  1. Slide 1: Final results 2014

    Slide 1: Final results 2014

    Final results 2014 25 February 2015

  2. Slide 2: Important notice

    Slide 2: Important notice

    Important notice • This document has been prepared by Petrofac • Certain statements in this presentation are forward Limited (the Company) solely for use at looking statements. Words such as "expect", presentations held in connection with its Final "believe", "plan", "will", "could", "may", "project

  3. Slide 3: 1. Introduction and headlines

    Slide 3: 1. Introduction and headlines

    1. Introduction and headlines

  4. Slide 4: Agenda

    Slide 4: Agenda

    Agenda 1. Introduction and headlines Ayman Asfari 2. Strategic update and project review Ayman Asfari 3. Operating environment Ayman Asfari 4. Results and financial profile Tim Weller 5. Summary and outlook, Q&A Ayman Asfari, Tim Weller, Marwan Chedid and Rob Jewkes 4

  5. Slide 5: Financial headlines

    Slide 5: Financial headlines

    Financial headlines • Net profit before exceptional items and certain re-measurements of US$581 million, in line with previous guidance • Record year-end backlog of US$18.9 billion, which, together with US$3.5 billion of order intake in 2015 to date, gives excellent revenue visibility for 2015 and b

  6. Slide 6: Operational headlines

    Slide 6: Operational headlines

    Operational headlines • Strong competitive position in core business with record backlog and Well-positioned to respond excellent revenue visibility to operating environment • Will maintain bidding discipline and focus on our core areas of strength • Settlement agreement reached on Laggan-Tormore De

  7. Slide 7: 2. Strategic update and project review

    Slide 7: 2. Strategic update and project review

    2. Strategic update and project review

  8. Slide 8: Revisiting our key priorities for growth

    Slide 8: Revisiting our key priorities for growth

    Revisiting our key priorities for growth Key priorities for growth Performance • Success in Turkmenistan, Iraq, Mexico, Malaysia Geographic • Expand existing business • Disappointing performance in Shetland on expansion into new geographies Laggan-Tormore • West Africa - unproven • Success with deli

  9. Slide 9: Project review

    Slide 9: Project review

    Project review Ticleni Greater Laggan- Production Stella Tormore Enhancement Area Gas Plant, Contract, Development, Shetland Romania UKCS Islands, UK •During 2014, we worked •Sailaway expected in early •Agreed a commercial towards a revised Field 2016, with first production settlement with Total Dev

  10. Slide 10: Our overall portfolio remains in good shape

    Slide 10: Our overall portfolio remains in good shape

    Our overall portfolio remains in good shape • Over 25 years, we successfully delivered, or are delivering, more than US$50bn of projects • Our existing portfolio of approximately 50 ‘substantial’ projects is in good shape UK/Europe Iraq BorWin 3 (German North Sea) Badra field Laggan-Tormore gas plan

  11. Slide 11: Reflections on IES strategy: established in new geographies

    Slide 11: Reflections on IES strategy: established in new geographies

    Reflections on IES strategy IES has successfully… • Established Petrofac in new strategic geographies – PM304 facilitated our entry into Malaysia – This helped secure Berantai Risk Service Contract and developed in-country capability to undertake Sepat, Bekok C and RAPID refinery project – We have e

  12. Slide 12: Reflections on IES strategy: built our track record

    Slide 12: Reflections on IES strategy: built our track record

    Reflections on IES strategy IES has successfully… • Built our track record – Through Ohanet Risk Service Contract, in Algeria, we secured a US$600 million EPC project, by far our largest EPC project at that time – PM304 gave us skillset to deliver shallow water developments, including developing Don

  13. Slide 13: Refocused IES strategy

    Slide 13: Refocused IES strategy

    Refocused IES strategy IES will act as an integrator of the Group’s core capabilities – engineering, construction and operations Focus IES Strategy Manage the portfolio Lower capital intensity by Capital to maximise value, reducing invested Value capital and leveraging ‘lite’ while acting responsibl

  14. Slide 14: Strategic update and project review summary

    Slide 14: Strategic update and project review summary

    Strategic update and project review summary Taken decisive action to address challenges on Ticleni, Greater Stella Area and Laggan-Tormore Overall portfolio is in good shape, with built in margins consistent with guidance Re-focused IES strategy to improve synergies with ECOM, lower capital- intensi

