Cygnus Metals Limited · ASX:CY5

Cygnus Metals — Beaver Creek Precious Metals Summit 2025

21 slides from Cygnus Metals's conference presentation, Sep 8, 2025

  1. Slide 1: Quebec Focused Critical Minerals Explorer and Developer

    For personal use only Quebec Focused Critical Minerals Explorer and Developer High-Grade Chibougamau Copper-Gold Project ASX: OTCQB: CY5 CYGGF TSXV: CYG

  2. Slide 2: Cautionary Statements

    Cautionary Statements This presentation contains summary information about Cygnus Metals Limited (“Cygnus”, “Cygnus Metals” or the “Company”). The information in this presentation is of general background and does not purport to be complete. FORWARD-LOOKING STATEMENTS For personal use only This pres

  3. Slide 3: Strong Share Register & Funded

    Strong Share Register & Funded High News Flow Expected Through 2025-2026 (Resource Update & Upgrade Imminent) Capital Structure1 Current A�0.084 For personal use only Shares on Issue 1,064M2 Current Share Price1 Shareholder Summary1 A�89M Board, Mgt & Advisers 9% Market Capitalisation1 Ocean Partner

  4. Slide 4: Mineral Rich Quebec

    Mineral Rich Quebec A Tier 1 Mining Jurisdiction Chibougamau Copper-Gold Project For personal use only • High-grade resource (UPGRADE AND UPDATE IMMINENT) • Measured and Indicated of 3.6Mt at 3.0% CuEq and Inferred of 7.2Mt at 3.8% CuEq1 • One of the highest grade CuEq resource on the ASX • Comprehe

  5. Slide 5: Cygnus Value Proposition – the Why

    Cygnus Value Proposition – the Why An Opportunity to Create Significant Shareholder Value For personal use only Chibougamau Copper-Gold Upside and Growth Team with Strong Track Fully Funded with Project Opportunities Record Access to Capital • High-grade copper gold in • 2 drill rigs on site • Stron

  6. Slide 6: Chibougamau Copper Gold Project

    Chibougamau Copper Gold Project High-Grade Copper and Gold Terrane A Prolific Historic Camp The Opportunity For personal use only • Mined periodically between the early 1900s and 2008 • Consolidation - 7 former producing mines accounting for • Chibougamau District Historic Production: 68% of histori

  7. Slide 7: Chibougamau Copper Gold Project – Deposits

    Chibougamau Copper Gold Project High-Grade Copper and Gold Deposits (RESOURCE UPDATE & UPGRADE DUE SHORTLY) Platform for Growth For personal use only • Completed merger with Dore Copper • Recently consolidated 282km2 landholding • Centralised 900ktpa processing plant • 4 deposits with Mineral Resour

  8. Slide 8: Chibougamau North Camp – Exploration and Resource Growth Potential

    Chibougamau North Camp Significant Exploration and Resource Growth Potential Intersections Outside Resource For personal use only  5.9m @ 26.4% CuEq (1.2% Cu & 32.2g/t Au)  4.5m @ 16.8% CuEq (4.7% Cu & 14.9g/t Au) CHIBOUGAMAU NORTH CAMP  8.2m @ 16.7% CuEq (4.0% Cu & 16.2g/t Au)  7.0m @ 9.7 CuEq

  9. Slide 9: Chibougamau North Camp – A Large Endowed Mineral System

    Chibougamau North Camp A Large Endowed Mineral System Targeting Geophysics Drilling For personal use only  Data compilation  FLEM for surface near surface  Extensional drilling  Define key priority targets  DHEM for targets at depth  Brownfield exploration Refer to ASX releases dated 15 Octobe

  10. Slide 10: Resource Growth in North Camp

    Resource Growth in North Camp High Grade Gold at Golden Eye – Up to 60.8g/t AuEq (NEW RESOURCE IMMINENT) Open with Visible Gold Down Dip INITITAL RESOURCE Q3 CY2025 For personal use only • First drill hole returns 3.3m @ 6.6g/t Au including 2.3m @ 9.1g/t Au1 • Subsequent intersections include: 1. 7.

