Avista Corporation · NYSE:AVA

Avista — Technical Presentation (April 2024)

44 slides from Avista's technical presentation, Apr 24, 2024

  1. Slide 1: 2025 Natural Gas IRP Technical Advisory Committee Meeting No. 2 Agenda

    2025 Natural Gas Integrated Resource Plan Technical Advisory Committee Meeting No. 2 Agenda Wednesday, April 24, 2024 Virtual Meeting Topic Time (PTZ) Staff Agenda/Meeting Guidelines 10:30 Tom Pardee Action Items 10:40 Tom Pardee Modeling/Assumptions Overview 11:00 Tom Pardee CROME High Level Overvi

  2. Slide 2: 2023 Gas IRP Action Items

    AIVISTA 2023 Gas IRP Action Items

  3. Slide 3: Summary of Acknowledgement

    Summary of Acknowledgement • Idaho – Acknowledged (November 1, 2023) • Oregon – Pending short term acknowledgment • Washington – No word on acknowledgment 2

  4. Slide 4: Avista – 2023 Gas IRP Actions

    Avista – 2023 Gas IRP Actions 1. ETO identified 546,000 therms in the 2023 IRP verses 427,000 therms of planned savings in the 2023 ETO Budget and Action Plan. Avista will work with ETO to meet IRP gross savings target of 568,000 therms in 2024. 2. New program offered by ETO for interruptible custom

  5. Slide 5: IPUC - Recommendations

    IPUC - Recommendations 2025 IRP No. Recommendation 1 Staff recommends the Company's 2023 Natural Gas IRP be acknowledged and accepted for filing contingent on the Company submitting a compliance filing with an updated DSM Avoided Cost table that does not include a National Carbon Tax starting in 203

  6. Slide 6: OPUC - Recommendations

    OPUC - Recommendations 2025 IRP No. Recommendation 1 Do not acknowledge 8.64 million therms of RNG in 2023. Removed For the IRP Update the Company should update the load forecast with a downscaling methodology using 2 Multivariate Adaptive Constructed Analogs as employed by Oregon State University’s

  7. Slide 7: OPUC Staff - Expectations

    OPUC Staff - Expectations 2025 IRP No. Expectation At a TAC meeting for the next IRP, Avista should provide an estimate of the capacity in MW of electrolyzers, renewable generation, and methanation equipment needed in each year to include synthetic methane in the Oregon PRS. The Company should also

  8. Slide 8: OPUC Staff - Expectations

    OPUC Staff - Expectations No. Expectation 2025 IRP The Company should conduct a review, comparing projections from this IRP to actuals of their resource assumptions, quantitative 14 least-cost/least risk predictions, and forecasts. 15 Avista should work with the TAC to develop electrification modeli

  9. Slide 9: WUTC Staff - Recommendations

    WUTC Staff - Recommendations Topic No. Recommendations Review the Cascade Natural Gas general rate case final order with the TAC and the EAG together, consider how the core tenets of energy justice 1 apply to Avista’s planning processes, and prepare to implement the order’s equity framework. Dedicat

  10. Slide 10: WUTC Staff - Recommendations

    WUTC Staff - Recommendations Topic No. Recommendations 16 Continue to refine the methods and approach of leveraging potential assessments for achieving equitable outcomes. 17 Segment customers with different levels of gas to electric conversion costs rather than modifying costs only by scenario. Dem

  11. Slide 11: Secondary Actions and Attachments

    Secondary Actions and Attachments 10

  12. Slide 12: OPUC Staff - Requests

    OPUC Staff - Requests Request 1: Future IRPs should include a clearer explanation of the PRS, and a more transparent presentation of the assumptions and processes used in creating the PRS, including examples noted by Staff. Request 2: Staff requests Avista engage the TAC in discussion of the value o

  13. Slide 13: OPUC Staff – Attachment A

    OPUC Staff – Attachment A • Ratepayer Incentive Value The Ratepayer Incentive Value includes both the cost of the ratepayer to convert and the benefit the ratepayer’s decision to electrify provides to gas system operations and downstream costs. Staff expects the feasibility of conversion to be const

  14. Slide 14: OPUC Staff – Attachment C

    OPUC Staff – Attachment C The Company should update its DSP practices and IRP processes to include: 1. Future distribution system planning should identify the rationale for projects as either Safety/General System Reliability, or Customer Growth/Reliability Related to Growth. a. When proposing growt

