Aksa Enerji Uretim A.s. · BIST:AKSEN

Aksa Enerji Uretim A.s — Investor Presentation (September 2014)

38 slides from Aksa Enerji Uretim A.s's investor presentation, Sep 5, 2014

  1. Slide 1: Aksa Enerji: The leading IPP in Turkey

    Aksa Enerji The leading IPP in Turkey Investor Presentation 5 September 2014

  2. Slide 2: Disclaimer

    Disclaimer Aksa Enerji Üretim A.Ş. ("Aksa Enerji") has prepared this presentation material (the “Document”) for the sole purpose of providing information, which includes opinions and estimates and certain forward looking projections and statements relating to Aksa Enerji, the Turkish electricity mar

  3. Slide 3: Key investment highlights

    Key investment highlights 1 Part of a dedicated energy group 2 Second largest Independent Power Producer (IPP) in Turkey 3 Strong exposure to growing Turkish electricity market 4 Large portfolio with 19 operational assets totalling 2,127 MW 5 Diversified pipeline of 22 projects adding 2,058 MW to ou

  4. Slide 4: We are part of a dedicated energy group

    We are part of a dedicated energy group  Entered energy business in 1960s with the production of generating sets  Focused only on the energy sector since then  Gradually expanded into main segments of electricity & natural gas Kazancı Group  Excellent track record in building and integrating ene

  5. Slide 5: We are the second largest IPP in Turkey with 2,127MW installed capacity

    We are the second largest IPP in Turkey with 2,127MW installed capacity IPPs by Installed Capacity 2.798 2,127 1.605 1.585 1.490 1.416 (MW) 952 826 410 365 Enerjisa Aksa Enerji İÇDAŞ Limak Eren Enerji Akenerji Cengiz Zorlu Enerji Bis Enerji AES Entek Source: Information obtained from each IPP’s annu

  6. Slide 6: We provide strong exposure to the growing Turkish electricity market

    We provide strong exposure to the growing Turkish electricity market 1 Strong Electricity Demand Growth (1) 2 Increasing per Capita Consumption (2) 500 TWh High CAGR – High Demand: 8.4% MWh/pa 450 467 Demand Scenario 9 400 CAGR – Low Demand: 7.1% Low 425 8 350 Demand Scenario 7 300 245 6 250 CAGR: 5

  7. Slide 7: We have 19 assets under operation across Turkey

    We have 19 assets under operation across Turkey 17 KIYIKÖY 24 MW 1 2 3 AYVACIK AYRES ÇORUM-İNCESU SAMSUN 5 MW 15 MW 131 MW AKKÖY 19 13 MW 4 VAN 16 115 MW BALIKESİR KAPIDAĞ 24 MW 15 BALIKESIR ŞAMLI 114 MW Total 2,127 MW 14 MANISA KARAKURT 11 MW 13 MANISA 115 MW 18 SİİRT 24 MW 12 ANTALYA ŞIRNAK 5 1,15

  8. Slide 8: Each of our assets has key specifications to fortify our strategy

    Each of our assets has key specifications to fortify our strategy A D Baseload Natural Gas Fired PP – Antalya Wind Farms  Located in a favorable wind corridor with high load factors  One of the most efficient CCGT plants in Turkey, with  7 farms, with a total capacity a capacity of 1,150 MW with

  9. Slide 9: We have a diversified pipeline of projects adding 2,095 MW to our portfolio

    We have a diversified pipeline of 24 projects adding 2,095 MW to our portfolio Installed Pipeline Capacity 438 MW 2,095 MW 1,153 MW Hydro 15 projects 698 MW Wind 62 MW 5 projects Lignite 1 project 270 MW 467 MW Natural Gas 2 projects 1,041 MW 37 MW 2,052 MW Fuel-oil 1 project 24 MW (1) 2 6 7 8 23 2

  10. Slide 10: We target to reach 3,747 MW by 2017

    We target to reach 3,747 MW by 2017 and create significant cost improvement with our renewables and lignite fired PP pipeline Targeted Capacity Increases in Renewables & Lignite (MW) MW 10% 18% 22% MWh (+) 247 MW Hydro 900 4000 Further (+) 13 MW Hydro (already oper.) 800 3500 pipeline of 185 (+) 62

  11. Slide 11: We are utilizing our own generation as well as sourcing capabilities to supply our customers

    We are utilizing our own generation as well as sourcing capabilities to supply our customers Cost Structure (1H 2014) Improving Lower Cost Output TL/MWh % of 320 304 Renewables 15% 19% 33 &Sourcing 280 Average Cost: 134 4,756 GWh 240 4,139 GWh 200 160 157 3 270 120 80 80 154 36 40 80 70 36 0 351,6 N

  12. Slide 12: Our sales mix is getting more diversified and secure

    Our sales mix is getting more diversified and secure, increasing our capacity utilization Capacity Utilization 44% 58% TWh 4.76TWh Balancing Market Northern Cyprus 4 Sales Wholesale Bilateral 1.01 BSM 21% to BSM Retail Bilateral 4.2 TWh 2 Total 3.74 Contracted 79% 86% BSM 3.6 Contracted Sales 14% Co

