Slide 1: Mount Thorley Warkworth (MTW) Community Consultative Committee
Mount Thorley Warkworth (MTW) Community Consultative Committee (CCC) Wednesday 12 February 2020 Time: 2pm – 3:30pm Location: Warkworth Office Boardroom Independent Chairperson: Col Gellatly Minutes: Sarah Purser
Slide 2: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 3: 1. Welcome
1. Welcome Warkworth Mining Limited EMERGENCY EVACUATION PROCEDURES ACTION TO BE TAKEN ON DISCOVERING A FIRE OR OTHER EMERGENCY 1. ALERT PERSONS NEARBY OF THE SITUATION. 2. EXTINGUISH THE FIRE IF ABLE TO DO SO WITH SAFETY 3. IF NOT ABLE TO PERFORM 2) NOTIFY RECEPTION OF THE EMERGENCY 3, FOLLOW THE E
Slide 4: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 5: 2. Apologies
2. Apologies Jason McCallum 5
Slide 6: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 7: 3. Declaration of pecuniary interests / conflicts of interest
3. Declaration of pecuniary interests / conflicts of interest All members must declare interests. Source: Community consultative committees Guidelines (State Significant Projects), November 2016. 7
Slide 8: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 9: 4. Business Arising
4. Business Arising Action No. Action Response/ Update 1 In response to a query from Update this meeting – plan and areas requested. Stewart, MTW to provide the total disturbance area to the west of the former Wallaby Scrub Road inclusive of; tree clearing and removal of vegetation, access roads and
Slide 10: Business Arising
Business Arising Action 1 - Response In addition the disturbance shown at the last meeting (12.5ha) in the North, 64.4ha of other disturbance has occurred to date West of Wallaby Scrub Road. This includes the removal of trees for the construction of access tracks and water management infrastructure
Slide 11: Business Arising
Business Arising Action 2 - Plans from the EIS to clarify the SSD-6464 Development Consent Boundary, Mining Lease boundary and MTW's approved disturbance limit within those areas. 11
Slide 12: Business Arising
Business Arising Action 2 - Plans from the EIS to clarify the SSD-6464 Development Consent Boundary, Mining Lease boundary and MTW's approved disturbance limit within those areas. 12
Slide 13: 4. Business Arising
4. Business Arising Action No. Action Response / Update 3 Gary to provide detail to the CCC regarding the Road closures for Charlton Road are mandatory requirement for MTW to close the Putty Road when when blasting in Loders Pit West due to distance there is blasting activity in Loders Pit. between
Slide 14: 4. Business Arising
4. Business Arising Action No. Action Response / Update 6 MTW to provide an update on their Blasting Update this meeting. Procedures with regard to stemming at the February 2020 CCC Meeting. 7 In response to a suggestion by Adrian, MTW to Action carried forward - MTW Site tour to organise a Site Tou
Slide 15: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 16: 5. Correspondence
5. Correspondence CCC Member Advertisement and MTW SIMP (12/12/19) Request to amend February 2020 Meeting date (23/01/2020) Amendment to February 2020 Meeting date (email 28/01/2020) Agenda & Business Papers (30/01/2020) CCC Meeting Minutes Endorsed by the Chair – 25 November 2019 (10/02/2
Slide 17: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 18: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 19: MTW Operations
MTW Operations Mining production continued in Warkworth and Mount Thorley Operations. Dragline 102 continued to operate in Loders Pit South. DL103 has been working in West Pit but has relocated to North Pit. By the end of February, DL101 will be parked up in WPS. EX321 was commissioned in
Slide 20: MTW Operations – NOOP Dam
MTW Operations – NOOP Dam North Out of Pit Dam (NOOP) works will commence in Q2 2020. NOOP will provide improved water security / balance position at MTW. Infrastructure and test blasting initially completed in 2019. 20
Slide 21: Exploration
Exploration Exploration activities have continued within the current leases A 2D Seismic survey commenced in January 2020, due to be completed in February 2020. Approximately 62 kilometres of survey occurring along existing site tracks, minimising disturbance. 21
Slide 22: MTW Operations
MTW Operations 2019 Operational Downtime YTD Water Cart Truck Shovel Scraper RT Dozer Equipment Type Receival Lines Grader Fuel/Lube Cart Float FE Loader Excavator Drill Dragline Dozer Cable Reeler 0 500 1000 1500 2000 2500 3000 3500 4000 Environment Dust MTW Noise Monitoring YTD # CRO Assessments #
Slide 23: MTW Operations – Wambo Road TEOM
MTW Operations – Wambo Road TEOM The new Wambo Road TEOM has been installed and integrated into MTW’s systems and will replace the Wallaby Scrub Road TEOM. The new location is representative of the nearest privately owned receptor, and is further from the active mine area (with mine advancement to t
