San Jose Mine (100%)

    7 2012 2013 San Jose Mine (100%) Q1 Q2 Q3 Q4 Q1 Gold eq. oz sold 34 40 71 53 30 Avg realized price / gold eq. oz $1,807 $1,441 $1,699 $1,623 $1,519 Cash cost / gold eq. oz $688 $752 $764 $794 $966 All-in sustaining cost / gold eq. oz $1,236 $1,232 $1,122 $1,226 $1,520 Implied economic contribution (

  8. Slide 8: El Gallo 1

    8 2012 2013 Q1 Q2 Q3 Q4 Q1 Gold eq. oz produced - - - 6.7 6.8 Gold eq. oz sold - - - 3.2 8.2 Avg realized price / gold eq. oz - - - $1,725 $1,639 cash cost / gold eq. oz - - - - $742 All-in sustaining cost / gold eq. oz - - - - $1,483 Implied economic contribution - - - - $1,279 El Gallo 1 In thousa

  9. Slide 9: All-In Sustaining Cost / oz

    9 In thousands of US dollars, except per ounce amounts (1) Includes geology, mining, processing, royalty costs, refining and treatment charges, sales costs and export taxes See end notes “Non-GAAP disclosure” All-In Sustaining Cost / oz Dec 31, 2012 Mar 31, 2013 Total cash costs for El Gallo 1 Produ

  10. Slide 10: Balance Sheet

    10 Dec 31, 2012 Mar 31, 2013 Cash and gold and silver bullion $72,611 $46,812 IVA taxes receivable $9,150 $7,887 Inventories $7,262 $6,692 Mineral Properties $767,067 $766,675 Investment in MSC $273,948 $273,711 Total Assets $1,150,937 $1,124,963 Deferred Tax Liability $229,522 $223,059 Total Liabil

  11. Slide 11: Liquid Assets

    11 Dec 31, 2012 Mar 31, 2013 May 15, 2013 Cash $70,921 $45,122 $37,499 Gold and silver bullion (1) $2,063 $1,983 $1,708 Inventories – Gold and silver doré (1) $5,962 $3,555 $6,990 Total $78,946 $50,660 $46,197 In thousands of US dollars (1) Based on London PM close as of December 31, 2012, March 31,

  12. Slide 12: Share Capital

    12 Jan 24, 2012 (Merged with Minera Andes) Dec 31, 2012 Mar 31, 2013 Common & Exch. Shares* 267,084 296,025 297,086 Options 6,000 4,581 4,522 Fully Diluted Shares 273,084 300,606 301,608 In thousands Share Capital

  13. Slide 13: December 2012 Rights Offering

    13 Raised $61 Million Fully Subscribed Low Cost Shareholder Friendly December 2012 Rights Offering

  14. Slide 14: Operational + Exploration Update

    14 IAN BALL Senior Vice President OPERATIONAL + EXPLORATION UPDATE

  15. Slide 15: Key Assets

    15 Key Assets Gold Bar Gold Permitting El Gallo 2 Silver Permitting Los Azules Copper Copper Exploration San José Mine (49%) Silver / Gold Production El Gallo 1 Mine Gold Production

  16. Slide 16: 2012 AGM Growth Forecast

    16 *Gold equivalent 2012 AGM Growth Forecast What We Told You Last Year 105,000 oz Achieved 290,000 oz 130,000 oz On Track 180,000 oz San José El Gallo 1 El Gallo 2 Gold Bar 2012A 2013E 2014E 2015E

  17. Slide 17: Gold Price 2012 - Present

    17 Gold Price 2012 - Present *As of May 15, 2013 May Gold 2012 $1,650 / oz May Gold 2013 $1,370 / oz $280 / oz Decline

  18. Slide 18: Mining IPOs dry up in Q1

    Mining IPOs dry up in Ql NP CANADIAN Press | 19/04/01 11:37 AM ET More from Canadian Press Junior miners fret over lack of investment Northern Ontario mineral exploration has dropped dramatically, observers say cpcnews | Posted: Mar 5, 2013 11:49 AM ET Financing for junior mining feels the pinch |TH

  19. Slide 19: If there's a way to do it better... find it

    19 “IF THERE’S A WAY TO DO IT BETTER... FIND IT.” THOMAS A. EDISON

  20. Slide 20: El Gallo Mine: Mexico

    20 El Gallo 1 Mine: Mexico

  21. Slide 21: El Gallo 1: Expansion Drivers

    21 1. Exploration Success 2. Small Capital Requirements El Gallo 1: Expansion Drivers Announced This Morning