  13. Slide 13: Shifting bilateral mix towards more profitable commercial clients

    At the same time, we are shifting bilateral mix towards more profitable commercial clients Increasing Contracted Volume Supported by Evolution of Eligibility Limit Affiliated Distribution Regions 40x 2003 2004 2004 2004 2004 2004 2004 2004 2004 2004 2013 2014 2015 # of Bilateral Customers (2) 245 61

  14. Slide 14: We have increased efficiencies of our CCGT plants and cut opex

    We have successfully increased efficiencies of our CCGT plants and managed to cut our opex to improve our cost base 1 Low Unit Capex 3 Improving Fuel Efficiency US$m/MW US$/MWh 95 312 305 287 403 60% CCGT 0,4 90 89 54% 55% (1) Lignite 1,3 83 50% 76 Wind 1,4 77 74 70 71 44% Hydro 2,2 41% 65 40% 0,0 0

  15. Slide 15: Tailored strategy to create sound and secure profitability

    Tailored strategy to create sound and secure profitability Evolution of Capacity and Sales Mix Sales Mix Total Contracted (1) Total Contracted (1) 3,747 MW 14% 29% Lignite Shifting strategy Fortify baseload to become baseload strategy & build cost Hydro producer 71% effective pipeline Wind Total Spo

  16. Slide 16: 1H 2014

    1H 2014

  17. Slide 17: 1H 2014 Results- Snap Shot

    1H 2014 Results- Snap Shot * YoY YoY YoY 2012 2013 Change Q2 2013 Q2 2014 Change 1H 2013 1H 2014 Change Installed Capacity (MW) 2.045 2.052 7 MW 2.048 2.066 18 MW 2.048 2.066 18 MW Sales Volume (GWh) 9.784 9.109 -7% 2.174 2.298 6% 4.139 4.756 15% Capacity Utilization Rate (CUR) 60% 56% -4pp 54% 56%

  18. Slide 18: Market Highlights

    Market Highlights ►Electricity generation increased by 4% YoY in 1H14 but down by 2% QoQ. ►Ytd (8M), electricity generation was up by 5.1% YoY. ►Electricity consumption in 1H14 was parallel to electricity generation and increased by 4% YoY as well. Similar to generation, it was down 2% QoQ. ►Ytd (8M

  19. Slide 19: Market Highlights

    Market Highlights Generation by type 1H13 vs 1H14 Wind 3% Fuel-Oil Hydro 2% 18% Wind Fuel-Oil Lignite & Coal 3% 2% 29% Others Hydro 1% 28% Lignite & Coal 24% Others 1% Natural gas 42% Natural gas Inner circle: 1H 2013 47% Outer Circle: 1H 2014 ►Source of electricity generation 1H14 changed due to dr

  20. Slide 20: Market Highlights

    Market Highlights ►Total installed capacity in Turkey has increased by 2,625 MW in 1H14 to 66,633 MW, with the majority coming in from natural gas and hydro. This is an additional 4% installed capacity on top of the YE2013 figure. ►Ytd (8M), a total of 4,218 MW capacity came online taking the total

  21. Slide 21: Market Highlights

    Market Highlights Weighted Average Price (TL) ►Prices – Average prices have gone up by 7% 170 162 166 165 160 Yoy in 2Q14 due to the draught in Turkey 160 157 155 preventing a significant contribution from the 147 150 146 hydroelectric power plants. 145 140 ►However the prices are 2% weaker 135 1Q13

  22. Slide 22: Company Highlights

    Company Highlights ► At the end of Q1, we have introduced to the market a new concept of tariffs leading the sector in a new path of «price innovation». ► In 1H14, net sales of the Company has increased by 15% YoY from 4,139 GWh to 4,756 GWh due to the increased percentage of bilateral agreements in

  23. Slide 23: Company Highlights

    Company Highlights ► Kıyıköy WPP’s provisional ministry acceptance was completed on 12 August 2014, whereby 24MW was added to the generation portfolio. ► Akköy HPP’s (13MW) transfer to Aksa Enerji from Kazancı Holding was approved by EMRA at the end of August. ► With the additions of Kıyıköy and Akk

  24. Slide 24: Company Highlights

    Company Highlights ► The construction of Bolu/Göynük lignite fired power plant, which started on 13 July 2012, continues as planned. This plant will have an installed capacity of 270MW and the first phase, 135MW, is expected to be operational in December 2014. The second phase, 135MW, is planned to

  25. Slide 25: Company Strategy Going Forward

    Company Strategy Going Forward ► The company’s strategy is to increase its local and renewable resources within its production portfolio to decrease its cost base. ► To this end, we are more focused on creating new greenfield lignite fired power plant projects. We are in disccussion about the acquis

  26. Slide 26: Catalysts and Key Events- Bolu Göynük Lignite PP

    Catalysts and Key Events- Bolu Göynük Lignite PP 1st Phase Near Completion ► An installed capacity of 270MW ► SES CFB boilers & Skoda turbines ► 1st phase, 135MW, to be operational in December 2014. ► 2nd phase, 135MW, to be operational in 1Q 2015. ► CAPEX: $350mn ► Annual production volume of 2bn K