Slide 24: MTW Operations – North Warkworth Meteorological Station
MTW Operations – North Warkworth Meteorological Station A new meteorological station has been installed at North Warkworth, and is being integrated into MTW’s systems. Once sufficient data review and comparison has occurred, the wind speed and direction data from the met station will be tested with
Slide 25: MTW Operations – Rehabilitation/Disturbance 2019-2020
MTW Operations – Rehabilitation/ Disturbance 2019-2020 Rehabilitation target for 2019 = 80 ha seeded (outlined in blue) 82.7ha seeded to the end of December (highlighted yellow) Only 24.9ha (of planned 60ha) of Stage 2 seeding completed in 2019 due to dry conditions Rehabilitation target for
Slide 26: MTW Weed Management 2019
MTW Weed Management 2019 Weeds targeted in MTW operational areas 2019 included: African boxthorn (Lycium ferocissimum) Galenia (Galenia pubescens) Green cestrum (Cestrum parqui) Lantana (Lantana Camara) Mother of millions (Bryophyllum delagoense) Opuntia (Pear) species (Tiger, Prickly an
Slide 27: MTW BA Weed Management 2019
MTW BA Weed Management 2019 Weeds targeted in the Southern and Northern Biodiversity Areas in 2019 included: Prickly Pear (Opuntia stricta), Galenia (Galenia pubescens), Mother of Millions (Bryophyllum delagoense) Lantana (Lantana camara) Green Cestrum (Cestrum parqui) Castor Oil (Ricinu
Slide 28: MTW BA Planting Program
MTW BA Planting Program In 2019, restoration work included infill planting over 11,000 tube stock into 129ha of Central Hunter Grey Box – Ironbark Woodland and River Oak Forest in the Southern BA. Infill of 9,000 tube stock was planted into Warkworth Sands Woodlands in the Southern BA. Infill planti
Slide 29: MTW Tree Guard Update
MTW Tree Guard Update The pink tree guards previously used at MTW will no longer be used as the supplier has moved to a black product that is made from 100% recycled plastics and is discontinuing the production of the pink tree guards. The supplier has chosen this tree guard product to align their
Slide 30: MTW Vertebrate Pest Management
MTW Vertebrate Pest Management 2019 vertebrate pest programs included: 1080 baiting in autumn and spring 1080 feral pig baiting in spring Feral cat trapping Opportunistic shooting 2020 vertebrate pest programs will be coordinated with LLS and adjoining landholders so programs are undertaken
Slide 31: MTW Operations - Business Papers
MTW Operations - Business Papers Business papers provided to CCC prior to meeting Includes summary of: • Complaints, Incidents, Environmental Monitoring, Rehabilitation, Website Uploads, Community Investment Update Appendix C – MTW MEMR October and November 2019 provided. December 2019 will be
Slide 32: Management Plans / Reporting
Management Plans / Reporting Finalisation of the MTW Social Impact Management Plan (SIMP) occurred in early November 2019 and was provided to CCC members. The SIMP is a commitment from the 2014 EIS. SIMP has been published on MTW website. DPIE has indicated acceptance of the MTW Annual Review fo
Slide 33: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 34: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 35: General Business - Community update
General Business - Community update Community Update Letter • January 2020 – Community Newsletter was distributed to the local community surrounding the operation. It provides operation updates including mining operations, upcoming NOOP construction, Loders TSF, Exploration (drilling, 2D seismic, pr
Slide 36: Bushfire Emergency – Yancoal Contribution
Bushfire Emergency –Yancoal Contribution Corporate Donation Yancoal reaffirms its commitment to the local communities in which we operate. Many of our employees are members of the RFS and the SES, and are experiencing first-hand the devastation the current bushfire season is having at a local, state
Slide 37: Community update
Community update Community Support Program The MTW Community Support Program continues in 2020. 30 applications were received for the CSP opportunity that closed in November 2019. The following organizations are being supported in 2020 through the Community Support Program: University of Newcastle S
Slide 38: Agenda
Agenda 1. Welcome (Col) 2. Apologies (Col) 3. Declaration of pecuniary interests / conflicts of interest (Col) 4. Business Arising (Col) 5. Correspondence (Col) 6. Confirmation of the previous meeting’s minutes (Col) 7. Proponent reports and overview of activities • Progress of the project, environm
Slide 39: Future Dates
Future Dates Next Meeting Date Date: Monday 6 May 2020 – MTW Board Room Time: 2:00PM-3:30PM 39