Qpm Energy Limited · ASX:QPM
Qpm Energy — Merger or Acquisition (April 2023)
16 slides from Qpm Energy's merger presentation, Apr 5, 2023
Slide 1: Re-Energising Australia with Critical Battery Metals Production
Re-Energising Australia with Critical Battery Metals Production Moranbah Project Acquisition Dr Stephen Grocott & David Wrench Moranbah Project Presentation | April 2023 | ASX:QPM | www.qpmetals.com.au
Slide 2: Disclaimer
Disclaimer COMPANY DISCLAIMER: The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions in connection with any acquisition of securities, investors should rely on their own examination and consult thei
Slide 3: Acquisition of 100% of Moranbah Project
Acquisition of 100% of Moranbah Project Significant Reserves & Resources 240 PJ 2P Reserves + 269 PJ 2C Resources independently certified ~110 producing wells and associated gas gathering and water management infrastructure Mature Producing Asset In production since 2004 Current production o
Slide 4: Strategic Rationale
Strategic Rationale Security of Gas TECH Project requires ~14 PJ / annum at full production – existing reserves and resources underpin Reserves long term production De-risking Gas Supply Existing production and infrastructure capacity fast tracks delivery of gas to the TECH Project to ensure gas
Slide 5: Transaction Overview
Transaction Overview The acquisition of Moranbah Project is transformational for QPM in securing its energy requirements Vendors Subsidiaries of Arrow Energy (50%) and AGL (50%) QPM Energy (“QPME”) will acquire 100% of the Moranbah Project assets Consideration QPME will pay $5m to the vendors
Slide 6: Transaction Overview
Transaction Overview Transaction Commentary QPME believes it has been able to secure attractive pricing for the Moranbah Project because: o The asset is non-core to the vendors o QPM holds the key to unlocking the potential of the Moranbah Project with its baseload demand from the TECH Project o Q
Slide 7: Moranbah Project Location
Moranbah Project Location RE-ENERGISING NICKEL PRODUCTION Page | 7
Slide 8: Moranbah Project Infrastructure
Moranbah Project Infrastructure Illustrative Only – Not to Scale Townsville Central gas processing facility connected to the Power Station Nodal Station 3 Gas supply from PL191, PL486 & NQGP which has 108 TJ per day (39 PJ per Gas supply from PL191, Compression: 20TJ/d Teviot Brook Mine PL196, PL4
Slide 9: QPME Carbon Abatement Strategy
QPME Carbon Abatement Strategy Gathering Processing Gas Supply Transport Market Compression Upstream Midstream Energy Markets Southern Hub Dyno Nobel Moranbah Moranbah Moranbah Project Petroleum Leases Moranbah 5 coal mines Proc. + Comp. Other Facility TECH Project NQGP Townsville Power Stat
Slide 10: Moranbah Project – Capturing Waste Coal Mine Gas
Moranbah Project – Capturing Waste Coal Mine Gas Moranbah Project is an operating example of capturing waste mine gas and using it in a productive way Moranbah Project currently captures gas from: o Anglo American’s Grosvenor mine o Anglo American’s Teviot Brook mine o Anglo American’s Moranbah
Slide 11: Historical Gas Sales and Growth Opportunities
Historical Gas Sales and Growth Opportunities Historical Gas Sales Gas Sales Growth Opportunities Gas Sales (PJ) Improve operational efficiency of existing wells 14 Undertake commercial arrangements with regional coal mines to 12 12 capture additional waste gas 10.9 10.9 10.4 9.9 10.2 Drill ne
Slide 12: Moranbah Project Customers
Moranbah Project Customers Customer Project Sales Contract Comments Dyno Nobel Ammonium Nitrate 7 PJ per annum expiring Minimal utilisation of compressor / pipeline Plant (Moranbah) March 2026 infrastructure as the project is co-located Gas is used to generate electricity for sale into Queenslan
Slide 13: Incitec Pivot / Dyno Nobel
Incitec Pivot / Dyno Nobel QPM is in advanced negotiations with Incitec Pivot regarding a long term gas supply agreement and potential funding support to further develop the Moranbah Project Dyno Nobel - Moranbah Ammonium Nitrate Plant Principles of Discussion IPL subsidiary Dyno Nobel owns the
Slide 14: Ratch / Townsville Power Station Partnership
Ratch / Townsville Power Station Partnership Moranbah Project has a Dispatch Agreement with TPS for exclusive use to take gas and generate electricity Townsville Power Station Capacity Rights Electrical Generation / Operational Hours 242MW power station consisting of 160MW Siemens turbine and Tota
Slide 15: Electricity Market Pricing
Electricity Market Pricing Electricity Market 900 Daily Power Price Curve - QLD since 1 Jan 2022 Target operating Coal + gas price caps have led to recent 800 window assuming reduction in electricity price (10 Dec 2022) 700 15TJ/day gas Price ($/MWh) 600 supply (10 hrs 500 Recent AEMO warning (F
Slide 16: Moranbah Project Reserves and Resources
Moranbah Project Reserves and Resources Proved (1P) Proved + Probable (2P) Resources (2C) Petroleum Lease PJ PJ PJ PL191 121 188 192 PL196 9 10 32 PL223 28 32 13 PL224 10 11 32 Total 168 240 269 The estimated proved and probable reserves, evaluated as of 31 March 2022 contained within PLs 191, 196,