Slide 1: Hamilton Works Community Liaison Committee Meeting
Hamilton Works Community Liaison Committee Meeting December 2019
Slide 2: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Pilot Project Update: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements fo
Slide 3: Know Your Emergency Exits
Know Your Emergency Exits Review Evacuation Routes of the room you are located in
Slide 4: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Pilot Project Update: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements fo
Slide 5: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Pilot Project Update: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements fo
Slide 6: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Pilot Project Update: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements fo
Slide 7: Site-Specific Standard Order (Particulates): Performance Review – Daily
Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Sept 1- Nov 30, 2019 0 – 4.39% 0 – 1.58% 0 – 5.13% Range (0.42%)
Slide 8: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages
Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%
Slide 9: Performance Review – Daily Observations – Pushing Emissions
Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Sept 1- Nov 30, 2019 Range 0 – 43.33% (Average) (9.24%) Sept 1 – Nov. 30, 2019 Operationa
Slide 10: Site-Specific Standard Order (Particulates): Performance Review – Additional Items
Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were no community inquiries received during this period • MECP to provide verbal comments
Slide 11: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Pilot Project Update: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements fo
Slide 12: Pilot Project Update: Utilization of Bio-Carbon to Reduce Fossil Carbon Input
Pilot Project Update: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements for Coke Production December 2019 Andy Sebestyen
Slide 13: Converting Coal to Coke
Converting Coal to Coke • Blend of coal is charged into tall slot ovens • Coal is heated for 18 hours at 1100C in the absence of oxygen & converted into coke (nearly pure carbon) • QA/QC to determine coke quality • Coke is used in the Blast Furnace • Coke Oven gas is processed at the By-Product Pla
Slide 14: Producing Iron from Iron Ore
Producing Iron from Iron Ore • The Blast Furnace converts iron ore into molten iron metal Iron ore & limestone at 1450C for Steelmaking • Blast Furnace gas is used for steam & Coke electricity 1100C Fe2O3 + 3CO —› 2Fe + 3CO2
Slide 15: Greenhouse Gas Reduction Opportunity
Greenhouse Gas Reduction Opportunity Replace a portion of the fossil carbon (coal) with bio-carbon (used railway ties) Innovative technology: First application in a Canadian steel plant
Slide 16: Optimization of Wood/Coal Blend
Optimization of Wood/Coal Blend • Canmet Research Facility – Ottawa • Blends of coal and wood tested in bench and pilot scale facility • Analysis of coke strength, ash contest and coke stability • Optimal mixture of coals and wood
Slide 17: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Pilot Project Update: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements fo
Slide 18: Proposed 2020 CLC Meeting Dates
Proposed 2020 CLC Meeting Dates Wed. Feb. 5 Wed. May 13 Wed. Aug. 12 Wed. Nov. 4
Slide 19: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 18 September 2019 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Pilot Project Update: Utilization of Bio-Carbon to Reduce Fossil Carbon Input Requirements fo
Slide 20: Thank You.
Thank You. stelcocanada.com