Slide 1: Thunderbird: The Emerging Force in Mineral Sands
Thunderbird The Emerging Force in Mineral Sands Investor Presentation Global Roadshow March/April 2017 ASX : SFX 1
Slide 2: Compliance and Disclaimer
COMPLIANCE AND DISCLAIMER PREVIOUSLY REPORTED INFORMATION This presentation includes information that relates to Exploration Results, Mineral Resources and Ore Reserves prepared and first disclosed under the JORC Code (2012) and a Bankable Feasibility Study. The information was extracted from Sheffi
Slide 3: Compliance and Disclaimer (Continued)
COMPLIANCE AND DISCLAIMER CAUTIONARY STATEMENTS AND RISK FACTORS (Continued) Forward-looking statements are provided as a general guide only and should not be relied on as a guarantee of future performance. Forward-looking statements may be affected by a range of variables that could cause actual re
Slide 4: World Class Project
WORLD CLASS PROJECT • BFS demonstrates Thunderbird to be a world class project • Large high grade Ore Reserve1 • 42 year mine life2 (estimated) • Low risk mining jurisdiction • Close to Asian markets • Simple project logistics • Potential to be a globally significant supplier of zircon and ilmenite
Slide 5: World Class Ore Reserve
WORLD CLASS ORE RESERVE 5.00 TiO2 Grade Fairbreeze (TROX) In Situ Titanium Minerals (Ilm+Lux+Rut) % Namakwa (TROX) 4.00 QMM (RIO) Cataby (ILU) THUNDERBIRD (SFX) Kwale (BSE) Moma (KMR) 3.00 Dongara (TROX) Richards Bay (RIO) Cyclone (DRX) 2.00 Sierra Rutile (ILU) Keysbrook (MZI) Cooljarloo West (TROX)
Slide 6: Our Team – Experienced & Skilled
OUR TEAM – EXPERIENCED & SKILLED MANAGEMENT Mining Engineer with over 35 years experience leading the financing, development Bruce McFadzean and operation of mines in Australia and overseas, including roles with BHP Billiton and Managing Director Rio Tinto. Previously Managing Director of Catalpa Re
Slide 7: Market Conditions Have Turned
MARKET CONDITIONS HAVE TURNED1 Zircon Price: Actual, Consensus and BFS Assumption Ilmenite Price – Actual, Consensus and BFS Assumption $1,600 $250 US$/tonne BFS $1,400 $200 $1,200 US$/tonne US$/tonne $150 $1,000 $100 $800 US$/tonne BFS $50 $600 $400 $- 2014 2015 2016 2016 2017 2017 2018 2019 2020 2
Slide 8: BFS Key Highlights
BFS KEY HIGHLIGHTS1 LOM site costs4 US$8.55/t ore mined 1. Actual results may differ from these estimates. Please refer to the assumptions, sensitivities, risk factors and cautionary statements disclosed respectively on pages 7, 9, 10 and 56 of the Company's announcement “THUNDERBIRD BFS DELIVERS OU
Slide 9: VHM Grade & Deposit Thickness = Value
VHM GRADE & DEPOSIT THICKNESS = VALUE • Thunderbird has a continuous High Grade Zone of up to 46m thickness: the “GT Zone” • Project economics are based on GT Zone’s strong continuity and very high Valuable HM grades • Near-surface, high value areas targeted in early years of production • GT Zone re
Slide 10: Conventional Processing
CONVENTIONAL PROCESSING • Conventional heavy mineral sands Delivers 5 quality products processing circuit1 • Includes an ilmenite upgrade step using a low temperature roast (“LTR”) • LTR upgrades the primary ilmenite to 56.1% TiO2 sulphate ilmenite with ability to control to higher grades • LTR ilme
Slide 11: Logistics – Simple & Close to Market
LOGISTICS – SIMPLE & CLOSE TO MARKET • Products proposed to be trucked 140km from mine to ports at Derby and Broome, including 110km on major National Highway • Road haulage fleet and marine barging based in Derby • Access agreement in place for port storage, wharf and bulk handling facility at Derb