  15. Slide 15: Modeling and Assumptions Overview

    Modeling and Assumptions Overview 1

  16. Slide 16: Model / Process

    Expected Load Model Least Cost Resource Solve Model Risk Model (differing load future scenarios) Scenario Assumptions End Use Risk Efficiencies / Objectives Stock Rollover and Input Climate Program/Policy Constraints Model / Process Current Demand Side Weather Demand Side Resource Resources Options

  17. Slide 17: Load Assumptions

    Load Assumptions • PRS load input will rely on current known state policy, codes and requirements • WA SBCC will be included in load forecast baseline • Line extension program expirations will be included in forecast baseline - 2027 end date in Oregon - 2024 end date in Washington • Hybrid heating b

  18. Slide 18: Cost Assumptions

    Cost Assumptions All quantifiable current and estimated costs: • Interstate pipeline transportation • Storage • Expected cost of natural gas by supply basin (AECO, Malin, Rockies, Stanfield, Station 2, Sumas) • Alternative fuels (RNG, Methanation, Hydrogen – all forms, carbon capture) • Compliance m

  19. Slide 19: Output

    Output • An average rate, with power costs, will be provided by scenario • Emissions by scenario • A levelized cost by scenario • A net present value revenue requirement (NPVRR) • Risks • Energy Burden 5

  20. Slide 20: Scenarios

    Scenarios Scenarios – Deterministic & Description Monte Carlo PRS Our expected case based on assumptions and costs with a least risk and least cost resource selection. This scenario includes all known policies and orders from Idaho, Oregon and Washington. Assumes 4.5 RCP weather. High Growth on Gas

  21. Slide 21: Scenarios – Deterministic Only

    Scenarios – Deterministic Only Scenarios – Description Deterministic Only Low Alternative Fuel A scenario to measure resource selection with a lower-than-expected set of Alternative Costs Fuel costs by source High Alternative Fuel A scenario to measure resource selection with a higher-than-expected

  22. Slide 22: Scenarios – Deterministic Only

    Scenarios – Deterministic Only Scenarios – Description Deterministic Only RCP 8.5 Weather Weather will use the RCP 8.5 future RCP 6.0 Weather Weather will use the RCP 6.0 future as the average between RCP 8.5 and 4.5 Resiliency Supply will be selected to create a resilient system No New Natural Gas

  23. Slide 23: Modeling Risk

    Modeling Risk • 18 total scenarios • Deterministically solve a set of resources to meet variability in the scenarios for a stochastic set of futures • Run 500 monte carlo futures for the 4 distinct load scenarios to determine risk • Efficient Frontier may be used to select least cost and least risk

  24. Slide 24: Avista CROME High Level Overview

    Avista CROME High Level Overview Comprehensive Resource Optimization Model in Excel Michael Brutocao Natural Gas Analyst

  25. Slide 25: Timeline: IRP Modeling Software

    Timeline: IRP Modeling Software Prior to 2023 2023 IRP 2025 IRP SENDOUT® PLEXOS® Avista CROME 2

  26. Slide 26: High Level Overview

    High Level Overview Select scenario- specific data INPUTS AND Avista CROME REPORTS ASSUMPTIONS • CROME solution data • Inputs and assumptions • Inputs, assumptions, updates templates for are stored here. and constraints are summary statistics and brought together. graphics. • Data is prepared for CR

  27. Slide 27: Solving for Residential, Commercial, and Industrial Loads

    Solving for Residential, Commercial, and Industrial Loads Storage Gross Energy Storage Demand Withdrawal Third Party Storage DSM Natural Gas Compliance Injection Mechanisms Program Net Energy Alternative Compliance Demand Fuels Mechanisms Demand Pipeline Electrification Response Network Emission Net

  28. Slide 28: Solving for Transport Customer Loads

    Solving for Transport Customer Loads Storage Gross Energy Storage Demand Withdrawal Natural Gas Third Party Storage DSM (From Service Compliance Injection Supplier) Mechanisms Program Net Energy Alternative Compliance Demand Fuels Mechanisms Demand Pipeline Electrification Response Network Emission

  29. Slide 29: NET LOAD

    NET LOAD 6

  30. Slide 30: Gross Demand

    Gross Demand Considerations: Number of customers by end-use Gross Energy Base use per customer Demand Heating use per customer DSM Weather Net Energy Demand Optimization Decision: N/A Demand Electrification Response Points: All modeled areas and customer classes Net Load Frequency: Daily 7