  27. Slide 27: Catalysts and Key Events- Bolu Göynük Lignite PP

    Catalysts and Key Events- Bolu Göynük Lignite PP ► On-site lignite mine ► Open pit ► Owned and operated by Aksa Enerji ► Sufficient supply of coal for the life time of the lignite PP ► Calorific value: 2400 kcal/ton ► Mine being operated for the last 5 yrs ► Coal being stored now for first fire 26

  28. Slide 28: Financial highlights 1H 2014 Consolidated income statement

    Financial highlights 1H 2014 Consolidated income statement Net sales & EBITDA (TL mn) 472 910 438 EBITDA Margin EBITDA Margin 1Q14: 15.5% 792 1H13: 16.1% 2Q14: 12.5% 1H14: 14.0% 73 55 127 128 Net Sales EBITDA Net Sales EBITDA 1Q14 2Q14 1H13 1H14 Operating income & Net income (TL mn) 46 44 75 69 25 3

  29. Slide 29: Net financial debt and repayment schedule

    Financial highlights 1H 2014 Net financial debt and repayment schedule Net financial debt (TL mn) 1.800 64% 61% 1.557 1.600 62% 1.400 1.270 1.280 1.306 59% 60% 1.138 1.200 58% 1.000 55% 55% 56% 800 54% 52% 600 52% 400 50% 200 48% - 46% 2010 2011 2012 2013 1H14 6.0 4.2 4.0 4.2 5.0 Net Financial Debt

  30. Slide 30: Financial Highlights 1H 2014

    Financial Highlights 1H 2014

  31. Slide 31: Consolidated income statement

    Consolidated income statement (TLm) 2010 2011 2012 2013 Q1 2014 Q2 2014 Net sales 911,9 1315,4 1840,6 1786,0 472,1 438,2 Cost of sales -775,5 -1088,0 -1604,0 -1565,9 -423,5 -408,0 Gross profit 136,4 227,4 236,6 220,1 48,6 30,3 Gross profit margin 15% 17% 13% 12% 10% 7% General & administrative costs

  32. Slide 32: Consolidated balance sheet

    Consolidated balance sheet (TL mn) Assets 2010 2011 2012 2013 1H 2013 1H 2014 Cash and cash equivalents 78,3 110,5 40,6 22,3 29,1 19,6 Trade receivables net 113,0 261,5 245,9 142,3 284,8 133,7 Due from related parties and shareholders 607,9 360,0 593,9 0,0 4,9 0,0 Inventory 81,3 121,5 135,5 250,0 17

  33. Slide 33: Consolidated statement of cash flows

    Consolidated statement of cash flows (TLmn) 2010 2011 2012 2013 1H2013 1H 2014 Net income (loss) before tax 84,7 -116,5 226,5 -156,1 -51,8 37,6 Depreciation and amortisation 71,7 92,5 105,3 111,8 52,5 59,2 Other adjustments 14,7 231,2 -53,1 193,9 83,9 -7,7 Change in w orking capital 18,64 -20,3 -189

  34. Slide 34: Appendix

    Appendix

  35. Slide 35: Operating (Current)

    Operating (Current) Power Plant License Owner Fuel Type Installed Capacity (MW) Mardin-1 Aksa Energy Fuel-oil 32 Mardin-2 Rasa Elektrik Fuel-oil 33 Northern Cyprus Aksa Cyprus Fuel-oil 120 İdil (Şırnak) İdil İki Energy Fuel-oil 24 Siirt Siirt Akköy Fuel-oil 24 Total Fuel-Oil fired power plants 233 1

  36. Slide 36: Ongoing Investments and Revised Licence Portfolio

    Ongoing Investments and Revised Licence Portfolio Planned Acquisitions from Kazancı Holding Power Plant Investment License Owner Fuel Type Additional Capacity (MW) Completion Year  Planned acquisitions from Kazancı Holding Datça Licenced Kazancı Holding Wind 12 2015  Datça 12 MW wind farm licence

  37. Slide 37: Turkish power market

    Turkish power market Installed Capacity by Fuel Annual Installed Capacity Increases GW CAGR GW 23.2 70 64.0 9.4% 18 57.1 16 60 52.9 49.5 14 11.5 44.8 25,0 12.9% 52% 50 41.8 39% 12 22,0 19,0 40 17,2 10 34% 15,4 6.8 14,2 8 30 4.7 4.3 6 3.4 11.7 2.9 20 39,0 7.4% 4 3.0 48% 33,9 35,0 1,8 29,3 32,3 1.0 3,

  38. Slide 38: Contact- Investor Relations

    Contact- Investor Relations Özlem McCann IR Manager Ozlem.McCann@aksa.com.tr +90 216 681 1053 Rüzgarlıbahçe Mah. Selvi Çıkmazı No:10 Kavacık Beykoz, Istanbul 37

Aksa Enerji Üretim A.Ş. — Investor Presentation (September 2014) on 6ix