Slide 12: Summary BFS Metrics
SUMMARY BFS METRICS Thunderbird Project Assumed Product Prices Thunderbird Project Estimated Production Outputs Financial Financial Financial Financial Average Product Average Production Year Year LOM5 Year Year LOM5 Prices (US$)2 per annum 2019 – 2023 2024 – 20334 3 2019 – 2023 2024 – 20334 3 Premi
Slide 13: Summary BFS Outputs
SUMMARY BFS OUTPUTS Financial Year Financial Year A$m, Real 2017 Prices LOM7 2019 – 20235 2024 – 20336 Ore Mined (Mt) 32.8 173.8 680.6 Strip Ratio (W:O) 0.52 0.58 0.77 VHM Grade (%) 6.41 5.10 4.49 Revenue 854 3,875 13,560 Royalties (50) (223) (781) Net Revenue 803 3,652 12,779 Opex: Mining (104) (42
Slide 14: Product Price Assumptions
PRODUCT PRICE ASSUMPTIONS1 $1,387 $1,400 $1,200 US$/tonne FOB, real 2017 prices $1,000 $800 $677 $600 $500 $400 $200 $183 $48 $0 Mar-19 Sep-19 Mar-20 Sep-20 Mar-21 Sep-21 Mar-22 Sep-22 Premium Zircon Zircon Concentrate Hi-Ti 88 LTR Ilmenite Titano-Magnetite TZMI Primary Zircon • Sheffield has conser
Slide 15: Project NPV Sensitivities A$ (+/-10%)
PROJECT NPV SENSITIVITIES A$ (+/-10%) Product prices, recoveries and ore grade are key sensitivity drivers Base Case: NPV A$675.6m All Product Prices (in AUD) 418 933 Plant Recoveries – All Products 440 902 Ore VHM Grade 446 902 Product Price - Premium Zircon & Zircon Concentrate 517 835 Recoveries
Slide 16: Product Volumes
PRODUCT VOLUMES Stage 1 Stage 2 1,400 1,200 1,124 1,134 1,025 966 1,000 336 336 878 869 307 773 000 Tonnes 800 288 99 96 261 259 581 584 109 84 226 559 99 80 600 95 73 71 90 415 170 170 81 79 68 166 76 400 52 53 122 49 51 58 60 567 568 518 486 441 437 200 382 280 286 286 205 0 Year 1 Year 2 Year 3 Y
Slide 17: Solid Revenue to Cost Ratio
SOLID REVENUE TO COST RATIO • Anticipated high margin producer • Thunderbird represented adjacent to first quartile producers, several of whom are vertically integrated with beneficiation plants 1. 4 Year production period following Stage 1 ramp-up (Year 3 to Year 7 of operation) 2. 2020 Cost Curve
Slide 18: A Strong Cash Margin Operation
A STRONG CASH MARGIN OPERATION Stage 1 Stage 2 $30 26.96 27.10 29.22 25.84 24.38 $25 22.55 22.93 20.48 20.84 19.85 18.98 $A per tonne mined $20 15.50 14.74 14.24 14.15 $15 1.80 1.99 1.69 1.72 11.73 11.32 10.65 10.30 10.67 10.92 1.85 2.35 2.23 2.38 10.18 1.03 0.99 1.01 $10 0.93 0.97 0.94 1.01 1.58 1.
Slide 19: Stage 1 Annual Operating Expenditure
STAGE 1 ANNUAL OPERATING EXPENDITURE A$m p.a. (average) Mining 2% Mining Labour Labour $17.1 12% $22.8 21% Reagents Electricity 7% Natural Gas Natural Gas $11.1 5% Consumables Electricity $5.8 $16.8 11% Maintenance Maintenance 8% Site G&A (excluding General and $17.1 labour) $9.0 Administration Tran
Slide 20: Capital Expenditure
CAPITAL EXPENDITURE Description US$M A$M Processing 200 186 Plant Area Civils & Process Water Systems 19.0 25.3 180 Wet Concentrator Plant 43.5 58.0 160 152 Concentrate Upgrade Plant 25.7 34.3 140 122 Zircon Processing Plant 59.2 78.9 120 Ilmenite Processing Plant 22.7 30.2 100 Low Temperature Roast
Slide 21: A Project for the Community
A PROJECT FOR THE COMMUNITY • Lead Agency status promotes State and regional project support • Approximately 140 direct full time jobs from the local community with all employees living locally • Significant business opportunities with a key focus on Aboriginal participation • Sheffield commitment t