  15. Slide 15: 3. Operating environment

    Slide 15: 3. Operating environment

    | i i H | I aan) —s = = Fi ale j = wh aa) F (oa RRS s ira | Je ; ees se 3 4 nee casein - PetrofaG@. Pa

  16. Slide 16: Operating environment - overview

    Slide 16: Operating environment - overview

    Operating environment - overview • Industry is adjusting to lower oil price 2014 year-end backlog environment 8% • At this stage, clients in our core onshore 18% markets are continuing to commit to ongoing investment 7% 67% • Operations and maintenance activity remains robust and opportunities to gr

  17. Slide 17: Onshore Engineering & Construction

    Slide 17: Onshore Engineering & Construction

    Onshore Engineering & Construction • OEC contributed > 80% of ECOM net profit over last 5 years with vast majority of onshore projects in MENA • Projects in MENA are often at lower end of oil supply cost curve • Majority of clients are NOCs who are committed to ongoing investment • Competitive posit

  18. Slide 18: Offshore Projects & Operations

    Slide 18: Offshore Projects & Operations

    Offshore Projects & Operations • Operations, maintenance and brownfield 2014 OPO revenue modifications activities remain robust 5% • More than 50% of gross margin comes 24% from projects outside of UK • Opportunities to build upon our existing activities internationally 71% – in UAE, Oman, Algeria a

  19. Slide 19: OPO - Offshore Capital Projects

    Slide 19: OPO - Offshore Capital Projects

    OPO - Offshore Capital Projects • Market for shallow water EPCI remains competitive • Long-term market for deepwater EPCI opportunities remains attractive and we remain committed to our strategy • Marketing Petrofac JSD6000 from mid-2017 but retain flexibility to delay delivery further dependent on

  20. Slide 20: McDermott strategic marketing alliance

    Slide 20: McDermott strategic marketing alliance

    McDermott strategic marketing alliance • Agreed a strategic marketing alliance with McDermott to address the deepwater SURF market • Under the 5 year Alliance, we will jointly pursue opportunities in the deepwater subsea, umbilicals, risers and flowlines (SURF) sector • Aim to develop first-class SU

  21. Slide 21: Engineering & Consulting Services

    Slide 21: Engineering & Consulting Services

    Engineering & Consulting Services • Recent success in securing ECS’ largest project on Rabab Harweel project in Oman, worth > US$1 billion - positioning ourselves for futher EPCm opportunities • ECS is helping to take us into new areas: – Helping Government of Nova Scotia to identify best way forwar

  22. Slide 22: Maintaining our strong competitive position

    Slide 22: Maintaining our strong competitive position

    Maintaining our strong competitive position • Building on cost efficiency and optimisation programme undertaken in 2013 and 2014, which focused on: – Resource optimisation – Tighter control and enhancing awareness of costs – Better integration of value engineering centres – Bidding prioritisation an

  23. Slide 23: Operating environment summary

    Slide 23: Operating environment summary

    Operating environment summary At this stage, clients in our core onshore markets are continuing to commit to ongoing investment Operations and maintenance activity remains robust and opportunities to grow internationally Marketing Petrofac JSD6000 from mid-2017 but retain flexibility to delay delive

  24. Slide 24: 4. Results and financial profile

    Slide 24: 4. Results and financial profile

    4. Results and financial profile

  25. Slide 25: Income statement

    Slide 25: Income statement

    Income statement US$m 2014** 2013 Revenue 6,241 6,329 Operating profit* 691 793 Profit before tax 634 789 Income tax expense (33) (142) Profit for the year 601 647 Profit attributable to Petrofac 581 650 Limited shareholders EBITDA 935 1,031 ROCE*** 18% 28% EPS, diluted (cents per share) 168.99 189.

