Platinum Group Metals Ltd. · TSX:PTM

Platinum Group Metals — Shareholder Meeting (January 2012)

38 slides from Platinum Group Metals's shareholder meeting presentation, Jan 19, 2012

  1. Slide 1: Annual General Meeting January 19th 2012

    Annual General PLATINUM GROUP Meeting Januar y 19th METALS LTD. 201 2 PLG: NYSE/AMEX PTM: TSX

  2. Slide 2: Disclosure

    DISCLOSURE This presentation has been prepared by Platinum Group Metals Ltd. (“Platinum Group” or the “Company”). Information included in this presentation regarding the Company’s mineral properties has been compiled by R. Michael Jones, P.Eng, the President and Chief Executive Officer of the Compan

  3. Slide 3: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Certain of the statements made herein, including statements regarding the timing of future activities and achievements by the Company, future anticipated exploration and development programs, completion of a Feasibility Study in respect of the Western Bushveld Joint Ventur

  4. Slide 4: Why Platinum Group Metals?

    WHY PLATINUM GROUP The Company METALS?

  5. Slide 5: An Emerging Platinum Producer

    AN EMERGING PLATINUM PRODUCER  A well funded emerging producer with active exploration in South Africa and Canada.  Flagship Western Bushveld Joint Venture (WBJV) - large scale mine development in construction.  Waterberg – a new PGM discover y on the Nor th Limb.  Par tnerships with two Asian s

  6. Slide 6: Share Structure

    SHARE STRUCTURE Stock Symbols PLG: NYSE/AMEX PTM: TSX Market Capitalization $1 80M CAD Share Price $1 .00 CAD 52 Week High/Low $2.79/$0.85 Shares Outstanding 177,584,542 Options 14,499,500 Fully Diluted 192,084,042 Cash $95M CAD 6

  7. Slide 7: Three Years

    THREE YEARS January 2011 Construction Commences October 2009 Updated Feasibility Study April 2010 October 2010 August 2011 74% Transaction $143M Equity Project Loan Completed Financing Mandate 7

  8. Slide 8: Shareholders and Research

    SHAREHOLDERS AND RESEARCH Major Shareholders Research Coverage JP Morgan Asset Management Ltd. RBC Capital Markets Franklin Advisers Inc. Credit Suisse Chilton Investment Company LLC GMP Securities Genesis Investment Management LLP Raymond James Jennison Associates LLC Stifel Nicolaus Wellington Man

  9. Slide 9: The PGM Market

    Platinum THE PGM MARKET Palladium

  10. Slide 10: The Platinum Market

    THE PLATINUM MARKET SUPPLY DEMAND 10

  11. Slide 11: Deep and Deeper

    Shallow Declines – WBJV P1 DEPTH: 100m to 600m COST: $400M/$500M USD LEAD TIME: 3 Years Mined Out DEEP AND DEEPER The depth of S o u t h A f r i ca n platinum mines is becoming unsustainable First Generation at current Vertical Shafts m et a l p r i c e s . DEPTH: 600m to 1000m Second Generation COS

  12. Slide 12: Margin Squeeze Global

    MARGIN SQUEEZE GLOBAL PGM INDUSTRY UNDER WATER USD Cash Costs P l u s C a p ex p e r 3E PGM Oz WBJV P1 Source: RBC Capital Markets, September 2011 and Platinum Group Metals Ltd. 12

  13. Slide 13: Spot Platinum Price

    5 Year Platinum High 2252.06 Low 774,60 2400 2400 2200 2200 2000 2000 ® 1800 1800 5 1600 1600 t 1400 1400 - 1200 1200 8 1000 1000 800 800 600 600 400 wu, KitCO, COM goo Jano? Julo? Janos io JULO8 anog Julog an1o Julio Janit Julit Janiz - a” ased_on New York Close SPOT PLATINUM PRICE

  14. Slide 14: Western Bushveld Joint Venture

    WESTERN BUSHVELD Development JOINT VENTURE

  15. Slide 15: The Western Bushveld Complex

    THE WESTERN BUSHVELD COMPLEX SOUTH AFRICA 70% OF GLOBAL PLATINUM PRODUCTION 15

  16. Slide 16: North West Limb

    NORTH WEST LIMB The northern portion of the We s te r n L i m b is witnessing over $4B USD in new platinum mine building. 16

  17. Slide 17: Western Bushveld Joint Venture

    WESTERN BUSHVELD JOINT VENTURE  Platinum Group has a 74% interest in the WBJV. Wesizwe Platinum (WEZ/JSE) owns the remaining 26%.  Chinese state owned Jinchuan acquired a controlling stake in Wesizwe for $900M (USD) in 2010.  The WBJV is one of the last remaining undeveloped shallow Merensky depo

  18. Slide 18: WBJV Project 1 – Quick Facts

    WBJV PROJECT 1 – QUICK FACTS Resources 8.2M ounces 4E M+I Reserves 4.7M ounces 4E P+P Projected Steady State Production 275K ounces/year 4E Metal Split 64% Pt, 27% Pd, 5% Rh, 4% Au Mine Life 20+ years Projected First Production Q4 2013 Projected Operating Cost (8R/$) $526 USD/4E OZ (R528/tonne mille