  31. Slide 31: Demand Side Management

    Demand Side Management Considerations: Avoided cost by area and customer Gross Energy class Demand Number of customers by end-use DSM CPA from AEG/ETO Net Energy Demand Inputs: UCT (ID), TRC (WA, OR) Demand Electrification Points: All modeled areas and customer Response classes Net Load Frequency: D

  32. Slide 32: Demand Response

    Demand Response Considerations: Cost Gross Energy Demand Available “supply” by program, area and customer class DSM Optimization Decision: Quantity “purchased” Net Energy Demand Decision Points: All modeled areas and customer Demand Response Electrification classes Net Load Decision Frequency: Daily

  33. Slide 33: Electrification

    Electrification Considerations: Cost Gross Energy Demand Available “supply”* DSM Optimization Decision: Quantity “purchased” Net Energy Demand Decision Points: Residential and commercial classes (OR, WA) Demand Electrification Response Decision Frequency: Annual Net Load * This is constraining the o

  34. Slide 34: SERVED LOAD

    SERVED LOAD 11

  35. Slide 35: Natural Gas

    Storage Natural Gas Considerations: Cost Storage Withdrawal Optimization Decision: Quantity purchased Storage Natural Gas Injection Decision Points: AECO Stanfield Alternative Fuels Malin Station 2 Pipeline Rockies Sumas Network Decision Frequency: Daily Served Load Unserved Load 12

  36. Slide 36: Alternative Fuels

    Storage Alternative Fuels Considerations: Cost Storage Withdrawal Available supply * Max blend percent *1 Storage Natural Gas Injection Optimization Decision: Quantity purchased Alternative Fuels Decision Points: Hydrogen (7 forms) Pipeline Network RNG (5 forms) Synthetic methane (3 forms) Served L

  37. Slide 37: Storage

    Storage Storage Considerations: Min/max volume * Storage Withdrawal Max daily injection/withdrawal * Capital & overhead Storage Natural Gas Carrying rate Injection Alternative Fuels Optimization Decision: Quantity injected/withdrawn Pipeline Network Decision Points: Jackson Prairie Served Load Decis

  38. Slide 38: Pipeline Network

    Storage Pipeline Network Considerations: Flow capacity * Storage Withdrawal Reservation rate Variable rate (flow charge) Storage Natural Gas Fuel loss Injection Alternative Fuels Optimization Decision: Segment flow Pipeline Network Decision Points: All pipeline segments in network Served Load Decisi

  39. Slide 39: Unserved Load

    Storage Unserved Load Considerations: Cost Storage Withdrawal Optimization Decision: Quantity unserved Storage Natural Gas Injection Decision Points: All modeled areas and customer Alternative Fuels classes Pipeline Network Decision Frequency: Daily Served Load Unserved Load 16

  40. Slide 40: EMISSIONS

    EMISSIONS 17

  41. Slide 41: Natural Gas & Alternative Fuels

    Natural Gas & Alternative Fuels Natural Gas Third Party Considerations: Carbon emissions (+Upstream Compliance Emissions) Mechanisms Alternative Program Optimization Decision: Quantity purchased Compliance Fuels Mechanisms Decision Points: Same as in served Emission Decision Frequency: Annual, daily

  42. Slide 42: Third Party Compliance Mechanisms

    Third Party Compliance Mechanisms Third Party Considerations: Cost Natural Gas Compliance Mechanisms Available supply * Program Alternative Compliance Fuels Mechanisms Optimization Decision: Quantity purchased Decision Points: Renewable thermal credits (3 forms) Emission Carbon capture (4 forms) Con

  43. Slide 43: Program Compliance Mechanisms

    Program Compliance Mechanisms Third Party Considerations: Cost Natural Gas Compliance Mechanisms Available supply * Program Alternative Compliance Fuels Mechanisms Optimization Decision: Quantity purchased Decision Points: Allowances (CCA) Emission Offsets (CCA) Constraints CCIs (prior CPP) Non- Com

  44. Slide 44: Non-Compliance

    Non-Compliance Third Party Considerations: Cost Natural Gas Compliance Mechanisms Alternative Program Optimization Decision: Quantity Compliance Fuels Mechanisms Decision Points: Climate Commitment Act Prior Climate Protection Program Emission Constraints Decision Frequency: Compliance period, annua

Avista — Technical Presentation (April 2024) on 6ix