Slide 1: Strategic Location for Gold-Copper, James Bay, Quebec
Dios Exploration Tsx-V DOS STRATEGIC LOCATION FOR GOLD-COPPER JAMES BAY, QUEBEC, CANADA LOWER & UPPER EASTMAIN GREENSTONE BELTS & MAJOR STRUCTURES DRILLING K2 IN MID-AUGUST ADJACENT WSW OF AZM ELMER PROPERTY MARIE-JOSÉ GIRARD, P. Geo M.Sc. PRESIDENT & CEO July, 2021
Slide 2: Dios James Bay Gold Projects
309000 320900 34000360000 389000 «400000 420000 aaqoon — 4000480000 DIOS EXPLORATION Dios James Bay Gold Projects Gold Occurence (Au git) = >1.000 0.500 - 0.989 Ef [] opinaca Metasediments Geology Felsic Volcanics HEB Matic volcanics 3 EB cabbro Eastmain |: 13 BEI ron Formation F is Ck ter |Anatacau
Slide 3: Working Capital
Dios Exploration Tsx-V DOS WORKING CAPITAL As of March 31, 2021 1.4116 M $ 101 207 067 shares outstanding Wholly-Owned K2 gold-Cu-Ag WSW of Elmer, Au33, Clarkie, 14K No Royalties 33Carats north of Eastmain Gold mine optioned to Australian Cie Contiguous to Benz Mining new conductors 2.5 km north of
Slide 4: Dios Exploration Tsx-V DOS
Dios Exploration Tsx-V DOS
Slide 5: Capital Structure shares outstanding
Dios Exploration Tsx-V DOS CAPITAL STRUCTURE 101 207 067 shares outstanding No Restructures 3,895M options @ $0.11 1.95 can be exercised @ $0.11 9 M warrants @ $0.20 Market Cap 10.63-12 M $ Tight share structure
Slide 6: Capital Structure
Dios Exploration Tsx-V DOS CAPITAL STRUCTURE Management 10% Fully diluted 13.8% apart from family-friends PALISADES GOLDCORP 6.2% Fully diluted 9.9% CAISSE DE DÉPÔT QC 5% DESJARDINS CAPITAL 2.15% SIDEX 4.2% FSTQ 2.8% SDBJ 2% NIOBEC 3.4% MAPLELEAF 2.5 % FT SPROTT ASSET 3% FT
Slide 7: August 27, 2020
Dios Exploration Tsx-V DOS AUGUST 27, 2020
Slide 8: Dios exploration map with geology and structures
295000 309000 305000 319000 315000 329000 325000 DIOS EXP ORATION Gold Occurence (Au git) gag» 5819000 = 010499 0.0.09 g Tre w target ‘Structures — Opinaca Fault 5805000 — 2 Kali High Mag Anomaly 3 Geology |S Sedimentary 3 HEE tron Formations Intrusive DS auartz Porphyry | Diorite 1) Tonalite-Granod
Slide 9: Exploration: K2 Gold Project
EXPLORATION K2 Gold Project Outcrop gold compilation Au_ppm a 1,000 - 10.000 E> 7 7 4 r a +: a : Sesame Targetige a ™ 0.500 - 0.999 jo 2 ‘ q - cuma Shear Target} Pe H eae . 0.100 - 0.499 . 0.025 - 0.099 x 0.000 - 0.024 Boulder gold compilation Au_ppm @ 1,000 - 6,7200 e 0,500 - 0,9999 © ——_0,1000 - 0
Slide 10: K2 drill targets and 2020 drill holes
300000 300500 301000 301500 302000 302500 303000 303500 304000 304500 305000 305500 . Z <i — aoe e DIOS y K2 - WI target @ = —2_2020_DDH a K2_2020 DDH trace 3 K2_Soil_Compilation 5797500 A 5-283 9-50 3 aoe 2 K2_Outcrop_Compilation 3 Au_ppm s 1-10 8 @ Z % m HM 05-099 | K2-20-03 - inc. 0,469 gttm mB 0
Slide 11: Solo Gold Project soil anomalies
310000 311000 313000 314000 315000 579500¢ 579500¢ @22 ie WA 4 WA [Opinaca Fault Solo Gold Project Soil (B-Horizon) Anomalies Cu_ppb 130-450 0-129 5794000 ‘Soil (B-Horizon) Anomalies Au_ppb P11 . 7@42mvivV 10 9-780 2 0-8 Barrick_1997_Gold in Humus ‘Au__ppb_ ae ee —— @ P.07 4 + 08 7@ 130 mVV Bartick_
Slide 12: IP chargeability anomalies
) f oF oF go: es 5 © 5 £ § @ € Rog =F 8 i: 4 os 4 a : 8 NL 5 3 sof Shop fo aoe hy Chargeability uaceanisne ™S malliviotis (Voter DIOS ~ HE > 20m EXPLORATION Seay 15-20mvv PER 3 “ = NN : 5 5-18mvr ™ i ( <smv
Slide 13: K2/Solo Gold Project
CT ae Pee ? P.07 - i : ey | [P05 Felsic Volcanic Dome Diorite Volcanic QNWwa3) 3 Sedimentary 1) Tonalite-Granodiorite Rhyolite GAV3") SHE 00 Formations Tonalite Felsic Volcanics/Tutt Intermediate Ti {5 Intrusive (BBN cuartz-Feldspar Porphyry EINE Felsic Tut HI Ancesite Quartz Porphyry J Gabbro Dacit