Slide 22: Offtake and Market Status
OFFTAKE AND MARKET STATUS • The Thunderbird project is one of the few large mineral sands projects globally located in a low risk jurisdiction • Thunderbird designed to deliver high quality zircon and ilmenite products, with the ability to displace lower quality products in the market • In particula
Slide 23: Financing
FINANCING • To achieve the forecast outcomes in the BFS, Sheffield will require a funding solution that delivers at least A$355 million1 in new capital via debt, equity and/or JV options • Since the PFS, the Company has received interest from international financial and strategic investors, offtaker
Slide 24: Timeline – Key Targets to Production
TIMELINE – KEY TARGETS TO PRODUCTION1 EPC 2017 Complete negotiations and award contracts PRE-WORKS Q3/Q4 2017 BFS Commence pre-works, CONSTRUCTION2 FINAL PRODUCTS camp, site preparation 2017 - 2019 2019 Q1 2017 for construction team Construction commences2 Progressive ramp-up of Publish study commen
Slide 25: A World Class Mineral Sands Project
A WORLD CLASS MINERAL SANDS PROJECT • BFS confirms Thunderbird as a world class mineral sands project • Long mine life estimate of 42 years, offering leverage to multiple pricing cycles • 100% owned and located in one of the world’s best mining jurisdictions • Pre-tax NPV10 of A$676 million, IRR of
Slide 26: Appendices
APPENDICES <li
Slide 27: Corporate Snapshot
CORPORATE SNAPSHOT ASX ISSUED SHARE SHARE PRICE MARKET CASH ENTERPRISE TOP TWENTY CODE SHARES OPTIONS (21 Mar 2017) CAP (UNAUDITED)1 VALUE SHAREHOLDERS2 SFX 181.0M 16.1M2 A$0.59 A$107M A$11.7M A$95M ~49% 12 Month Share Price $0.90 $0.80 13% $0.70 $0.60 15% $0.50 $0.40 $0.30 72% $0.20 $0.10 $- Direct
Slide 28: Regional Exploration Potential
REGIONAL EXPLORATION POTENTIAL NEW PROVINCE – MULTIPLE DISCOVERIES Bells Tower Seagull • Limited scout drilling has lead to new discoveries including the zircon-rich Night Country Downs Train prospect, e.g. 7.5m @ 8.23% HM1 Thunderbird • Night Train has a high value mineral assemblage: 92% VHM, incl
Slide 29: Zircon - Premium Product
ZIRCON - PREMIUM PRODUCT • Ceramic Grade Zircon • > 66% ZrO2 • Low Fe2O3 • Low TiO2 • Very Low Al2O3 • Moderate U+Th • Good Opacity • Off-take Discussions in Progress Composition (%) Premium Zircon Typical1 ZrO2+HfO2 % 66.2 – 66.6 Raw Ilmenite 66.30 TiO2 % 0.09 – 0.18 0.14 Fe2O3 % 0.06 – 0.08 0.08 S
Slide 30: LTR Ilmenite - Premium Product
LTR ILMENITE - PREMIUM PRODUCT • Exceptional Grade Global Ilmenite Comparison FeO:Fe2O3 Ratio • 56 – 58% TiO2 3.0 2.5 • Outstanding FeO:Fe2O3 2.0 • Low Fe2O3 (<13%) 1.5 • Low Levels of Cr2O3 1.0 • High Acid Solubility 0.5 • Good reactivity rate 0.0 • Market Leading quality Thunderbird Premium East E
Slide 31: Ore Reserves
ORE RESERVES THUNDERBIRD DEPOSIT ORE RESERVES1,4 Valuable Heavy Mineral (VHM) in-situ grade In-situ HM Valuable HM Grade (In-situ)2 Ore Reserve Ore Tonnes HM Grade Slimes Osize Tonnes Zircon HiTi Leuc Leuc Ilmenite Category (millions) (%) (%) (%) (millions) % % % % Proved 235.8 31.4 13.3 1.00 0.29 0
Slide 32: Mineral Resources
MINERAL RESOURCES THUNDERBIRD DEPOSIT MINERAL RESOURCE1,2,7 Mineral Material In-situ HM Valuable HM Grade (In-situ)4 Cut-off HM Grade3 Slimes Osize Resource Tonnes Tonnes Zircon HiTi Leuc Leuc Ilmenite (HM%) (%) (%) (%) Category (millions) (millions) (%) (%) (%) (%) Measured 510 45 8.9 0.71 0.20 0.1