Sheffield Resources Limited · ASX:SFX

Sheffield Resources — Non-Deal Roadshow (April 2017)

32 slides from Sheffield Resources's roadshow presentation, April 2017

  1. Slide 1: Thunderbird: The Emerging Force in Mineral Sands

    Thunderbird The Emerging Force in Mineral Sands Investor Presentation Global Roadshow March/April 2017 ASX : SFX 1

  2. Slide 2: Compliance and Disclaimer

    COMPLIANCE AND DISCLAIMER PREVIOUSLY REPORTED INFORMATION This presentation includes information that relates to Exploration Results, Mineral Resources and Ore Reserves prepared and first disclosed under the JORC Code (2012) and a Bankable Feasibility Study. The information was extracted from Sheffi

  3. Slide 3: Compliance and Disclaimer (Continued)

    COMPLIANCE AND DISCLAIMER CAUTIONARY STATEMENTS AND RISK FACTORS (Continued) Forward-looking statements are provided as a general guide only and should not be relied on as a guarantee of future performance. Forward-looking statements may be affected by a range of variables that could cause actual re

  4. Slide 4: World Class Project

    WORLD CLASS PROJECT • BFS demonstrates Thunderbird to be a world class project • Large high grade Ore Reserve1 • 42 year mine life2 (estimated) • Low risk mining jurisdiction • Close to Asian markets • Simple project logistics • Potential to be a globally significant supplier of zircon and ilmenite

  5. Slide 5: World Class Ore Reserve

    WORLD CLASS ORE RESERVE 5.00 TiO2 Grade Fairbreeze (TROX) In Situ Titanium Minerals (Ilm+Lux+Rut) % Namakwa (TROX) 4.00 QMM (RIO) Cataby (ILU) THUNDERBIRD (SFX) Kwale (BSE) Moma (KMR) 3.00 Dongara (TROX) Richards Bay (RIO) Cyclone (DRX) 2.00 Sierra Rutile (ILU) Keysbrook (MZI) Cooljarloo West (TROX)

  6. Slide 6: Our Team – Experienced & Skilled

    OUR TEAM – EXPERIENCED & SKILLED MANAGEMENT Mining Engineer with over 35 years experience leading the financing, development Bruce McFadzean and operation of mines in Australia and overseas, including roles with BHP Billiton and Managing Director Rio Tinto. Previously Managing Director of Catalpa Re

  7. Slide 7: Market Conditions Have Turned

    MARKET CONDITIONS HAVE TURNED1 Zircon Price: Actual, Consensus and BFS Assumption Ilmenite Price – Actual, Consensus and BFS Assumption $1,600 $250 US$/tonne BFS $1,400 $200 $1,200 US$/tonne US$/tonne $150 $1,000 $100 $800 US$/tonne BFS $50 $600 $400 $- 2014 2015 2016 2016 2017 2017 2018 2019 2020 2

  8. Slide 8: BFS Key Highlights

    BFS KEY HIGHLIGHTS1 LOM site costs4 US$8.55/t ore mined 1. Actual results may differ from these estimates. Please refer to the assumptions, sensitivities, risk factors and cautionary statements disclosed respectively on pages 7, 9, 10 and 56 of the Company's announcement “THUNDERBIRD BFS DELIVERS OU

  9. Slide 9: VHM Grade & Deposit Thickness = Value

    VHM GRADE & DEPOSIT THICKNESS = VALUE • Thunderbird has a continuous High Grade Zone of up to 46m thickness: the “GT Zone” • Project economics are based on GT Zone’s strong continuity and very high Valuable HM grades • Near-surface, high value areas targeted in early years of production • GT Zone re

  10. Slide 10: Conventional Processing

    CONVENTIONAL PROCESSING • Conventional heavy mineral sands Delivers 5 quality products processing circuit1 • Includes an ilmenite upgrade step using a low temperature roast (“LTR”) • LTR upgrades the primary ilmenite to 56.1% TiO2 sulphate ilmenite with ability to control to higher grades • LTR ilme

  11. Slide 11: Logistics – Simple & Close to Market

    LOGISTICS – SIMPLE & CLOSE TO MARKET • Products proposed to be trucked 140km from mine to ports at Derby and Broome, including 110km on major National Highway • Road haulage fleet and marine barging based in Derby • Access agreement in place for port storage, wharf and bulk handling facility at Derb

