Jayant Infratech Ltd. · BSE:JAYANT

Jayant Infratech — Investor Presentation (December 2025)

24 slides from Jayant Infratech's investor presentation, Dec 5, 2025

  1. Slide 1: Regulation 30 Disclosure Letter to BSE

    Date: December 05, 2025 To, BSE Limited Phiroze Jeejeebhoy Towers, Dalal Street, Mumbai – 400 001 Subject: Disclosure in terms of Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 (“SEBI Listing Regulations”). -Investor Presentation. Ref: Jayant Infratech

  2. Slide 2: Jayant Infratech Ltd Investor Presentation

    JAYANT INFRATECH LTD EMPOWERING E-MOTION INVESTOR PRESENTATION

  3. Slide 3: Company Overview

    2 COMPANY OVERVIEW Established in 2003, with a strong tech-driven foundation focused on railway electrification and infrastructure. Jammu & Kashmir Integrated Railway Solutions covering OHE, traction substations, P-Way, signalling, telecom, maintenance services, private railway sidings, and general

  4. Slide 4: Management Profile

    3 MANAGEMENT PROFILE Mr. Nilesh Jobanputra Promoter & Managing Director Mr. Nilesh Jobanputra, Promoter and Managing Director, has been a guiding force of the company since its inception, leading all strategic and management decisions. He holds a B.E. in Mechanical Engineering with First Division fr

  5. Slide 5: Core Team

    4 CORE TEAM PIYUSH SINGH VINEETA DEWANGAN HARDIK PAREKH SHRISTI RAMANI DHUNDHEL Senior Manager Compliance Officer Senior Operation Manager SR. Account Corporate & Strategic Alliances HEMANT KUMAR NIKHILESH MALLICK TARA KHATOON SAJID ALI YADAV Technical Support Executive Project Coordinator HR Execut

  6. Slide 6: Service Portfolio

    5 SERVICE PORTFOLIO EMPOWERING E-MOTION 360° RAILWAY ELECTRIFICATION & INFRASTRUCTURE SOLUTIONS Maintenance of OHE and Power Supply Installations (PSI) Preventive & Regular Electrical Infrastructure Maintenance A1 A2 The company provides comprehensive maintenance Over Head Electrification (OHE) serv

  7. Slide 7: From Steam to Diesel to Electric

    6 A1 FROM STEAM TO DIESEL TO ELECTRIC THE EVOLUTION OF RAILWAY TRACTION With rising environmental concerns and the need for faster, heavier trains, railways increasingly adopted electric traction, enabling higher speeds, lower emissions, Growing focus on efficiency and and better energy efficiency r

  8. Slide 8: Importance of Electrification

    7 A1 IMPORTANCE OF ELECTRIFICATION Indian Railways spends about ₹160 India, as a signatory to the Paris billion per year on diesel; shifting Climate Agreement, targets a 35% to electricity can save ₹80–100 reduction in carbon emissions, billion annually. Electric traction is about 50% making decarbo

  9. Slide 9: Over Head Electrification (OHE)

    8 A1 OVER HEAD ELECTRIFICATION (OHE) Jayant Infratech operates in the highest-value execution phase of railway electrification — the physical creation of OHE infrastructure that directly enables electric train operations. Complete Railway Electrification Value Chain Procurement Route of Materials Fo

  10. Slide 10: OHE Solutions by Jayant Infratech

    9 A1 OHE SOLUTIONS BY JAYANT INFRATECH Jayant Infratech is active in the CORE execution segments of the OHE value chain Foundations & Mast Erection Installation of Railway Electrical Systems Design & Detailed Engineering Excavation, concreting, foundation design Section insulators Layout planning AT

  11. Slide 11: What Is a Private Siding?

    10 WHAT IS A PRIVATE SIDING? A private siding is a dedicated railway track that connects directly into a company's facility—such as a coal mine, steel plant, or cement factory—allowing them to load and unload goods (coal, ore, finished products) without relying on public railway infrastructure. WHY

  12. Slide 12: Electrifying Growth: Jayant Infratech's Next-Gen Rail Vision

    11 ELECTRIFYING GROWTH: JAYANT INFRATECH’S NEXT-GEN RAIL VISION NEXT-GEN ELECTRIFICATION COMPREHENSIVE O&M LEADERSHIP SERVICES Leading the shift from 1×25 kV Providing Operations & → 2×25 kV, unlocking multi- Maintenance to sustain and year, high-margin opportunities. optimize infrastructure. Levera