  26. Slide 26: IES exceptional items and re-measurements

    Slide 26: IES exceptional items and re-measurements

    IES exceptional items and re-measurements US$million Pre-tax Tax Post-tax Ticleni PEC 164 3 167 Greater Stella Area 207 - 207 Other 92 (5) 87 TOTAL 463 (2) 461 • Group reviewed the carrying value of IES’ assets reflecting: – decision to exit Ticleni PEC – significantly lower hydrocarbon commodity pr

  27. Slide 27: Integrated Energy Services

    Slide 27: Integrated Energy Services

    Integrated Energy Services • Revenue i16% – reflecting Berantai RSC, now in its operational phase; rephasing field development activities on Mexico PECs; Ticleni PEC in Romania, as we managed field investment prudently; and sale of floating production facilities to PetroFirst • Net profit h5% – gain

  28. Slide 28: Onshore Engineering & Construction

    Slide 28: Onshore Engineering & Construction

    Onshore Engineering & Construction • Revenue i8% – activity levels and revenue increased substantially in 2H 2014 as moved into execution phase on new projects • Net profit i7% – loss provision on Laggan-Tormore substantially mitigated by net release of tax provisions and financial outperformance on

  29. Slide 29: Offshore Projects & Operations

    Slide 29: Offshore Projects & Operations

    Offshore Projects & Operations • Revenue h20% – higher levels of activity, particularly on capital projects such as Laggan-Tormore, FPF1 modification and SARB3 • Net profit i10% – pre-tax loss of around US$30m on OPO’s scope of work on Laggan-Tormore, no margin on FPF1 modification, US$8m forex loss

  30. Slide 30: Engineering & Consulting Services

    Slide 30: Engineering & Consulting Services

    Engineering & Consulting Services • Revenues h21% – substantial increase in activity levels, including Rabab Harweel Integrated Project in Oman and In Salah Gas and In Amenas consultancy contract • Net profit h3%, net margin 7.6% – net margin lower due to much of activity on Rabab Harweel Integrated

  31. Slide 31: Net debt movements

    Slide 31: Net debt movements

    Net debt movements Net debt was flat across the year, standing at US$0.7 billion at 31 December 2014: • cash generated from operations of US$0.9 billion • net investing activities of US$0.8bn • consideration in respect of PetroFirst transaction of US$0.4bn • financing activities, including payment o

  32. Slide 32: We have a strong financial position

    Slide 32: We have a strong financial position

    We have a strong financial position While we have revised expectations over recent months, including the impact of lower oil prices on IES, net debt is currently lower than our previous plans • Balance sheet remains strong and Moodys Baa2 prudently managed, reflected in strong investment grade credi

  33. Slide 33: Our backlog stands at record levels

    Slide 33: Our backlog stands at record levels

    Our backlog stands at record levels ECOM year-end backlog (US$ billion) • Backlog stands at record year-end • Well-positioned for long-term revenue levels, after delivering a year of record growth in ECOM as move into the order intake in 2014 execution stage on a number of EPC projects 33

  34. Slide 34: Our backlog gives us excellent revenue visibility

    Slide 34: Our backlog gives us excellent revenue visibility

    Our backlog gives us excellent revenue visibility 31 December 2014 backlog • ECOM’s year-end backlog has been ageing (US$bn)* augmented by the award of the Lower 5.9 Fars heavy oil project in Kuwait in January 5.6 0.5 5.4 • This gives us excellent revenue visibility 0.4 0.7 for 2015 and beyond 1.4 4

  35. Slide 35: Dividends, growth and returns

    Slide 35: Dividends, growth and returns

    Dividends, growth and returns • Maintained dividend in 2014 DIVIDEND • Maintaining robust financial position to support dividend remains a high priority • Target ROCE above 20% in medium-term as we RETURNS lower capital intensity • Record ECOM backlog positions us well for a return to long-term grow

  36. Slide 36: 5. Summary and outlook, Q&A

    Slide 36: 5. Summary and outlook, Q&A

    5. Summary and outlook, Q&A

  37. Slide 37: Summary and outlook

    Slide 37: Summary and outlook

    Summary and outlook • Taken decisive action to address Ticleni, Greater Stella Area and Laggan-Tormore and success in closing a number of commercial settlements • Re-focused IES strategy to improve synergies with ECOM, lower capital-intensity and we will manage the portfolio to maximise value • Our

  38. Slide 38: Appendices

    Slide 38: Appendices

    Appendices Petrofac r)

  39. Slide 39: Appendix 1: Group organisation structure

    Slide 39: Appendix 1: Group organisation structure

    Appendix 1: Group organisation structure Divisions Engineering, Construction, Operations & Integrated Energy Services (IES) Maintenance (ECOM) Chief Operating Officer, Chief Executive, Marwan Chedid Rob Jewkes Reporting Onshore segments Engineering Engineering Offshore Projects & & Consulting & Inte