  12. Slide 12: Summary BFS Metrics

    SUMMARY BFS METRICS Thunderbird Project Assumed Product Prices Thunderbird Project Estimated Production Outputs Financial Financial Financial Financial Average Product Average Production Year Year LOM5 Year Year LOM5 Prices (US$)2 per annum 2019 – 2023 2024 – 20334 3 2019 – 2023 2024 – 20334 3 Premi

  13. Slide 13: Summary BFS Outputs

    SUMMARY BFS OUTPUTS Financial Year Financial Year A$m, Real 2017 Prices LOM7 2019 – 20235 2024 – 20336 Ore Mined (Mt) 32.8 173.8 680.6 Strip Ratio (W:O) 0.52 0.58 0.77 VHM Grade (%) 6.41 5.10 4.49 Revenue 854 3,875 13,560 Royalties (50) (223) (781) Net Revenue 803 3,652 12,779 Opex: Mining (104) (42

  14. Slide 14: Product Price Assumptions

    PRODUCT PRICE ASSUMPTIONS1 $1,387 $1,400 $1,200 US$/tonne FOB, real 2017 prices $1,000 $800 $677 $600 $500 $400 $200 $183 $48 $0 Mar-19 Sep-19 Mar-20 Sep-20 Mar-21 Sep-21 Mar-22 Sep-22 Premium Zircon Zircon Concentrate Hi-Ti 88 LTR Ilmenite Titano-Magnetite TZMI Primary Zircon • Sheffield has conser

  15. Slide 15: Project NPV Sensitivities A$ (+/-10%)

    PROJECT NPV SENSITIVITIES A$ (+/-10%) Product prices, recoveries and ore grade are key sensitivity drivers Base Case: NPV A$675.6m All Product Prices (in AUD) 418 933 Plant Recoveries – All Products 440 902 Ore VHM Grade 446 902 Product Price - Premium Zircon & Zircon Concentrate 517 835 Recoveries

  16. Slide 16: Product Volumes

    PRODUCT VOLUMES Stage 1 Stage 2 1,400 1,200 1,124 1,134 1,025 966 1,000 336 336 878 869 307 773 000 Tonnes 800 288 99 96 261 259 581 584 109 84 226 559 99 80 600 95 73 71 90 415 170 170 81 79 68 166 76 400 52 53 122 49 51 58 60 567 568 518 486 441 437 200 382 280 286 286 205 0 Year 1 Year 2 Year 3 Y

  17. Slide 17: Solid Revenue to Cost Ratio

    SOLID REVENUE TO COST RATIO • Anticipated high margin producer • Thunderbird represented adjacent to first quartile producers, several of whom are vertically integrated with beneficiation plants 1. 4 Year production period following Stage 1 ramp-up (Year 3 to Year 7 of operation) 2. 2020 Cost Curve

  18. Slide 18: A Strong Cash Margin Operation

    A STRONG CASH MARGIN OPERATION Stage 1 Stage 2 $30 26.96 27.10 29.22 25.84 24.38 $25 22.55 22.93 20.48 20.84 19.85 18.98 $A per tonne mined $20 15.50 14.74 14.24 14.15 $15 1.80 1.99 1.69 1.72 11.73 11.32 10.65 10.30 10.67 10.92 1.85 2.35 2.23 2.38 10.18 1.03 0.99 1.01 $10 0.93 0.97 0.94 1.01 1.58 1.

  19. Slide 19: Stage 1 Annual Operating Expenditure

    STAGE 1 ANNUAL OPERATING EXPENDITURE A$m p.a. (average) Mining 2% Mining Labour Labour $17.1 12% $22.8 21% Reagents Electricity 7% Natural Gas Natural Gas $11.1 5% Consumables Electricity $5.8 $16.8 11% Maintenance Maintenance 8% Site G&A (excluding General and $17.1 labour) $9.0 Administration Tran

  20. Slide 20: Capital Expenditure

    CAPITAL EXPENDITURE Description US$M A$M Processing 200 186 Plant Area Civils & Process Water Systems 19.0 25.3 180 Wet Concentrator Plant 43.5 58.0 160 152 Concentrate Upgrade Plant 25.7 34.3 140 122 Zircon Processing Plant 59.2 78.9 120 Ilmenite Processing Plant 22.7 30.2 100 Low Temperature Roast

  21. Slide 21: A Project for the Community

    A PROJECT FOR THE COMMUNITY • Lead Agency status promotes State and regional project support • Approximately 140 direct full time jobs from the local community with all employees living locally • Significant business opportunities with a key focus on Aboriginal participation • Sheffield commitment t

