Perseus Mining Limited · ASX:PRU

Perseus Mining — Shareholder Meeting (November 2012)

23 slides from Perseus Mining's shareholder meeting presentation, Nov 23, 2012

  1. Slide 1: Annual General Meeting November 2012

    For personal use only ASX/TSX: PRU www.perseusmining.com Annual General Meeting November 2012 Mark Calderwood CEO

  2. Slide 2: Competent Person's Statement and Forward-Looking Statements

    For personal use only Competent Person’s Statement Information in this presentation that relates to exploration results, mineral resources or ore reserves is based on information compiled by Mr Mark Calderwood, who is a Chartered Professional Member of The Australasian Institute of Mining and Metall

  3. Slide 3: Perseus the Company

    Perseus the Company Track Record; For personal use only • Exploration - 16 Years in West Africa discovered 9Moz • Development - Edikan built on time and on budget • Production - Over the last 18 months evolved into a miner and producer Large, low risk (open pit and free milling) High margin projects

  4. Slide 4: Perseus the Company - Philosophy

    Perseus the Company - Philosophy For personal use only Targeting low total cost* (<$1,000) and high IRR (+30%) projects to maximise return Continuous optimisation of existing projects Reduce risk - experienced team, focus, steady growth, low gearing Corporate responsibility, building a long term pre

  5. Slide 5: Key Achievements Last Months

    Key Achievements Last 12 Months For personal use only  Declared commercial production 1/1/12  Maiden profit of A$52M 30/6/12  First +50Koz quarter - June 2012  Paid out project finance - November 2012  Government approvals Sissingué

  6. Slide 6: Key Operating Statistics for Months to Sep 2012

    Key Operating Statistics for 12 Months to Sep 30 2012 For personal use only Quarter Dec 11 Mar 12 June 12 Sept 12 Mining (Mbcm) 3.68 4.76 3.66 4.12 Ore Mined (Mt) 1.8 2.2 2.1 2.0 Ore Processed (Mt) 1.09 1.03 1.15 1.28 Gold produced (oz) 35,801 38,796 52,670 52,610 GCC (US$/oz) N/A $975 $716 $817 ACC

  7. Slide 7: Financial Position as at Nov 20, 2012

    Financial Position as at Nov 20, 2012 For personal use only Total available cash US$45M Bullion on hand 14,000ozs Total borrowings Nil Available credit line US$100M Hedging commitments* 230koz *Hedged gold deliverable in quarterly instalments till December 2015 at an average price of $1,365/oz, repr

  8. Slide 8: Mineral Resources & Reserves (Gold)

    Mineral Resources & Reserves (Gold) For personal use only 7.0Moz (87% in Ghana) in M&I Resources (197Mt at 1.1g/t) Including 4.0Moz (84% in Ghana) in Reserves (104Mt at 1.2g/t) ................................................... Additional 2.2Moz (88% in Ghana) in Inferred Resources (74Mt at 0.9g/t)

  9. Slide 9: Projects

    For personal use only Projects 9

  10. Slide 10: Ashanti Belt

    Ashanti Belt For personal use only Edikan 650 sq km total Grumesa In the rich Ashanti gold belt Edikan, Grumesa Meas. & Ind. 6.1Moz -182Mt Inf. 2.0Moz - 67Mt Significant exploration upside years of drilling ahead 10

  11. Slide 11: The Edikan Gold Mine ("EGM")

    The Edikan Gold Mine ("EGM") For personal use only ESUAJAH NORTH ESUAJAH ABNABNA SOUTH FOBINSO Mill Site FETISH BOKITSI MAMPON CHIRAWEWA Reserves Resources Current Production Pits DADIESO 11

  12. Slide 12: For personal use only

    For personal use only

  13. Slide 13: Edikan Gold Mine - Quality Project

    Edikan Gold Mine - Quality Project For personal use only Large deposits - 80m wide ore bodies bulk mineable Open pit operations (W:O 3.4:1 ) Large mill, ramping up to 8mtpa Low cost, low consumer of power, cyanide, grinding, media Favourable recovery at coarse grind, currently 85%-90%, increasing to

