Nexmetals Mining Corp. · TSXV:NEXM

Nexmetals Mining — Investor Presentation (April 2026)

25 slides from Nexmetals Mining's investor presentation, Apr 27, 2026

  1. Slide 1: Redeveloping a District-Scale Critical Metals Camp

    REDEVELOPING A DISTRICT-SCALE CRITICAL METALS CAMP nexmetalsmining.com APRIL 2026 | INVESTOR PRESENTATION

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS This presentation (the “Presentation”) is to be used by the recipient for informational purposes only and does not purport to be complete or contain all of the information that may be material to the current or future business, operations, financi

  3. Slide 3: Important Cautionary and Other Information

    IMPORTANT CAUTIONARY AND OTHER INFORMATION Caution Regarding Historic Data Certain scientific and technical information in this Presentation, including historic data compilation at the Selebi and Selkirk projects, are historic in nature. Reference should be made to the full text of the Selebi Techni

  4. Slide 4: Click on image to view site overview video

    Click on image to view site overview video

  5. Slide 5: Scalable Growth in Mining-Friendly Botswana

    SCALABLE GROWTH IN MINING-FRIENDLY BOTSWANA PAST-PRODUCING & PERMITTED Cu-Ni-Co-PGE MINES Selebi: 3.0 Mt @ 2.92% CuEq (Ind) and 24.7 Mt @ 3.40% CuEq (Inf)1 Selkirk: 44.2 Mt @ 0.81% CuEq (Inf) 2 CLEAR UPSIDE TO SCALE Step-out drilling and emerging Flexure Zone point to meaningful resource growth pote

  6. Slide 6: Africa's Most Attractive Mining Jurisdiction

    BOTSWANA AFRICA’S MOST ATTRACTIVE MINING JURISDICTION #1 IN AFRICA, #7 GLOBALLY — FRASER INSTITUTE (2025) LOW RISK JURISDICTION Long history of rule-of-law, competitive tax rates, no foreign exchange restrictions, and no required government free carry. STABLE POLITICAL ENVIRONMENT Botswana has long

  7. Slide 7: A Foundation Decades in the Making

    BUILDING NEXMETALS A FOUNDATION DECADES IN THE MAKING MINE HISTORY 1970s 1980s 1989 2015 2016 2017 Discovery & Selebi underground Selkirk underground BCL smelter Ceases all BCL liquidation development by production production begins failure production BCL begins NEXMETALS ERA Established Path to 202

  8. Slide 8: Selebi Mines

    SELEBI MINES • Single mining license covering 115 km² • Ortho-magmatic nickel-copper sulphide- type deposits • Historic cumulative production of: Selebi Main (1980 – 2016): ≈ 26 Mt mined Selebi North (1990 – 2016): ≈ 14 Mt mined • Current focus is expanding an already large resource

  9. Slide 9: Data-Driven Modeling and Drilling Confirm Expansion Potential

    SELEBI MINES DATA-DRIVEN MODELING AND DRILLING CONFIRM EXPANSION POTENTIAL BEYOND THE 2024 MRE ACROSS BOTH DEPOSITS • Multiple untested borehole electromagnetic (BHEM) conductors and infill drilling highlight significant growth potential • 2025 underground and surface drilling programs confirmed min

  10. Slide 10: Surface Drilling Advances the Flexure Zone

    SELEBI MAIN SURFACE DRILLING ADVANCES THE FLEXURE ZONE AS KEY DRIVER OF POTENTIAL RESOURCE GROWTH FOUR DRILL RIGS ARE CURRENTLY ACTIVE WITH A FIFTH RIG BEING ADDED • ~30,000 metre ongoing, leveraging 2025 drilling and BHEM results • Priority targeting focused on the emerging Flexure Zone Highlight I

  11. Slide 11: Underground Drilling Confirms Scale and Continuity

    SELEBI NORTH UNDERGROUND DRILLING CONFIRMS SCALE AND CONTINUITY ~315 METRES BEYOND THE 2024 MRE Highlight Intercepts Beyond the 2024 MRE Boundary • 9,656m completed in 11 Hole ID Length (m) CuEq% completed holes and 6 SNUG-24-114 21.30 4.14 including 13.80 4.40 abandoned holes SNUG-24-129 7.20 7.24

  12. Slide 12: Selebi Mines Metallurgical Breakthrough

    SELEBI MINES SELEBI MINES METALLURGICAL BREAKTHROUGH UNLOCKING ABILITY TO PRODUCE SEPARATE HIGH-GRADE SALEABLE COPPER & NICKEL-COBALT CONCENTRATES KEY POINTS: BULK SAMPLES – REAL WORLD TEST MATERIAL • Largest underground bulk sample from Selebi Mines with representative material selected for STRATEG

  13. Slide 13: Selkirk Mines

    SELKIRK MINES • Mining license spans ~14.6 km², with an additional 126.7 km² across four surrounding prospecting licenses • Historical production by Tati Nickel Mining Company: ~1 Mt at 1.5% Cu and 2.6% Ni (1989–2002) • Shallow, laterally extensive mineralization supports open-pit development potent

