  1. Slide 1: Production Development Progress - Corporate Presentation

    Slide 1: Production Development Progress - Corporate Presentation

    Production Development Progress Corporate Presentation March 2019

  2. Slide 2: Triangle Energy (Global) Ltd overview

    Slide 2: Triangle Energy (Global) Ltd overview

    TRIANGLE ENERGY (GLOBAL) LTD (ASX:TEG) Triangle is an oil producer with a growing exploration and development portfolio in the under explored Perth Basin ▪ Australian focus in the oil and gas sector ▪ 78.75% interest and operator of the Cliff Head Oil Field with production (651 bbls net1) and predic

  3. Slide 3: Corporate Snapshot

    Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT Capital Structure and Key Metrics Board ASX Code TEG Timothy Monckton Non-Executive Chairman Shares on issue1 306.8 million Robert Towner Managing Director Unlisted options on issue 6.000M exc @ $0.06, exp 29 Mar 2019 11.155M exc @ $0.15, exp 19 Jan 2020 Darren Bromley Executive D

  4. Slide 4: Cliff Head Oil Field

    Slide 4: Cliff Head Oil Field

    CLIFF HEAD OIL FIELD CLIFF HEAD OIL FIELD ® Xanadu Discovery © Prospect @ Oil Field nach @ Gas Field tora XANADU DISCOVERY —_, TriangleEnergy

  5. Slide 5: Cliff Head Operations

    Slide 5: Cliff Head Operations

    CLIFF HEAD OPERATIONS Cliff Head Oil Field Production Profile ▪ CHJV (100%) production December quarter 2018: 70,491 bbls (766bopd) ▪ 93% increase in average daily production on previous quarter ▪ CHJV (100%) oil sales revenue December 2018 quarter: AU$6.35 million ▪ CHJV lifting costs: US$28.52/bbl

  6. Slide 6: Perth Basin Growth Strategy

    Slide 6: Perth Basin Growth Strategy

    PERTH BASIN GROWTH STRATEGY ▪ Cliff Head Production Enhancement Programme ▪ 50%¹ participating interest in Production Licence L7 Mt Horner ▪ 45% participating interest in TP/15 JV (Xanadu oil discovery) ▪ Continue to assess opportunities in the Perth Basin ▪ Capacity to process additional crude with

  7. Slide 7: Cliff Head Production Enhancement Programme

    Slide 7: Cliff Head Production Enhancement Programme

    PERTH BASIN GROWTH STRATEGY cont Cliff Head Production Enhancement Programme Reservoir Management Reservoir dynamic modelling Waterflood Management Redefine waterflood strategy to balance the sweep and improve recovery, through zonal isolation in existing water injector(s) or conversion of producer

  8. Slide 8: TP/15 Xanadu Discovery

    Slide 8: TP/15 Xanadu Discovery

    PERTH BASIN GROWTH STRATEGY cont TP/15 XANADU DISCOVERY The story so far……a strong upside position ▪ Confirmed oil discovery ▪ Triangle has a 45% interest in the TP/15 Joint Venture ▪ Xanadu-1 was drilled as a deviated well, from an onshore surface location to an offshore target, TD at 2035m. ▪ Xana

  9. Slide 9: Production Licence L7: Mount Horner

    Slide 9: Production Licence L7: Mount Horner

    PERTH BASIN GROWTH STRATEGY cont PRODUCTION LICENCE L7: MOUNT HORNER 50% Farmout Agreement Executed1 ▪ The Joint Venture will commence an Early Work Programme which will include the workover of two of the existing production wells at the Mount Horner Oil Field. ▪ In parallel with the Early Works Pro

  10. Slide 10: State Gas Limited

    Slide 10: State Gas Limited

    STATE GAS LIMITED (ASX:GAS) 35.47% equity interest worth ~$40 million (at ~$0.85 per share 22-03-19) ▪ GAS holds an 80% interest and is the Operator of the Reid’s Dome Gas Project (PL231) in the Bowen Basin QLD ▪ Successfully drilled two wells during Q4 2018, Primero West-1 and Nyanda-4 ▪ Nyanda-4 d

  11. Slide 11: Investment Proposition

    Slide 11: Investment Proposition

    INVESTMENT PROPOSITION The only offshore and onshore ✓ Developing projects and creating value in the Perth Basin infrastructure operating in the ✓ 78.75% interest and Operator of Cliff Head Oil Field Perth Basin ✓ Oil production providing predictable, positive cash flow ✓ Valuable infrastructure wit

  12. Slide 12: Triangle Energy contact details

    Slide 12: Triangle Energy contact details

    Triangle Energy (Global) Limited (ASX:TEG) Mr Rob Towner – Managing Director Ground Floor, 100 Havelock St West Perth Western Australia 6005 E: info@triangleenergy.com.au T: +61 8 9219 7111 W: www.triangleenergy.com.au

  13. Slide 13: Disclaimer and Forward Looking Statements

    Slide 13: Disclaimer and Forward Looking Statements

    DISCLAIMER AND FORWARD LOOKING STATEMENTS ▪ This Presentation is provided on the basis that Triangle Energy (Global) Limited (“Triangle” or the “Company”) nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any repre