  13. Slide 13: Clientele

    12 CLIENTELE Cement Logistics and Public Transportation Mining Coal Washery Manufacturing Steel Multiple Business manufacturing Ventures

  14. Slide 14: Industries We Serve

    13 INDUSTRIES WE SERVE Metro and regional Power and steel Indian Railways rail projects plants Railway zones and divisions (new wherever 25 kV OHE or traction Railway sidings and internal rail lines, doubling, yard remodelling, systems are used. connectivity for coal, ore and traction upgrades). fin

  15. Slide 15: Industry Overview

    14 INDUSTRY OVERVIEW Scale & Momentum Cost & Efficiency Benefits 99.08% Electrified (69,315/69,961 RKM) Current Diesel Spend: ₹160+ billion annually Industry shifts to upgrade & modernization. 24 States/UTs Fully Electrified (Gujarat achieved 100% on 23.11.2025) Annual Electrification Savings: ₹80–1

  16. Slide 16: Post-Electrification: Industry Growth Engines

    15 POST-ELECTRIFICATION: INDUSTRY GROWTH ENGINES Long-Term OHE & Private DFC, Metro Solar, Kavach & 2×25 kV Upgrade Substation & Logistics Smart Grid Cycle Maintenance Expansion Integration Nationwide shift from With 99.08% already Growing private ESG-driven tech 1×25 kV to 2×25 kV electrified, Rail

  17. Slide 17: Our Work

    16 OUR WORK

  18. Slide 18: Order Book

    17 ORDER BOOK Total orders received in FY 25- 26 up to 30th November 2025 stand at ₹221.81 cr ₹221.80 41.91% ₹218.10 CAGR DFCCIL ₹101.62 North Western Railway zone Northeast Frontier ₹38.54 ₹30.38 South East Central Railway Railway 8.87 7.01 FY 2021 FY FY FY FY or Old 2022-23 2023-24 2024-25 2025-26

  19. Slide 19: Profit & Loss Statement

    18 PROFIT & LOSS STATEMENT (₹ in Lakhs) Particulars H1 FY26 H2FY25 H1 FY25 YoY% Revenue 5,462.49 6,657.80 5,514.17 (0.94%) Other Income 73.97 158.64 18.85 292.41% Total Income 5,536.46 6,816.44 5,533.02 0.06% Total expenditure 4,858.60 5,982.91 5,084.10 (4.44%) EBITDA 677.86 833.53 448.92 51.00% EBI

  20. Slide 20: Balance Sheet

    19 BALANCE SHEET (₹ in Lakhs) Particulars H1 FY26 H2FY25 Equity Capital 1,033.67 1,015.67 Reserves & Surplus 4,551.22 3,962.34 Long term Borrowings 11.71 37.54 Other Non-Current Liabilities 3.33 3.32 Current Liabilities 5,380.89 5,161.56 Total Liabilities 10,980.82 10,180.43 Fixed Assets 46.25 72.27

  21. Slide 21: Key Financials

    20 KEY FINANCIALS 51.00% 59.85% 677.86 454.33 448.92 284.22 Long term Borrowings (₹ in Lakhs) 5228.36 234.14 H2FY25 37.54 (68.81%) H1FY25 H1FY26 H1FY25 H1FY26 H1FY26 11.71 EBITDA PAT (₹ in Lakhs) (₹ in Lakhs) 52.43% 61.36% 12.41% 8.32% 8.14% 5.15% Maharashtra Chhattisgarh Debtor days REVENUE BREAKUP

  22. Slide 22: Operations: Annualized Growth Trend

    ANNUALIZED GROWTH TREND 21 (Values are in Rupees Cr) 33.52% CAGR 32.97% CAGR 121.72 12.82 OPERATIONS REVENUE OF 89.30 7.82 EBITDA 5.73 38.30 4.10 42.48 Mar’22 Mar’23 Mar’24 Mar’25 Mar’22 Mar’23 Mar’24 Mar’25 36.73% CAGR 8.41 4.87 3.56 2.41 PAT Mar’22 Mar’23 Mar’24 Mar’25

  23. Slide 23: Disclaimer

    22 DISCLAIMER This presentation and the accompanying slides (the “Presentation”), which have been prepared by Jayant Infratech Ltd. (the “Company”), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe for any secur

  24. Slide 24: Thank You

    THANK YOU INVESTOR RELATION Abhishek Bhutra | Himanshu Jain +91 80006 85556 , +91 89051 81853 ir@finportalin.com

Jayant Infratech — Investor Presentation (December 2025) on 6ix