QumulusAI, Inc. · NASDAQ:QMLS

QumulusAI — Investor Presentation (September 2026)

32 slides from QumulusAI's investor presentation, Sep 22, 2026

  1. Slide 1: Breaking AI's Bottleneck

    Breaking Al's

  2. Slide 2: Forward-looking Statements and Disclaimers

    Q omnes 1) vrsctaruen Forward, looking Statements and Disclaimers

  3. Slide 3: Why We Win

    Why

  4. Slide 4: Demand for AI infrastructure providers is compounding

    Demand for AT infrastructure providers is compounding. It all runs on Al infrastructure Demand is proven: the binding constant is capacity build-out

  5. Slide 5: Drivers of Demand

    Drivers of Demand Better models. Better results.

  6. Slide 6: Demand is real and it's repricing compute

    Demand is real and it’s repricing compute GPU Rental Pricing Industry Trends S45

  7. Slide 7: The bottleneck: data centers can't come online fast enough

    Qoumaesss If THE BOTTLENECK Data centers can’t come online fast enough 2,060 GW 5+ years 30-50% ‘and still lengthening, to slip or be canceled connection —1.5x the entire installed US fleet

  8. Slide 8: The market needs faster, more flexible access to compute

    Q omnes 1/ oun FACTS wopeL The market needs faster, more flexible access to compute ‘We house the latest models of NVIDIA GPUs in colocation facilities and <SOMW capacity data centers to in months, on a quarterly deployment cadence that can accelerate time to bring GPU capacity online value for our

  9. Slide 9: Tr

    Tr

  10. Slide 10: What's inside one megawatt of IT load

    Qos What's inside one megawatt of IT load

  11. Slide 11: Power footprint: what's live, signed, and held

    Qoumaesss 1 Power FoorPRIN What's live, what's signed, and what we hold

  12. Slide 12: What today's capacity generates, and its potential

    What today's capacity generates, and its potential ee ~$75M | yr

  13. Slide 13: Revenue backlog RPO of $173.1M

    Q owns nasoag quis i: 15 11 REVENUE BACKLOG 2 RPO of $173.1M; ~$276M pro forma backlog with post-quarter signings cxrecren pevenve aecoostyoM ay vear = aeronteD g@ APO ve. Pao ForwA sAceLoe C2Liueraatz¥E) ~S276M ‘$173.1 Phe aoe ovsomienngarae 8

  14. Slide 14: Selected news, June-August 2026

    Selected news, June-August 2026 Metro Atlanta site anchors the next 3.75 MW me DDRW becomes a customer fora dedcated 8300 cluster uo >, e000 “Agentic hedge fund runs on QumulusAl Blackwell capacity ‘S7LOM three-year agreement with a Alinfrence platform '$32M two-year Biackwell 8300 agreement for gen

  15. Slide 15: Distributed for speed now, positioned for inference next

    Distributed for speed now, positioned for inference next a ° ¢ a ha crt

  16. Slide 16: A network of sites: how we build it, and why it compounds

    Qoumnes A network of sites: how we build it, and why it compounds Find Deploy Monetize “Today, distribution is a means to an end. Over time, we think it becomes the end itself.”

  17. Slide 17: Who We Work With

    Qoumaesss Who We Work With Anvioin <eR Dedric mise ems Wovetuster = \N WEKA Sorcees OUSD.AL Gwvainosco — Gfieooter ince Ganercy Ofal = baseten Az @Shadeform DRW @runpod S QUBRIDA] #4 HYPERBOLIC B) scorns @ Data Room Al — jyeeno)

  18. Slide 18: Slide 18

  19. Slide 19: Customers open with "When can I be running?"

    Q omnes 1h oway we wow Customers don't open with price. They open with "When can I be running?” — we a pe

  20. Slide 20: Smaller, distributed sites reach power faster than large campuses

    Smaller, distributed sites reach power faster than large campuses. Pockets of 2-60 MW of exiting ox near-rendy ower, ‘mostly in colocation, brought online in month: 1. More sites to choose from, and in many jurisdictions, a lower bar for permits and approvals. 2. Faster builds and lower delivery ris

  21. Slide 21: Validated by NVIDIA. Built for production.

    Validated by NVIDIA. Built for production. Qumulislis an official NVA delivering i production se: reference archi loud Porn cog structure purpose-built for modern Al worklo: AE DIRGG DUR od Valostod Goan Faster time Consistent Confidence to production Performance at inthe ale investment Preferred vi

  22. Slide 22: Customer testimonials

    Q omnes 11 FROM THE souncE Customer testimonials ff compute for customers building Al at scale.” 3p scele, iterate That abilty to keep learning is fundamental 1 finding new edge.” Bich Norman, Chiat Infomation dedicated, + Hyperbolic DRW' @Shadeform

  23. Slide 23: Team

    Tean

  24. Slide 24: At the helm: an operator who's scaled GPU cloud

    At the helm: an operator who's scaled GPU cloud Georgia Tech Stanley x Applied Digital (CTO) Qumulusal (CEO)

  25. Slide 25: A team that has built

    Qoumaesss team that has buil ‘2080008 £ . 9@4e60

  26. Slide 26: Slide 26

  27. Slide 27: Q2 2026 financial summary

    Qos Q2 2026 financial summary Operas caseisoa Acted TOA an OM)" (zsar06 wae90%8) (240047001 (wszen $173.1M nai petrmance abostens 66.6% +96% $(0.8)M enc EOTOA*

  28. Slide 28: Statement of Operations

    Qos Statement of Operations +118% +104% esse ‘0206007 waseem

  29. Slide 29: Balance sheet & liquidity snapshot

    Qos Balance sheet & liquidity snapshot Telstra td $215.0M 2702210 Eedngcash tread 367060 T7480 800203. 99807202 mange 7a7e.440 Co

  30. Slide 30: Operating loss and net loss bridge

    Qos If OPERATING Loss + NET Loss BRIDGE H1 2026 net loss is almost entirely non-cash perstng nas we SGM toe the HT 2028 ‘Te reportee $72.4M net loss s avon by $73.0 on f2h on he see of ecu Inetrodinesmente— ot by operations.

  31. Slide 31: Adjusted EBITDA reconciliation

    Qos Adjusted EBITDA reconciliation $(0.8)M

  32. Slide 32: This isn't hyperscale.

    This isn't hyperscale. It's

QumulusAI — Investor Presentation (September 2026) on 6ix