  40. Slide 40: Appendix 2: Key ECOM projects

    Slide 40: Appendix 2: Key ECOM projects

    Appendix 2: Key ECOM projects Original contract NOC/NOC led company/consortium Joint NOC/IOC company/consortium IOC/IOC led company/consortium value to Petrofac Laggan-Tormore gas processing plant, UKCS >US$800m In Salah southern fields development, Algeria US$1,200m Badra oil field, Iraq US$330m Pe

  41. Slide 41: Appendix 3: Effective tax rate

    Slide 41: Appendix 3: Effective tax rate

    Appendix 3: Effective tax rate Effective tax rate (ETR) by segment 2014 2013 Onshore Engineering & Construction (7)% 10% Offshore Projects & Operations 28% 28% Engineering & Consulting Services 15% 12% Integrated Energy Services 22% 32% Group 5% 18% • Group’s effective tax rate (ETR), excluding the

  42. Slide 42: Appendix 4: Segmental performance

    Slide 42: Appendix 4: Segmental performance

    Appendix 4: Segmental performance • Onshore Engineering & Construction earned 50% of Group revenue and 64%* of net profit • Middle East and Africa represents 53% of revenues in 2014 • CIS and Asia: primarily relates to activity on Galkynysh in Turkmenistan, Berantai and PM304 in Malaysia • Europe: a

  43. Slide 43: Appendix 5: Employees

    Slide 43: Appendix 5: Employees

    Appendix 5: Employees • Approximately 19,800 people in 7 key operating centres and 24 offices • Around 30% of our employees are shareholders/participants in employee share schemes Total headcount 200 3,300 5,900 4,900 5,500 OEC OPO ECS IES Corporate Operating centre Country office 43

  44. Slide 44: Appendix 6: IES data book update

    Slide 44: Appendix 6: IES data book update

    Appendix 6: IES data book update 44

  45. Slide 45: Key IES projects

    Slide 45: Key IES projects

    Key IES projects Production Enhancement Contracts (PEC)** END DATE TRANSITION Magallanes and Santuario, Mexico PERIOD 2037 TRANSITION Pánuco, Mexico* PERIOD 2043 TRANSITION Arenque, Mexico PERIOD 2043 Risk Service Contracts (RSC)** Berantai development, Malaysia 2020 Equity Upstream Investments Bloc

  46. Slide 46: IES project portfolio

    Slide 46: IES project portfolio

    IES project portfolio Oil and gas Intangible oil facilities per and gas assets Oil and gas note 10 (Ohanet per note 13 assets per (fully (Block PM304, note 10 (Block depreciated) OML119 and PM304, and floating other pre- Greater Stella Chergui and production development Area per note PECs) facilitie

  47. Slide 47: Key IES projects

    Slide 47: Key IES projects

    Key IES projects The following slides describe the following for each of the three commercial models: A A reminder of how the commercial model works B The current projects within each portfolio C The key facts pertaining to those projects D The key operational activities we expect to undertake E The

  48. Slide 48: Production Enhancement Contracts: commercial model

    Slide 48: Production Enhancement Contracts: commercial model

    Production Enhancement Contracts A • Under the PEC commercial model we are paid a tariff per barrel for production and Commercial Model earnings are not directly impacted by commodity prices • PECs are appropriate for mature fields which have a long production history • Our contracts are long-term •

  49. Slide 49: Production Enhancement Contracts: key facts, Magallanes and Santuario

    Slide 49: Production Enhancement Contracts: key facts, Magallanes and Santuario

    Production Enhancement Contracts C Magallanes and Santuario, Mexico • Petrofac is providing production enhancement services to PEMEX (the concession holder) for the Magallanes and Santuario blocks in Tabasco State, central Mexico • Contract was signed in October 2011 and Petrofac took over field ope

  50. Slide 50: Production Enhancement Contracts: key facts, Pánuco

    Slide 50: Production Enhancement Contracts: key facts, Pánuco

    Production Enhancement Contracts C Pánuco, Mexico • Petrofac is providing production enhancement services to PEMEX (the concession holder) for the Pánuco block in Veracruz State, eastern Mexico • First award in conjunction with Schlumberger under the co-operation agreement Key Facts • Contract was s