  22. Slide 22: El Gallo 1 Mine

    22 Lupita Pit Sagrado Pit New Central Discovery Samanegio Pit Heap Leach Pad El Gallo 1 Mine

  23. Slide 23: El Gallo 1: Central Zone - Growth

    23 El Gallo 1: Central Zone - Growth

  24. Slide 24: El Gallo 1: Central Zone - Growth

    24 El Gallo 1: Central Zone - Growth

  25. Slide 25: $5 Million Capital to Expand El Gallo 1

    25 $5 Million Internally Financed Capital to Expand El Gallo 1 3,000 4,500 ore tonnes per day

  26. Slide 26: El Gallo Expansion $5 Million

    26 Heap Leach Pad Expansion $2.5 M El Gallo 1 Expansion $5 Million Crushers $0.5 M Process Plant $2.0 M

  27. Slide 27: El Gallo Mine Increasing Gold Production

    27 El Gallo 1 Mine Increasing Gold Production 27,300 oz 60,000 oz 37,500 oz 75,000 oz El Gallo 1 Prior Est. El Gallo 1 Expansion Est. 2013E 2014E 2015E 2016E

  28. Slide 28: El Gallo 2: Mexico

    = aa << lc EI Gallo 2: Mexico SRR faa) een? % % 4 J z a a |

  29. Slide 29: What Method is Best?

    29 New Mill Heap Leach El Gallo 2 What Method is Best? Today $ Defer

  30. Slide 30: El Gallo 2: Heap Leach Processing

    30 El Gallo 2: Heap Leach Processing 1. El Gallo 1 & 2: Only 5 km apart How is this Possible? 2. El Gallo 2: Early Heap Leach Results Positive

  31. Slide 31: El Gallo 1 & 2: Close Proximity

    31 El Gallo 1 Mine 5 km Road El Gallo 2 El Gallo 1 & 2: Close Proximity

  32. Slide 32: El Gallo 2: Heap Leach Recovery

    32 El Gallo 2: Heap Leach Recovery 45 – 65% Silver Recoveries Early Test Results

  33. Slide 33: El Gallo 2: Next Steps

    33 1. Establish Silver Recovery 2. Confirm Costs 3. Decide Process Method El Gallo 2: Next Steps

  34. Slide 34: Los Azules: Argentina

    34 Los Azules: Argentina

  35. Slide 35: Possible Financing Sources

    35 Sale / JV Los Azules Lease / Debt / Equity Possible Financing Sources

  36. Slide 36: Los Azules Resource Growth

    36 Los Azules Resource Growth 2.2 4.6 5.4 11.2 10.3 10.8 14.3 Billion Pounds Copper Indicated Inferred 2008 2010 2012 2013

  37. Slide 37: Comparing Market Caps

    37 Lumina Copper Los Azules 2/3 Size = *As of May 15, 2013 Comparing Market Caps $315 Million $200 Million

  38. Slide 38: Los Azules: Possible Source of Funding

    38 Los Azules: Possible Source of Funding Asset Sale or JV For Sale

  39. Slide 39: Los Azules vs Lumina Copper

    39 Los Azules vs Lumina Copper 50% Resource Growth Since PEA Los Azules(1) (McEwen) Taca Taca(2) (Lumina) Production 375,000 535,000 Capex $2.8 Billion $3.0 Billion Cash Cost Net by-product $0.96 $1.11 Copper Grade 0.50% 0.45% Strip Ratio 1.3:1 1.6:1 Mine Life 26 Yrs 28 Yrs 1) June 2010. 2) April 20

  40. Slide 40: Los Azules Updated PEA Due Q3

    40 Los Azules Updated PEA Due Q3

  41. Slide 41: San José: Argentina

    bi aly a De oe 2 La San José: Argen

  42. Slide 42: San José Mine: Forecast 2013

    42 San José Mine: Forecast 2013 *Silver : Gold ratio (52:1) Gold & Silver Production, Gold Eq. 102,700 oz Annual 12 Yr Mine Life $750 / oz Cash Cost $1,300 / oz Total Cost 42 High-Grade Gold + Silver Argentina

  43. Slide 43: San José Mine: The Good and The Bad

    43 The Good The Bad Resource Size All Time High 20 – 25% Inflation Grade vs 2011 Unions Production 5 Years Changing Regulations San José Mine

  44. Slide 44: San José: High Grade

    44 San José: High Grade *Source: company reports Comparison of High-Grade Deposits 0 4 8 12 16 20 0 2 4 6 8 10 12 14 HOC / McEwen San José Size (Million Au Eq. oz) Grade (Au gpt Eq.) Rubicon Phoenix Pretium Valley of Kings Goldcorp Red Lake Goldcorp Elenore Goldcorp Cerro Negro Yamana El Penon Mine

