Continental Resources — Investor Day (October 2010)
16 slides from Continental Resources's investor day presentation, Oct 12, 2010
Slide 1: Niobrara: Expanding Rockies Oil Resource
Niobrara: Expanding Rockies Oil Resource Widespread hydrocarbon source and reservoir rock across the Rockies History of conventional production in Rockies basins • Up to 12MMBoe fields dating back to 1957 • Up to 1.5 MMBoe/well • Natural fracturing key to conventional production • Wattenberg Field:
Slide 2: Niobrara Depositional Environment
Niobrara Depositional Environment Niobrara was deposited in ancient Cretaceous seaway 85 million years ago Organic shales throughout (source rock) East side: Higher carbonate content West side: Higher clay content Niobrara preserved in present-day basins Source: USGS 2005
Slide 3: DJ Basin: 1st Niobrara Basin to Take Off
DJ Basin : 1 st Niobrara Basin to Take Off ~5MM acres in thermally mature fairway 4 Billion Boe potential recoverable reserves • 320-acre spacing, 286 MBoe EUR per well (unrisked) 12 horizontal rigs drilling • 10 reported hz producers since June ‘09 • 27 hz wells completing • 90 permits in the last
Slide 4: Stratigraphic
STRATIGRAPHIC Continental
Slide 5: Continental's Niobrara Acreage
Continental’s Niobrara Acreage CLR leasehold Niobrara horizontal permit Niobrara horizontal well WOC Niobrara horizontal producer Niobrara horizontal rig drilling CLR Pump House Project Area 100 miles Wattenberg Field Silo Field 73,000 net acres in Niobrara • 28% Colorado • 72% Wyoming 228 net poten
Slide 6: Jo t2N ssw, tana
Jo t2N ssw, tana ‘ae Bh i ee , ote: Aen “tna ‘ ‘ oy era nee ory Baers a Bey Geeta Ber a oe ee re ‘ an eo ‘esueow Weld eNesw | eNEBW ae ENG Dmeeo 4 Continental
Slide 7: ee
ee
Slide 8: Pump House Project: Weld Co., Colorado
Pump House Project: Weld Co., Colorado Hereford Field Wattenberg Field NBL NBL NBL NBL CLR leasehold Niobrara horizontal permit Niobrara horizontal well WOC Niobrara horizontal producer Niobrara horizontal rig drilling A A’ Pump House Project CLR: Newton 1-9H 36 miles 14,400 net acres Located in the
Slide 9: Continental
r Continental
Slide 10: Common Early Stage Questions
Common Early Stage Questions Fracture or matrix production? • Conventional wells in resource plays have typically required natural fracturing for commercial production. • Niobrara displays both fracture and matrix production (Silo Field). • Technology taps into matrix Continuous reservoir? • General
Slide 11: Fracture and Matrix Production
Fracture and Matrix Production 0.1 0.5 CV.Cum_oil ( Mbbl ) S G MCCONNAUGHEY 1 Cumulative oil production (MBo) Silo Field Vertical Well Matrix production 8 MBo Fracture production 8 MBo
Slide 12: Fracture and Matrix Production
Fracture and Matrix Production CV.Cum_oil ( Mbbl ) SWEETWATER 41-17 1H Matrix production 40 MBo Fracture production 100 MBo Silo Field Horizontal Well Cumulative oil production (MBo)
Slide 13: Rate-Time Plot, Horizontal Well
Rate-Time Plot, Horizontal Well
Slide 14: Rate-Time Plots for 1,280- and 640-Spaced Wells
MBoe Per Month 100 w O48 Rate-Time Plots for 1,280- and 640-Spaced Wells 60 qa 180 240 Month smumbighrara 286 MBOE Model ommdfigbrara 572 MBOE Mod 300 360 Continental
Slide 15: Niobrara Economic Models
Niobrara Economic Models Rates of Return % * Economics net of $7 differential. 1,280 Spacing Model CWC: $6.2MM EUR: 572 MBoe 640 Spacing Model CWC: $4.2MM EUR: 286 MBoe
Slide 16: Continental
Continental