Slide 1: Eastman PGE Investor Presentation
For personal use only Eastman PGE Investor Presentation ASX:PKO Critical Elements for a Greener Planet August 2023
Slide 2: Disclaimer Notice and Competent Persons Statement
Disclaimer Notice and Competent Persons Statement This document may contain forward-looking statements. These forward-looking statements are made as of the date The information in this presentation that relates to Exploration Results and Historical Exploration is based on of this document and Peako
Slide 3: High-Grade PGEs in the Kimberley
HIGH-GRADE PGEs IN THE KIMBERLEY For personal use only PGE endowment Priority Brumby Scope for multiple confirmed at all targets Prospect with near-term PGE resources resource potential 16.5km long Palladium-rich Highly successful 2022 drill 2023 drill campaign Eastman PGE Intrusion with campaign co
Slide 4: Corporate Overview
Corporate Overview $0.007 470m $601k $0 $3.3m 48.5m For personal use only Share price Shares Cash Market Capitalisation Debt Listed Options1 (30 August 23) on Issue (30 Jun 23) (Undiluted) LEADERSHIP TEAM SHAREHOLDERS GEOFF RAE 31% ALBERS CLARK Board Non-Executive Executive Chairman Director 18% Oth
Slide 5: PGEs: Essential for the Green Energy Transition
PGEs: Essential for the Green Energy Transition PLATINUM GROUP ELEMENTS § Platinum (Pt) For personal use only § Ruthenium (Ru) The six platinum group elements § Palladium (Pd) § Osmium (Os) (PGEs) occur together in nature and have similar physical, chemical and § Rhodium (Rh) § Iridium (Ir) structur
Slide 6: PGE Supply: Russia and South Africa Dominate
PGE Supply: Russia and South Africa Dominate For personal use only Platinum Palladium ASX:PKO Source: Johnson Matthey PGM Market Report, May 2021 6
Slide 7: The Kimberley Critical Minerals Province
The Kimberley Critical Minerals Province For personal use only Potential New PGE Resource Port of Wyndham Eastman PGE Project Kununurra • 2022 reconnaissance drilling defines PGE endowment across 16.5km strike of the intrusive complex High-grade PGEs at Brumby • 2023 step-out & infill drilling - res
Slide 8: Scope for Substantial PGE Resource
Scope for Substantial PGE Resource Eastman PGE Project § 2022 reconnaissance drilling identifies extensive PGE-endowment across 15m @ 1.25 g/t PdEq For personal use only 16.5km length of Eastman layered Mafic-Ultramafic Intrusive Complex § 6,200m RC drilling program confirms PGE endowment at every p
Slide 9: What do we know about PGEs at Eastman?
What do we know about PGEs at Eastman? PALLADIUM + BASE METAL PALLADIUM EQUIVALENT (PdEq) For personal use only RICH PGEs CREDITS Combined indicative metal value equated to equivalent Palladium grade5 Eastman PGE 3E value Additional value from (aggregate of Pd, Pt and credits for associated Au) incl
Slide 10: Brumby Prospect
Brumby Prospect 7m @ 2.75 g/t PdEq within 3m @ 2.48 g/t PdEq within 26m @ 1.10 g/t PdEq 33m @ 1.34 g/t PdEq Priority target with PGE 6m @ 2.93 g/t PdEq within mineralisation defined over 30m @ 1.44 g/t PdEq 300m and open in all directions For personal use only 4m @ 2.84 g/t PdEq within EN 14m @ 1.5
Slide 11: 2023 Priority Drilling at Brumby
2023 Priority Drilling at Brumby Drilling to test resource potential and pathway to resource evaluation For personal use only Step-out Drilling Targeting up to ~1,100m untested 7m @ 2.75 g/t PdEq within 33m @ 1.34 g/t PdEq strike, dip and grade continuity ERC075 Infill Drilling 6m @ 2.93 g/t PdEq wi
Slide 12: Building a Pipeline of PGE targets with resource potential
Building a Pipeline of PGE targets with resource potential Multiple target areas defined for further drilling § Nearly 50% of the § Follow-up and reconnaissance § To deliver a pipeline of LOUISA For personal use only Ultramafic strike drilling planned including PGE targets for resource is untested L
Slide 13: PGE Pipeline drill targets
PGE Pipeline drill targets Broadly untested targets with sparse drilling For personal use only Distance of Sydney Harbour Bridge Drillholes failed due to ground conditions 3m @ 1.09 g/t PdEq LONGHORN 6m @ 1.25 g/t PdEq 12m @ 1.0 g/t PdEq 7.1km western zone of Eastman intrusion with 11m @ 0.73 g/t Pd
Slide 14: PGE Pipeline drill targets
PGE Pipeline drill targets Broadly untested targets with sparse drilling For personal use only Distance of 3 WATERLOO 15m @ 1.25 g/t PdEq LOUISA Melbourne Cricket Grounds 1.5km of 1.1km of ultramafic strike 8m @ 1.08 g/t PdEq and 10m @ 0.8 g/t PdEq ultramafic strike with only four prior drillholes 1
Slide 15: Critical Minerals Exploration Pipeline
Critical Minerals Exploration Pipeline Early Stage Projects For personal use only EASTMAN SOUTH LAMBOO SOUTH Interpreted PGE Lithium + REE Potential Li-bearing ultramafic sequence pegmatite systems + with no record of large alkaline granitoid historical exploration bodies identified Anomalous PGE Po
Slide 16: Value Creation Pathway
Value Creation Pathway Strategic drill and field programs with two-pronged approach: For personal use only High priority Brumby target area § Step-out and infill drilling § Results from 10 holes pending § Potential to transition to resource evaluation § EIS co-funded diamond drilling § First pass me
Slide 17: Contact Us
For personal use only Contact Us Rae Clark T: 03 8610 4723 E: info@peako.com.au @peakolimited ASX:PKO ASX:PKO
Slide 18: Appendix: Palladium Metal Equivalents
Appendix Palladium Metal Equivalents For personal use only Peako has calculated Palladium Equivalent (PdEq) grades in order to reflect the potential contributions of each of the elements palladium, platinum, gold, nickel, copper and cobalt to a resource and assist in providing a concise indication o