Slide 1: Third Quarter 2025 Financial Results
Third Quarter 2025 Financial Results November 2025
Slide 2: Cautionary Notes
Cautionary Notes Cautionary Note Regarding Forward-Looking Information and Statements Except for statements of historical fact relating to us, certain statements contained in this presentation (including information incorporated by reference herein) constitute forward-looking information, future ori
Slide 3: Diversified Portfolio with Six Key Assets
Diversified Portfolio with Six Key Assets Focused on Delivering Free Cash Flow and Growth 2025 Priorities (1) CC&V Close & Integration Diversified Portfolio Free Cash Flow Seabee (2) With Six Key Assets Focused 2025 Operating Guidance across four core strong margins with high-quality jurisdictions ~
Slide 4: 2025 Third Quarter Results
2025 Third Quarter Results Quarterly Operating Summary ▪ Consolidated production was 102.7 k GEOs at cost of sales of $1,585/oz and AISC of $2,359/oz ($2,114 ex. Çöpler) (1) ▪ At Marigold, production was 36.3 koz gold at cost of sales of $1,673/oz and AISC of $1,840/oz ▪ At CC&V, production was 29.8
Slide 5: 2025 Third Quarter Financial Results
2025 Third Quarter Financial Results (1) Financial Performance Diluted EPS Bridge (1) Q3 2025 Q3 2024 Q3 2025 0.03 0.01 Gold Equivalent Production oz 102,673 97,429 0.32 0.31 (0.01) (0.02) Gold Equivalent Sales oz 104,549 96,143 Revenue $M $385.8 $257.4 Net Income (loss) $M $57.1 $6.3 Attributable C
Slide 6: Operations
OUR PURPOSE To create value and leave a legacy through responsible and sustainable operations. OUR VALUES Operations Safety First, Always Better Together Be Excellent SSR MINING | 6 The ESG & Sustainability report is available on our website at: www.ssrmining.com/corporate_responsibility
Slide 7: Marigold: Large-Scale Open Pit in Nevada
Marigold: Large-Scale Open Pit in Nevada Quarterly Commentary (1) ▪ Q3 2025 production of 36.3 koz gold at cost of sales of $1,673/oz and AISC of $1,840/oz; Year-to-date production of 110.8 koz gold at cost of sales of $1,567/oz and AISC of $1,856/oz ▪ Q4 2025 is expected to be a strong period of pr
Slide 8: CC&V: Long-Lived Asset With Further Upside
CC&V: Long-Lived Asset With Further Upside (1) Quarterly Commentary ▪ Q3 2025 production of 29.8 koz gold at cost of sales of $1,394/oz and AISC of $1,756/oz; Year-to-date production of 85.2 koz gold at cost of sales of $1,272/oz •Red Dot and AISC of $1,536/oz ▪ A technical report for CC&V remains o
Slide 9: Seabee: High-Grade Underground in Canada
Location: Saskatchewan, Canada Seabee: High-Grade Underground in Canada Mining: Underground Processing: Gravity concentration, CIP Land: ~74,000 ha Quarterly Commentary (1) Ownership: 100% ▪ Q3 2025 production of 9.1 koz gold at cost of sales of $2,185/oz and AISC of $3,003/oz; Year-to-date producti
Slide 10: Puna: Argentina's Largest Producing Silver Mine
Puna: Argentina’s Largest Producing Silver Mine (1) Quarterly Commentary ▪ Q3 2025 production of 2.4 Moz silver at cost of sales of $16.80/oz and AISC of $13.54/oz; Year-to-date production of 7.8 Moz silver at cost of sales of $15.80/oz and AISC of $13.09/oz ▪ Continued advancement of extension oppo
Slide 11: Hod Maden: World-Class Copper-Gold Project
Hod Maden: World-Class Copper-Gold Project Location: Artvin, Türkiye Mining: Underground Quarterly Commentary Processing: Flotation Land: ~3,500 ha Ownership: 10% (1) ▪ In Q3 2025, $17.1 million was spent as engineering and initial site establishment efforts continued to progress, bringing year-to-d
Slide 12: Appendix & Endnotes
Appendix & Endnotes SSR MINING | 12
Slide 13: Endnotes & Non-GAAP Reconciliation
Endnotes & Non-GAAP Reconciliation Net Cash & Liquidity 1) Detailed disclosure related to the February 13, 2024 incident at the Çöpler mine (the “Çöpler Incident” or the “Incident”) was included in As of the Annual Report on Form 10-K for the year ended December 31, 2024 filed on February 18, 2025.
Slide 14: Non-GAAP Reconciliation
Non-GAAP Reconciliation Cash Costs and AISC Three Months Ended September 30, 2025 (in thousands, unless otherwise noted) Marigold CC&V Seabee Puna Corporate Total Çöpler Consolidated (Excluding Çöpler) Cost of sales (GAAP) (1) $62,436 $38,961 $19,661 $44,624 — $165,682 — $165,682 By-product credits
Slide 15: Non-GAAP Reconciliation
Non-GAAP Reconciliation 2025 Operating Guidance Marigold CC&V (2) Seabee Puna Corporate Total Çöpler Consolidated (operating guidance 100% basis) (1) (Excluding Çöpler) Gold Production koz 160 – 190 90 – 110 70 – 80 — — 320 – 380 — 320 – 380 Silver Production Moz — — — 8.00 – 8.75 — 8.00 – 8.75 — 8.
Slide 16: Non-GAAP Reconciliation
Non-GAAP Reconciliation Adjusted Attributable Net Income per Share Three Months Ended September 30, Nine Months Ended September 30, (in thousands, except per share) 2025 2024 2025 2024 Net income (loss) attributable to SSR Mining shareholders (GAAP) $65,441 $10,557 $214,297 ($266,832) Interest savin
Slide 17: SSR Mining Inc.
SSR Mining Inc. www.ssrmining.com Website: www.ssrmining.com invest@ssrmining.com Email: invest@ssrmining.com Toll-free: +1 (888) 338-0046 SSRM:NASDAQ / TSX