LS telcom AG · XETR:LSX
LS telcom — LS telcom Summit 2015
14 slides from LS telcom's conference presentation, Jul 1, 2015
Slide 1: The legal protection of mobile radio technology
The legal protection of mobile radio technology Peer Kollecker Lawyer Specialist lawyer for administrative law
Slide 2: Wolter Hoppenberg — summary
Wolter Hoppenberg — summary ¢ More than 50 lawyers, tax accountants and notaries ¢ Founded in 1924 * offices in Hamm and Munster ¢ Providing services for communes and companies * national and international clients Kanzli des Jahres fir Umwelt: und Planungsrecht www.legal500.de
Slide 3: Wolter Hoppenberg practice areas
Employment Public law Procurement International WoLter > HoprpeNBERG Building and Real Estate Energy Insurance Agriculture and Hunting Notary Planing Insurance Agents Corporate and Tax
Slide 4: Background
Background More and more wind energy plants have to be constructed in Germany. Those plants reach altitudes up to 200 meters above the ground. Radio links could be interfered. Quelle: Fachagentur Windenergie 4
Slide 5: Legal Framework
Legal Framework • Before operating a radio link in Germany the frequency allocation is necessary • Responsible for the frequency allocation is the Bundesnetzagentur • The Bundesnetzagentur has all informations about the existing radio links in Germany • The Bundesnetzagentur will be involved in ever
Slide 6: Legal Framework
Legal Framework • For constructing wind energy plants in the undeveloped outskirt area section 35 of the Federal Building code has to be respected • A conflict with public interests exists in particular where the development project interfer with the reliability of a radio system or a radar unit • A
Slide 7: Technical Framework - Example
Technical Framework - Example Quelle: Prof. Dr.-Ing. Werner Wiesbeck 7
Slide 8: Technical Framework - Example
Technical Framework - Example 8 Quelle: Prof. Dr.-Ing. Werner Wiesbeck
Slide 9: Technical Framework – Possible Interferences
Technical Framework – Possible Interferences • Shadowing effects of the rotor blade or the tower Quelle: Prof. Dr.-Ing. Werner Wiesbeck 9
Slide 10: Technical Framework – Possible Interferences
Technical Framework – Possible Interferences • Interference through reflexions at rotor blades and tower Quelle: Prof. Dr.-Ing. Werner Wiesbeck • Interference through doppler features 10
Slide 11: Interference through cross polarisation
Interference through cross polarisation • radio links are operated with two linear orthogonal polarisations using the same frequency Quelle: Prof. Dr.-Ing. Werner Wiesbeck • The wind energy plant cause reflexions and diffractions • This reflexions and diffractions can influence the polarisation 11
Slide 12: Summary
Summary • In Germany private operated radio links are legaly protected • A sucessfull claim requires evidence of an interference of the radio link caused by the wind energy plant • The requirements for this evidence are sophisticated • The prediction of an interference of the radio link caused by th
Slide 13: New service to protect radio links
New service to protect radio links • LS Telcom and Wolter Hoppenberg togehter offer a new service for operators to protect their radio links • In every administrative procedure for a wind energy plant, that should be constructed close to an existing radio link LS Telcom will verify if the planed win
Slide 14: The legal protection of mobile radio technology
The legal protection of mobile radio technology Peer Kollecker Lawyer and Specialist lawyer for administrative law Wolter Hoppenberg Rechtsanwälte Partnerschaft mbB Münsterstr. 1-3, 59065 Hamm Tel.: 0 23 81 / 9 21 22-424 Fax: 0 23 81 / 9 21 22-7022 kollecker@wolter-hoppenberg.de www.wolter-hoppenber