  19. Slide 19: Western Bushveld Joint Venture aerial photo

    WESTERN BUSHVELD JOINT VENTURE N o v e m b e r 2 01 1 A e r i a l p h o to showing central decline construction a n d c o n t r a c to r l ay d o w n a r e a s . 19

  20. Slide 20: Styldrift Anglo Platinum and RBPlats

    ST YLDRIFT ANGLO PLATINUM AND RBPLATS N o v e m b e r 2 01 1 Adjacent Styldrift d e v e l o p me n t . $1 .5B capital cost mining the s a m e l aye r s down-dip of the WBJV 20

  21. Slide 21: Western Bushveld Joint Venture central decline

    WESTERN BUSHVELD JOINT VENTURE N o v e m b e r 2 01 1 C e n t r a l d e c l in e ex c ava t i o n . 21

  22. Slide 22: Western Bushveld Joint Venture water pipeline

    WESTERN BUSHVELD JOINT VENTURE N o v e m b e r 2 01 1 Wa te r p i p e l in e i n s t a l l a t io n . 22

  23. Slide 23: Western Bushveld Joint Venture drilling and blasting

    WESTERN BUSHVELD JOINT VENTURE N o v e m b e r 2 01 1 D r i l li n g a n d blasting at c e n t r al d e c l i n e . 23

  24. Slide 24: Project Banking

    PROJECT BANKING  Syndicate announced in August 2011 includes Barclays Capital, Standard Bank , CAT Financial and West LB.  $260M (USD) senior loan facility with a nine year term.  Additional working capital facility – up to $25M (USD) with standby subordinate loan facility if required.  Hedging

  25. Slide 25: Platinum Group - Jinchuan Synergy Study

    PLATINUM GROUP - JINCHUAN SYNERGY STUDY  Jointly mandated study with Jinchuan-Wesizwe examining cost savings and complementar y production profiles.  WBJV scheduled to ramp up in 2014 with Jinchuan-Wesizwe ramping up from 201 8-2023.  Focus on advantages from combined plant utilization and operat

  26. Slide 26: Project Milestones

    PROJECT MILESTONES  Q1 201 2 – Mining Right record of decision  Q1 201 2 – Jinchuan synergy study outcomes  Q2 201 2 – Completion of formal of f take arrangement and project banking  Q2 201 2 – Star t of Phase 2 implementation including construction of processing and plant infrastructure  Q4 20

  27. Slide 27: Waterberg Exploration

    WATERBERG Exploration

  28. Slide 28: The North Limb Bushveld Complex

    THE NORTH LIMB BUSHVELD COMPLEX SOUTH AFRICA 28

  29. Slide 29: The North Limb

    THE NORTH LIMB  The Nor th limb has recently seen mine expansion by Anglo Platinum and a great increase in exploration investment.  The Mogalkwena mine is Anglo Platinum’s most profitable operation.  The Ivanplats Platreef discover y has attracted a $280M (USD) investment from JOGMEC and Itochu C

  30. Slide 30: Waterberg

    WATERBERG  Acquired via prospecting permit - $50,000 (CAD) cost.  Japan Oil and Gas Mineral Exploration Corporation (JOGMEC) par tner ship completed in 2009.  JOGMEC earning into 37% interest by spending $3.2M USD by 2013.  Platinum Group holds a 49.97% ownership.  Discover y hole announced Nov

  31. Slide 31: Waterberg – Discovery Hole

    WATERBERG – DISCOVERY HOLE 31

  32. Slide 32: Waterberg Project Area Regional Geology

    WATERBERG PROJECT AREA REGIONAL GEOLOGY

  33. Slide 33: Waterberg Project Area Regional Magnetics

    WATERBERG PROJECT AREA REGIONAL MAGNETICS

  34. Slide 34: Waterberg Stratigraphy

    WATERBERG STRATIGRAPHY North Limb B u s h v e l d C o m p l ex 34

  35. Slide 35: Waterberg Core

    WATERBERG CORE N o v e m b e r 2 01 1 35

  36. Slide 36: Canadian Exploration - NWT

    CANADIAN EXPLORATION - NWT  9 Drill Intercepts with Impressive Ni, Cu PGM Grades  Grade can beat the remote location  Base work to expand deposit complete  100% interest and acquisition cost near zero  Massive Sulphides Drill Intercepts open for expansion include: 5.10 meters 1.73 Ni% 1.75 Cu %

  37. Slide 37: Conclusion

    CONCLUSION  Large scale, high margin platinum development in progress.  Par tnership with Chinese state owned Jinchuan Group.  Near term milestones: mining right, of f take and funding completion.  New PGM discover y on Nor th Limb with Japanese funding par tner JOGMEC.  An emerging platinum pr

  38. Slide 38: Contact

    CONTACT P l a t i n u m G r o u p M et a l s L t d . S u i te 3 2 8 – 5 5 0 B u r r a r d S t r e et Va n c o u ve r, B C V6C 2B5 +1 604-899-5450 i n f o @ p l a t i n u mg ro u p m et a l s . n et w w w. p l a t in u m g ro u p m et a l s . n et P l a t i n u m G r o u p M et a l s R S A ( P t y )