  14. Slide 14: Edikan Gold Mine - Guidance

    Edikan Gold Mine - Guidance For personal use only Dec Qtr 12 Jan - Jun 13 FY 2012/13 Throughput (dry Mt) 1,700,000 3,600,000 6,600,000 Head grade 1.43g/t 1.24g/t 1.3g/t Gold recovered (oz) 65,000-70,000 127,000 - 143,000 245,000 - 265,000 Adjusted C1 cash $575 $625 $600 cost (US$/oz) Overheads 12% U

  15. Slide 15: Edikan Gold Mine Simplified Flow Sheet

    Edikan Gold Mine Simplified Flow Sheet For personal use only 1,200tph Oxide Fresh Rock capacity Coarse Feed Crusher Ore Stockpile 400tph 1,000tph capacity capacity SAG 212 micron Flotation Tails Milling GRAVITY FLOTATION 14MW SAG mill, Currently using 12MW Current milling 750-900tph Ramping up to 1,

  16. Slide 16: Edikan Gold Mine - Mill Performance

    Edikan Gold Mine - Mill Performance Month Days of mill throughput exceeding: Gold Produced For personal use only days kt/d average days 19kt/d 20kt/d lost2 avg.3 oz/day4 +700oz5 April 1 0 1 14.0 626 13 May 1 0 1 14.4 601 11 June 0 0 3 11.5 505 4 July 2 1 6 15.8 650 9 August 7 2 0 15.7 628 13 Septemb

  17. Slide 17: Corporate Responsibility

    Corporate Responsibility For personal use only Environment OH&S Host Communities Employee training & benefits

  18. Slide 18: Perseus Licences - Côte d'Ivoire

    Perseus Licences - Côte d'Ivoire ~3000 sq km Under explored For personal use only Sissingué Resource: 0.93Moz M&I, 0.26Moz Inf. Reserve: 0.66Moz Tengrela Significant intercepts on multiple prospects - mostly small satellites Mbengue, Drilling assays pending Napiè Drilling assays pending Underexplore

  19. Slide 19: Sissingué Gold Project Status

    Sissingué Gold Project Status Permitting Completed For personal use only • Environmental and Social Impact Assessment approved by Ivorian National Environmental Agency (ANDE) • Exploitation Permit granted August 2012 Detailed design/tenders • Detailed design approximately 98% complete • All key equi

  20. Slide 20: Sissingué Gold Project

    Sissingué Gold Project For personal use only Capital budget US$115M (Nov 2010 estimate) • Tendered equipment prices in line with expectations • Optional additional US$33M for HV power line to connect the mine to national power grid • Project Expenditure to Date totals US$11.9 million • Early works -

  21. Slide 21: Perseus The Future

    Perseus The Future Ramp up Edikan Gold Mine - Increase throughput beyond name plate and For personal use only continue to grow reserves Develop and grow Sissingué - Bring mine into production in Q1 2014 could add 170koz to production profile and reduce overall cash cost, will step up exploration and

  22. Slide 22: Mineral Resources

    Mineral Resources Mineral Resources (Gold) Including Reserves For personal use only Measured Indicated Inferred Deposit Tonnes g/t oz. Tonnes g/t oz. Tonnes g/t oz. (cut-off g/t Au) (million) Au Au (million) Au Au (million) Au Au (,000) (,000) (,000) Edikan Gold Mine 49.5 1.5 2,367 38.2 1.3 1,814 24

  23. Slide 23: Mineral Reserves

    Mineral Reserves For personal use only Mineral Reserves (Gold) Deposit Proven Probable Total Tonnes g/t Ounces Tonnes g/t Ounces Tonnes g/t Ounces (million) Au Au (million) Au Au (million) Au Au (,000) (,000) (,000) Edikan >0.4g/t 64.6 1.2 2,417 29.2 1.0 961 93.8 1.1 3,378 Tengrela >0.55g/t 9.7 2.1

Perseus Mining — Shareholder Meeting (November 2012) on 6ix