  51. Slide 51: Production Enhancement Contracts: Arenque

    Slide 51: Production Enhancement Contracts: Arenque

    Production Enhancement Contracts C Arenque, Mexico • Petrofac is providing production enhancement services to PEMEX (the concession holder) for the Arenque block, located 30 kms from Tampico on the Mexican continental shelf, eastern Mexico Key Facts • Contract was signed in November 2012 and Petrofa

  52. Slide 52: Production Enhancement Contracts: valuation drivers

    Slide 52: Production Enhancement Contracts: valuation drivers

    Production Enhancement Contracts E • As part of the ongoing energy reforms in Mexico, we have the opportunity to migrate our Valuation drivers portfolio of Production Enhancement Contracts in Mexico to a new form of contract • At this stage, the detailed commercial terms of the new contractual arran

  53. Slide 53: Risk Service Contracts: commercial model and Berantai

    Slide 53: Risk Service Contracts: commercial model and Berantai

    Risk Service Contracts A • Under the RSC commercial model we develop, operate and/or maintain a field, while the Commercial resource holder retains ownership and control of their reserves Model • Our interests are aligned: we fund the development and are reimbursed (typically from production cash fl

  54. Slide 54: Risk Service Contracts: operational activities

    Slide 54: Risk Service Contracts: operational activities

    Risk Service Contracts D Berantai oil and gas field, Malaysia • The key operational activities on the Berantai project include: • 2012: achievement of first gas and the drilling of the initial phase one wells • 2013: completion of the phase one drilling campaign • 2015+: possible in-fill drilling Op

  55. Slide 55: Risk Service Contracts: valuation drivers

    Slide 55: Risk Service Contracts: valuation drivers

    Risk Service Contracts E • We recover costs and profits from the sale proceeds of production but we do not share in the barrels of production as we have no legal ownership/entitlement to the reserves • We are not directly exposed to prevailing commodity prices unless production volumes and or prices

  56. Slide 56: Equity Upstream Investments: commercial model

    Slide 56: Equity Upstream Investments: commercial model

    Equity Upstream Investments A Commercial Model • Under this commercial model we take a direct interest in a field via a Production Sharing Contract or Concession Agreement • We have production and commodity price exposure B • Our current portfolio includes the following contracts: Projects • Block P

  57. Slide 57: Equity Upstream Investments: Block PM304, Malaysia

    Slide 57: Equity Upstream Investments: Block PM304, Malaysia

    Equity Upstream Investments C Block PM304, Malaysia • Petrofac has a 30% operating interest in Block PM304 • The interest was acquired in 2004 and is held through a PSC • Petrofac’s partners in the PSC are PETRONAS (30%), KUFPEC (25%) and PetroVietnam (15%) Key Facts • The first phase of development

  58. Slide 58: Equity Upstream Investments: Chergui and Greater Stella Area

    Slide 58: Equity Upstream Investments: Chergui and Greater Stella Area

    Equity Upstream Investments C Chergui, Tunisia • Petrofac has a 45% interest in the Chergui gas field, held through a Concession Agreement • The interest was obtained in 2007 from ETAP, the Tunisian national oil company, which holds the remaining 55% interest • Petrofac completed engineering and con

  59. Slide 59: Equity Upstream Investments: operational activities

    Slide 59: Equity Upstream Investments: operational activities

    Equity Upstream Investments D Block PM304, Malaysia Operational Activities • 2015: Ramp up of production expected as water injection and gas lift fully commissioned ‘C’ wells being brought on stream Chergui, Tunisia • 2015+: possible in-fill drilling (but project ‘steady state’) 59

  60. Slide 60: Greater Stella Area operational activities

    Slide 60: Greater Stella Area operational activities

    Equity Upstream Investments D Greater Stella Area Development, UK • 2015-16: completion of modification and upgrade of the FPF1 and commencement of production from the Greater Stella Area Operational Activities 60

  61. Slide 61: Equity Upstream Investments: valuation drivers

    Slide 61: Equity Upstream Investments: valuation drivers

    Equity Upstream Investments E • The expected profile of aggregate net production for our existing EUIs is as below: Valuation Drivers Point forward data from 1 January 2015: Liquids as % of barrels of oil equivalent (boe) 71% Average gas price (US$ per million cubic feet) 11 Capex (US$ per barrel un

Source: company website