  11. Slide 11: Resource Growth & Upgrade at Corner Bay

    Resource Growth & Upgrade at Corner Bay The Flagship Asset (UPGRADE TO RESOURCE IMMINENT) Success in First Drill Hole RESOURCE UPGRADE Q3 CY25 For personal use only • First drill hole returns outstanding intersection of 7.3m at 4.6% CuEq, incl. 2.5m at 9.7% CuEq1 • Located outside current resource •

  12. Slide 12: Infrastructure in Place

    Infrastructure in Place For Fast Tracked Development Chibougamau Processing Facility Regional & Site Infrastructure For personal use only • Airport, regional railway, highways & gravel roads • Hydro power & connected powerlines • State of the art mining training centre • Conventional 900ktpa process

  13. Slide 13: Advancing Studies at Corner Bay

    Advancing Studies at Corner Bay The Flagship Asset Positive Flotation Tests Advancing The Project For personal use only • Excellent copper recoveries1 of 98.2% and 96.8% • Funding approval for C�1.3M from CMIF2 • High-quality copper concentrate grades1 of 27.0% and 29.6% • Completing environmental b

  14. Slide 14: Regional Overview

    Regional Overview Opportunity for Consolidation For personal use only Troilus Project Res – 7.3Moz @ 0.6g/t AuEq Roger M&I - 333Koz @ 0.8g/t Au Inf – 202Koz @ 0.8g/t Au Monster Lake Opemiska Inf - 433Koz @ 12.1g/t Au M&I - 97Mt @ 1% CuEq Only Base Metals Processing Matagami Chibougamau Infrastructur

  15. Slide 15: Opportunity & Strategy

    Opportunity & Strategy Multi-Pronged Growth Pathway For personal use only • Drill rigs on the ground • Use of modern exploration techniques including geophysics, DHEM etc. • Resource extensions and upgrades • Potential new deposits and resources • Continue to advance studies required for project dev

  16. Slide 16: Proven Track Record of Success

    Proven Track Record of Success Led by a team that has created significant shareholder value from exploration, development and production For personal use only David Southam Ernest Mast Kevin Tomlinson Mario Stifano Raymond Shorrocks Brent Omland Executive Chairman President and Non-Exec Director Non

  17. Slide 17: The End

    The End For personal use only * Image of drill hole CB-20-17 from 973m to 981m. Refer to CY5 ASX release dated 15 October 2024. 17

  18. Slide 18: Additional Information

    For personal use only Additional Information * Image of drill hole CB-20-17 from 973m to 981m. Refer to CY5 ASX release dated 15 October 2024. Appendix A: Mineral Resources Appendix B: Sources of Information 18

  19. Slide 19: Appendix A: Mineral Resources

    Appendix A: Mineral Resources Chibougamau Copper-Gold Project – Foreign Mineral Resource Estimate Disclosures as at 30 March 2022 Tonnes Cu Grade Au Grade Cu Metal Au Metal CuEq Grade Deposit Category (k) (%) (g/t) (kt) (koz) (%) Indicated 2,700 2.7 0.3 71 22 2.9 For personal use only Corner Bay (20

  20. Slide 20: Appendix B: Sources of Information

    Appendix B: Sources of Information Source for historic production figures: Leclerc. F, Harris. L. B, Bedard. J. H, Van Breeman. O and Goulet. N. 2012, Structural and Stratigraphic Controls on Magmatic, For personal use only Volcanogenic, and Shear Zone-Hosted Mineralization in the Chapais-Chibougama

  21. Slide 21: For personal use only

    For personal use only ASX: CY5 / TSXV: CYG Contact: info@cygnusmetals.com Phone: +61 8 6188 1627 www.cygnusmetals.com

Cygnus Metals — Beaver Creek Precious Metals Summit 2025 on 6ix