  45. Slide 45: Gold Bar: Nevada

    45 Gold Bar: Nevada

  46. Slide 46: Gold Bar – Cortez Trend, Nevada

    46 Gold Bar – Cortez Trend, Nevada Next to World’s Largest Gold Mine

  47. Slide 47: Gold Bar Production Forecast

    47 50,000 oz Au Annual $700/oz Cash Cost $850/oz Au Eq Total Cost 2015 Production Starts Gold Bar Production Forecast Construction Forecasted to Begin 2014 Nevada 8 Yr Mine Life Capex $55 M

  48. Slide 48: Gold Bar: Previously Mined Open Pit

    Waste Dump Open Pit Gold Bar: Previously Mined 48 Open Pit Haul Road

  49. Slide 49: Gold Bar: Previously Mined Open Pit

    Gold Bar: Previously Mined Open Pit 49 Haul Road Waste Dump

  50. Slide 50: El Gallo Mill: Growth Scenarios by 2016

    50 El Gallo 2 Mill 2012 AGM Est. 290,000 oz *Gold equivalent production (52:1 silver/gold ratio) Growth Scenarios by 2016 El Gallo 2 Deferred 225,000 oz El Gallo 2 Heap Leach 285,000 oz

  51. Slide 51: Gold Market Overview

    51 ROB McEWEN Chief Owner MUX / GOLD MARKET OVERVIEW

  52. Slide 52: Our Goal: Qualify For S&P

    52 Qualify For S&P 500 Our Goal

  53. Slide 53: Forecast Annual Production Growth

    53 *Gold equivalent Forecast Annual Production Growth 2015 Est. Cash Cost $750 / oz 2015 Est. Total Sustaining Cost $1,000 / oz 105,000 oz 290,000 oz 130,000 oz 180,000 oz San José El Gallo 1 El Gallo 2 Gold Bar 2012A 2013E 2014E 2015E ?

  54. Slide 54: El Gallo 2: Capex

    54 El Gallo 2: Capex Contingency, $18.8 Owners Cost, $8.8 Final Engineering, $8.5 Construction Management, $12.0 Spares, $2.0 Construction Labour, $22.0 Plant Equipment, $57.0 Cement/Steel, $37.0 Construction Equipment, $10.0 Other, $5.0 $180 Million

  55. Slide 55: Assumptions: Los Azules / El Gallo 2

    55 1. Increase Its Value Through Exploration 2. Sale would cover El Gallo Capex 3. Sale Would Allow Non-Dilutive Build Assumptions: Los Azules / El Gallo 2

  56. Slide 56: Subsequent Events

    56 1. Increased Copper Resource Significantly 2. Mega Project: Less Enthusiasm 3. Argentina: Less Attractive 4. Silver/Gold Prices Fall – Adverse Impact IRR 5. Cost of Capital High Subsequent Events

  57. Slide 57: Adversity Mother of Innovation

    57 Adversity Mother of Innovation

  58. Slide 58: Expand with Less Capex

    58 Expand with Less Capex

  59. Slide 59: Expand El Gallo Internally Funded

    59 Expand El Gallo 1 Internally Funded

  60. Slide 60: Issue at Hand: Financing El Gallo

    60 Issue at Hand Financing El Gallo 2

  61. Slide 61: Development Economics – El Gallo

    61 Development Economics – El Gallo 2 Silver Price / oz NPV 5% (Millions) Payback After Tax IRR $30.00 $212 2.0 39% $27.50 $165 2.2 33% $25.00 $118 2.6 26% $22.50 $71 3.0 18% $20.00 $23 4.1 10%

  62. Slide 62: MUX Cost of Capital

    ] MUX Cost of Capital Percent 45 Gere Now) All Equity 5 . All Debt 40% Debt / Equity $2 $3 $4 Share Price

  63. Slide 63: Cash Scenarios

    63 -200 -150 -100 -50 0 50 100 Working Capital ($ Millions) *Gold $1,350 Silver $23.00 Alternatives Stop all work El Gallo 2 on hold Finish Mill Engineering Stop Gold Bar work Projects Maintaining Timeline Q2-13 Q4-14 Q2-14 Q4-13 Cash Scenarios

  64. Slide 64: Mill, Heap Leach, Defer El Gallo

    64 Mill Heap Leach Defer El Gallo 2

  65. Slide 65: El Gallo Growth Scenarios by 2016

    65 El Gallo 2 Mill 2012 AGM Est. 290,000 oz *Gold equivalent production (52:1 silver/gold ratio) Growth Scenarios by 2016 El Gallo 2 Deferred 225,000 oz El Gallo 2 Heap Leach 285,000 oz