  22. Slide 22: Offtake and Market Status

    OFFTAKE AND MARKET STATUS • The Thunderbird project is one of the few large mineral sands projects globally located in a low risk jurisdiction • Thunderbird designed to deliver high quality zircon and ilmenite products, with the ability to displace lower quality products in the market • In particula

  23. Slide 23: Financing

    FINANCING • To achieve the forecast outcomes in the BFS, Sheffield will require a funding solution that delivers at least A$355 million1 in new capital via debt, equity and/or JV options • Since the PFS, the Company has received interest from international financial and strategic investors, offtaker

  24. Slide 24: Timeline – Key Targets to Production

    TIMELINE – KEY TARGETS TO PRODUCTION1 EPC 2017 Complete negotiations and award contracts PRE-WORKS Q3/Q4 2017 BFS Commence pre-works, CONSTRUCTION2 FINAL PRODUCTS camp, site preparation 2017 - 2019 2019 Q1 2017 for construction team Construction commences2 Progressive ramp-up of Publish study commen

  25. Slide 25: A World Class Mineral Sands Project

    A WORLD CLASS MINERAL SANDS PROJECT • BFS confirms Thunderbird as a world class mineral sands project • Long mine life estimate of 42 years, offering leverage to multiple pricing cycles • 100% owned and located in one of the world’s best mining jurisdictions • Pre-tax NPV10 of A$676 million, IRR of

  26. Slide 26: Appendices

    APPENDICES <li

  27. Slide 27: Corporate Snapshot

    CORPORATE SNAPSHOT ASX ISSUED SHARE SHARE PRICE MARKET CASH ENTERPRISE TOP TWENTY CODE SHARES OPTIONS (21 Mar 2017) CAP (UNAUDITED)1 VALUE SHAREHOLDERS2 SFX 181.0M 16.1M2 A$0.59 A$107M A$11.7M A$95M ~49% 12 Month Share Price $0.90 $0.80 13% $0.70 $0.60 15% $0.50 $0.40 $0.30 72% $0.20 $0.10 $- Direct

  28. Slide 28: Regional Exploration Potential

    REGIONAL EXPLORATION POTENTIAL NEW PROVINCE – MULTIPLE DISCOVERIES Bells Tower Seagull • Limited scout drilling has lead to new discoveries including the zircon-rich Night Country Downs Train prospect, e.g. 7.5m @ 8.23% HM1 Thunderbird • Night Train has a high value mineral assemblage: 92% VHM, incl

  29. Slide 29: Zircon - Premium Product

    ZIRCON - PREMIUM PRODUCT • Ceramic Grade Zircon • > 66% ZrO2 • Low Fe2O3 • Low TiO2 • Very Low Al2O3 • Moderate U+Th • Good Opacity • Off-take Discussions in Progress Composition (%) Premium Zircon Typical1 ZrO2+HfO2 % 66.2 – 66.6 Raw Ilmenite 66.30 TiO2 % 0.09 – 0.18 0.14 Fe2O3 % 0.06 – 0.08 0.08 S

  30. Slide 30: LTR Ilmenite - Premium Product

    LTR ILMENITE - PREMIUM PRODUCT • Exceptional Grade Global Ilmenite Comparison FeO:Fe2O3 Ratio • 56 – 58% TiO2 3.0 2.5 • Outstanding FeO:Fe2O3 2.0 • Low Fe2O3 (<13%) 1.5 • Low Levels of Cr2O3 1.0 • High Acid Solubility 0.5 • Good reactivity rate 0.0 • Market Leading quality Thunderbird Premium East E

  31. Slide 31: Ore Reserves

    ORE RESERVES THUNDERBIRD DEPOSIT ORE RESERVES1,4 Valuable Heavy Mineral (VHM) in-situ grade In-situ HM Valuable HM Grade (In-situ)2 Ore Reserve Ore Tonnes HM Grade Slimes Osize Tonnes Zircon HiTi Leuc Leuc Ilmenite Category (millions) (%) (%) (%) (millions) % % % % Proved 235.8 31.4 13.3 1.00 0.29 0

  32. Slide 32: Mineral Resources

    MINERAL RESOURCES THUNDERBIRD DEPOSIT MINERAL RESOURCE1,2,7 Mineral Material In-situ HM Valuable HM Grade (In-situ)4 Cut-off HM Grade3 Slimes Osize Resource Tonnes Tonnes Zircon HiTi Leuc Leuc Ilmenite (HM%) (%) (%) (%) Category (millions) (millions) (%) (%) (%) (%) Measured 510 45 8.9 0.71 0.20 0.1