  14. Slide 14: Open-Pit Potential with Significant PGE Exposure

    SELKIRK OPEN-PIT POTENTIAL WITH SIGNIFICANT PGE EXPOSURE • 34-hole resampling program complete; results confirm thick, consistent mineralization (e.g., DSLK211: 180.8 m @ 1.31% CuEq) • High-grade footwall zones identified, adding exploration potential • New PGEs analyses have potential for meaningfu

  15. Slide 15: Selkirk Mine Metallurgical Breakthrough

    SELKIRK SELKIRK MINE METALLURGICAL BREAKTHROUGH RESULT CONFIRM SEPARATE HIGH-GRADE SALEABLE COPPER & NICKEL-PGE CONCENTRATES AND IMPROVED RECOVERIES VALIDATED PROCESSING PATHWAY • Initial Locked Cycle Tests confirm ability to produce separate copper and nickel 2026 Blue Coast Research with Large Dia

  16. Slide 16: Positioned for Value Realization in 2026

    UPCOMING CATALYSTS POSITIONED FOR VALUE REALIZATION IN 2026 DATA DRIVEN ECONOMIC MODELING RESOURCE GROWTH OPTIMIZATION UNLOCKING DISTRICT SCALE UPSIDE 2026 SELEBI SELKIRK  Completion of • Updated MRE  Completion of 34-hole • Updated MRE underground drilling at • PEA resampling program Selebi North

  17. Slide 17: Clear Path to Re-Rate

    VALUE PROPOSITION CLEAR PATH TO RE-RATE $4,000 $3,800 Market Capitalization $1,600 (CAD$M)5 $2,000 ACQUIRED4 $1,300 $618 $116 $0 Foran Firefly Talon Magna NexMetals NexMetals ~90% discount to peers on an EV/Resource $2.00 Median: EV/Resource basis, despite (US$ / lb)3 $1.10 $0.37/lb comparable funda

  18. Slide 18: Management

    EXPERIENCED DISCOVERY FOCUSED OPERATORS MANAGEMENT Sean Whiteford Brett MacKay CEO & Director CFO & SVP Finance • 30+ years in global mining, with multi-commodity • 18 years in mining finance, including expertise across exploration, mining, and project studies. senior roles at Lundin Mining • Held s

  19. Slide 19: Board of Directors

    TRUSTED AND EXPERIENCED BOARD OF DIRECTORS Paul Martin Sean Whiteford Chris Leavy CEO & DIRECTOR 20 years of asset management and CHAIRMAN investment leadership, including 30+ years of global mining expertise CIO roles at Oppenheimer Funds Over 30 years of executive leadership and BlackRock. across

  20. Slide 20: Capital Structure

    CAPITAL STRUCTURE CAPITAL STRUCTURE TOP SHAREHOLDERS* Share Price (April 17, 2026) $3.25 Basic Shares Outstanding 35,648,164 Other Institutions Warrants 9,428,996 21.3% Tradeable Warrants1 14,035,100 Management Options 876,171 3.7% RSUs 487,640 DSUs 90,887 Preferred Shares 657 Retail 2.1% 45.5% FD S

  21. Slide 21: The Next Major Critical Metals Player

    THE NEXT MAJOR CRITICAL METALS PLAYER PERMITTED & PROVEN: EXPLORATION UPSIDE: TIER-ONE JURISDICTION: BUILT-IN ADVANTAGE: Past-producing Cu-Ni-Co-PGE Untested EM plates along 2 km Botswana – safe, stable, mining- Two shafts, grid power, water, rail Mines corridor between and below Selebi friendly. Es

  22. Slide 22: ESG Commitment & Impact

    ESG COMMITMENT & We are committed to a sustainable future, aligning with ESG principles to drive economic prosperity, protect the environment, IMPACT and enrich our communities. Advancing responsible mining, promoting innovation, and ensuring a brighter future for Botswana and its people. Economic P

  23. Slide 23: Contact Us

    Contact Us Phone +1 866-NEXM (6396) Email info@nexmetalsmining.com TSX-V: NEXM | NAS DAQ: NEXM 23

  24. Slide 24: Initial NI 43-101 Mineral Resource Estimate on the Selebi Mine

    EFFECTIVE DATE: JUNE 30, 2024 INITIAL NI 43-101 MINERAL RESOURCE ESTIMATE ON THE SELEBI MINE Classification Tonnage Grade Contained Metal Deposit Mt % Cu % Ni kt Cu kt Ni Selebi North 3.0 0.90 0.98 27 29 Indicated Total 3.0 0.90 0.98 27 29 Selebi Main 18.9 1.69 0.88 319 165 Inferred Selebi North 5.8

  25. Slide 25: Initial NI 43-101 Mineral Resource Estimate on the Selkirk Mine

    EFFECTIVE DATE: NOVEMBER 1, 2024 INITIAL NI 43-101 MINERAL RESOURCE ESTIMATE ON THE SELKIRK MINE Grade Contained Metal Classification Tonnage (Mt) Cu % Ni % Pd g/t Pt g/t CuEq* % Cu kt Ni kt Pd koz Pt koz Inferred 44.2 0.30 0.24 0.55 0.12 0.81 132 108 775 174 *CuEq% calculated using the formula Cu%

NexMetals Mining — Investor Presentation (April 2026) on 6ix