  66. Slide 66: It's Money

    66 It’s Money

  67. Slide 67: Big, Persistent, Growing Concern

    67 Big, Persistent, Growing Concern US National Debt EU Debt $16.8 Trillion $11.3 Trillion

  68. Slide 68: Massive Monetary Easing

    68 MASSIVE MONETARY EASING

  69. Slide 69: Non-Existent Interest Rates

    69 Non-Existent Interest Rates

  70. Slide 70: Troubling Developments: Alert

    70 Cyprus – Currency Controls ABN Amro – Defaulting on Gold Argentina – Currency Controls Troubling Developments: Alert

  71. Slide 71: Ignore History at Your Risk

    71 Ignore History at Your Risk *As of May 15, 2013

  72. Slide 72: Central Banks Buying Gold

    72 Strong Economies Central Banks Buying Gold

  73. Slide 73: SocGen – Gold: Down or Up?

    73 SocGen – Gold: Down or Up? April 2, 2013 $1,375 Foreign Exchange Team April 25, 2013 $10,000 Global Strategist

  74. Slide 74: Gold Shares Very Attractive

    74 Gold Shares Very Attractive *As of May 15, 2013 Huge Divergence

  75. Slide 75: White House Effect

    75 White House Effect -40% 0% 40% 80% *As of May 15, 2013 84 88 92 96 00 04 08 12 Presidential Election Year Post Election Year Bre-X /85 /89 /93 /97 /01 /13 /09 /05 7/8 8/8 Performance of XAU

  76. Slide 76: Contact Information

    76 Contact Information Jenya Meshcheryakova Investor Relations Tel: 1.866.441.0690 x.410 Email: info@mcewenmining.com facebook.com/mcewenrob twitter.com/mcewenmining store.mcewenmining.com

  77. Slide 77: End Notes

    77 End Notes The Company has included non-GAAP performance measures, cash costs, and all-in sustaining cost per gold ounce, throughout this document on a historic and estimated forward looking basis. In the mining industry, these are common performance measures but do not have any standardized meani

  78. Slide 78: End Notes

    78 End Notes Guidance to US Investors: McEwen Mining prepares its resource estimates in accordance with standards of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in Canadian National Instrument 43-101 (NI 43-101). These standards are different from the standards generally p

  79. Slide 79: Resource Table: San José and El Gallo

    79 San José Mine (49%) (1) Tonnes (MM*) (100%) Ag Grade (g/t) Au Grade (g/t) Ag (MMoz*) (100%) Au (MMoz*) (100%) Proven 0.83 470 6.73 12.54 0.18 Probable 0.94 471 6.19 14.26 0.19 Measured (inclusive of P+P) 1.3 559 8.2 23.17 0.34 Indicated (inclusive of P+P) 3.1 453 6.56 45.12 0.65 Inferred 2.1 476

  80. Slide 80: Resource Table: El Gallo Gold, Gold Bar, Limo

    80 El Gallo Complex Gold(2) Tonnes (MM*) (100%) Au Grade (g/t) Au (MMoz*) (100%) Measured 28.3 0.46 0.41 Indicated 6.1 0.78 0.15 Inferred 27.6 0.31 0.27 Gold Bar(3) Tonnes (MM*) (100%) Ag Grade (g/t) Au Grade (g/t) Ag (MMoz*) (100%) Au (MMoz*) (100%) Measured 0.7 1.19 0.03 Indicated 18.8 0.94 0.57 R

  81. Slide 81: Los Azules and Limo Resources

    81 Los Azules(6) Tonnes (MM) Cu Grade (%) Au Grade (g/t) Ag Grade (g/t) Cu (B lbs) Indicated 389 0.63 0.07 1.8 5.4 Inferred 1,397 0.46 0.06 1.9 14.3 Limo(5) Tonnes (MM*) (100%) Ag Grade (g/t) Au Grade (g/t) Ag (MMoz*) (100%) Au (MMoz*) (100%) Measured 5.9 0.89 0.17 Indicated 3.7 0.61 0.07 The cumula

  82. Slide 82: Technical Report Sources

    82 3) Gold Bar resources were derived from the report titled “NI 43-101 Technical Report on Resources and Reserves Gold Bar Project, Eureka County, Nevada” dated February 24, 2012 with an effective date of November 28, 2011, prepared by J. Pennington, C.P.G., MSc., Frank Daviess, MAusIMM, Registered

McEwen Mining — Shareholder Meeting (May 2013) on 6ix