Slide 14: K2 Gold Project
307000 308000 K2 Gold Project @ = k2_2020_DDH_Final j}m$ 2 2020_DDH trace Qutcrop gold compilation ‘Au_ppm 1,000 - 10.000 BH 0500 - 0.999 = 0100-0499 = 0025 - 0.099 * — 9.000-0.024 Soil (B-Horizon) Cu (ppm) Anomalies A 130-450 0-129 Soll (B-Horizon) Anomalies ‘Au (ppb) & 9-760 40-8 Sericite Alterati
Slide 15: K2 Gold Project copper compilation
305000 306000 308000 2 = 5 K2 Gold Project Outcrop Compilation_Cu 201 ig Cu_% IB 1,000- 8,280 1B 0,500- 0,999 | 0,100- 0,499 0,050 - 0,099 % 0,000 - 0,049 3 — Property [3 —VLF Anomaly 5 (__Joz-ca-ci-py ateraton Zone =MAG High Anomaly © EM Inputs -— Structures, Faults [AsSericte Alteration Corridor Z
Slide 16: Windfall CARDS Gold Target over Dios's K2 Property
5805000 5800000 5795000 5790000 295000 305000 WINDFALL 4 CARDS Gold Target over Dios's K2 Property 300000 305000 310000 Elmer Discovery 2020! 310000 315000 320000 erro auiiiae | (upp Legend DIOS_K2_Property_Claims_2021 [J caros_cold_targets_Ageo_MTG Dios_CARDS_Ageo_Gold_MTG_3456.grd Similarity 100 %
Slide 17: CARDS Gold Target over Dios's K2 Property
5805000 5800000 5795000 5790000 CARD . 296000 300000 305000 310000 315000 320000 WINDFALL gend G E OTE K Pine iiieneyny 81 DIOS_K2_Property_Claims_2021 CARDS_Gold_Targets_Ageo_MTG 295000 09000 305000 ‘319900 7 CT ea ' - ce 4 | i> at Ls epee TT i we 4 Vind Vea 8 a f o33¢06 A eT Pk a #_0100-0400 ‘ «|
Slide 18: Clarkie Gold Project
Slide 19: Dios Au33 Gold Project
Dios Exploration Tsx-V DOS 412000 414000 416000 418000 420900 422000 424000 Dios Au33 Gold Project is 8 eS 5 Outcrop Sample Compilation Au (git) — Robino Breccia | Prone Seecch | = \37.6 @ 1.000 - 37.600 8 = 0.500 - 0.999 3 = 0.100 - 0.499 & = 0.025 - 0.099 ‘Au33W Property ~ Heberto Structure — Stru
Slide 20: Heberto Gold-Bearing Structural Corridor
DIOS EXPLORATION Heberto Gold-Bearing Structural Corridor N160° Dios Heberto TY Gold Project 2.53 gt Au /3.00m - .23 gt Au /3.70m .65 gt Au /8.10m 2017 DDH @ = 2015-2016 DDH HE Potassic-Altered Shears if Heberto Dioritic Dyke Heberto Zone 1.15 gt Au /64,00m inc. 3.65/13.00 Tonalite-Granodiorite 2.13
Slide 21: Au33 Gold Project soil compilation
Dios Exploration Tsx-V DOS 419000 421000 422000 423000 Au33 Gold Project 2 3 3 & Compilation soil AU33 Au_ppb A 20-269 A 8-19.99 2 0-7.99 3 § Structures 5 4 \ Chain Lake - = Chain Lake Mitsumis Pluton | “~ —— All'Season Road \e Ne 8 X 3 \ 2 Nene 5 \ Nes = 38 48 the 8 025 3 g 5 N 5 UTM NAD 83 Zone 18
Slide 22: AU33 WTS project
Dias Exploration Tsx- V DOS 419200 419600 419800 out 420200 420400 420600 AU33 WTS project 2019 Drill targets 38 — wrs_2019_pill lengh 5 @ WTS _2019_Diil Targets 863_B-Horizon 2019 Au_ppb A 20-269 & 8-19.99 4 0-7.99 == 863_E-NE structure = Chain Lake == All-Season Road == Au33W Property 0 0075 018 0
Slide 23: Dios Au33 Gold Project
WB Dios EXPLORATION Dios Au33 Gold Project Till Au (ppb) A 500-6530 & 100-499 4 0-99 ———— Gold-Bearing Corridor swem== Structures == Chain Lake —— All-Season Road 3 — ausaw Property “TS 5 io 8 0 125 25 5 Km [3 S UTM NAD 83 Zone 18 IS 33001 5 Author: Caroll Desormeaux P.Geo, Jr. Eng. Date: 29-07-2016
Slide 24: Clarkior Gold Project
461900 N \ Clarkior Gold Project Soil samples 2018 (in red) Au (ppb) A 8-17 a 5§-8 a 0-5 Outcrop samples Au (g/t) Au_ppm @ 1-888 1] 0.5-0.99 . 0.1 - 0.49 . 0.025 - 0.099 x 0-0.0249 Boulder samples Au (g/t) Au_ppm e 1-1,66 e 0,5 - 0,99 e 0,1 - 0,49 e 0,025 - 0,099 ° 0-0,0249 so Structures C) 12 48 a