Mcewen Inc. · NYSE:MUX

Mcewen — McEwen Mining — Investor Day (September 2018)

157 slides from Mcewen's investor day presentation, Sep 6, 2018

  1. Slide 1: Agenda

    Agenda 2 Introduction: Rob McEwen, Chief Owner, Chairman Exploration: Sylvain Guerard, Senior Vice President - Exploration Ken Tylee, Exploration Manager - Black Fox Charles Sulfrian, Exploration Manager - Gold Bar Operations: Chris Stewart, President and Chief Operating Officer Chris Price, Busines

  2. Slide 2: Bios

    Bios 3 Rob McEwen, Chairman and Chief Owner of McEwen Mining Inc. Rob is the founder and former Chairman and CEO of GoldCorp Inc., which is, by market capitalization, the largest gold producer in the world. In 1990, Rob jumped from the investment industry into the mining industry. By 1993, he had be

  3. Slide 3: Bios

    Bios 4 Donald Brown, Sr. Vice President - Projects Donald is a seasoned mining professional having previously held roles as Vice President of Projects for Glencore and Construction Manager for Bechtel Mines and Metals. He has worked on many large scale mining projects in all stages of feasibility, d

  4. Slide 4: Bios

    Bios 5 Ken Tylee, Exploration Manager – Black Fox Ken is a P. Geo who has been conducting gold exploration programmes within the Porcupine Mining Camp since 1984. He was employed for 20+ years with the Kinross-Placer-Goldcorp transition of mining operations within Timmins, supervising exploration te

  5. Slide 5: Bios

    6 Chris Price, Business Manager - Black Fox Chris is a mining professional with more then ten years of experience in the gold and copper extraction sectors. He has held senior roles in safety, administration and finance. Chris holds a degree in Pre-Law Studies from Nipissing University and an Execut

  6. Slide 6: Cautionary Statement

    Cautionary Statement 7 This presentation contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this pr

  7. Slide 7: Black Fox Mine Resource Block Model

    Black Fox Mine Resource Block Model > 3 g/t 8 Au 3 - 5 g/t Au > 5 g/t Pit Outline

  8. Slide 8: Black Fox Mine Resource Block Model

    Black Fox Mine Resource Block Model > 10 g / t 9 Au > 10 g/t Pit Outline

  9. Slide 9: Black Fox Mine Resource Block Model

    Black Fox Mine Resource Block Model > 30 g / t 10 Au > 30 g/t Pit Outline

  10. Slide 10: Black Fox Mine Resource Block Model

    Black Fox Mine Resource Block Model > 50 g / t 11 Au > 50 g/t Pit Outline

  11. Slide 11: Chris Stewart, President & COO

    12 Chris Stewart President & COO

  12. Slide 12: Our Assets

    Our Assets 13 Ontario – Timmins Complex = Black Fox, Stock & Fuller/Lexam properties – located right along the Destor-Porcupine Fault Nevada – Gold Bar mine under construction – located right on top of the Battle Mountain Cortez Trend Mexico – Project Fenix – looking to add 12 years of mine life to

  13. Slide 13: Structured Approach

    Structured Approach 14 Exploration – Resource Growth in areas that can add mine life in the short to medium term Operations – Looking to convert resources over to reserves in coordination with Exploration work Cost Reduction Efforts – Drive down our cost/ounce while optimizing the operations Innovat

  14. Slide 14: Our People

    Our People 15 Black Fox Mine – Richard (Rick) Anderson and Chris Price Gold Bar – Simon Quick and Jeff Snyder Mexico – Adrian Blanco Saenz Los Azules – Donald Brown Fuller & Lexam Propeties – Nigel Fung Innovation – Nathan Stubina

  15. Slide 15: Rick Anderson and Chris Price, Black Fox

    16 Rick Anderson General Manager, Black Fox Black Fox Chris Price Business Manager, Black Fox Black Fox

  16. Slide 16: Historic Mining Camp

    17 Historic Mining Camp +70 Million ounces produced Fuller Davidson Tisdale Stock East Froome Black Fox Grey Fox Stock Mill Hwy 101 0 5 10 km TIMMINS MATHESON INDICATED INFERRED PROBABLE 2,930,500 OZ AU 1,073,200 OZ AU 113,000 OZ AU 1Resource & reserves, see www.mcewenmining.com/operations/reserves-

  17. Slide 17: Black Fox Deposits Indicated Resource

    18 Black Fox Deposits Indicated Resource Black Fox 576Koz @ 7.9 g/t Au Froome 181Koz @ 5.1 g/t Au Tamarack 126Koz @ 5.08 g/t AuEq Grey Fox 465Koz @ 5.5 - 7.5 g/t Au 1,348,000oz Au & AuEq Indicated Resources 1Resource & reserves, see www.mcewenmining.com/operations/reserves-and-resources/default.aspx

  18. Slide 18: Timmins Complex Production Plan

    19 Timmins Complex Production Plan Target 4-5 Mines Feeding Central Mill Black Fox Reserves Ounces Added from Exploration Froome Current Resources Fuller Grey Fox Expected Production Stock Tamarack Expected Production 2018 2019 2020 2021 2022 2023 2024 & Beyond Based on internal estimates

  19. Slide 19: Cost Reduction Impact

    Cost Reduction Impact Initiatives Impact – Cost per Ounce 20 Current Initiatives Decrease in Cash Cost / Ounce Capex Payback Energy Conservation Initiatives ~ $39 No capital required N/A Automated Ventilation ~ $17 $145K ~2 Months Backfill Plant Upgrades ~ $3 No capital required N/A Engineered Backf

  20. Slide 20: Cost Reduction Efforts

    Cost Reduction Efforts Lower Trending Cost per Ounce Since McEwen Purchase 21 2018 based on internal estimates $- $200 $400 $600 $800 $1,000 $1,200 Primero 4- Year Avg Oct Nov Dec Jan-18 Feb Mar Apr May Jun Jul 2018 Forecast Cash Cost / Ounce (USD)

  21. Slide 21: Froome Project Conceptual Mine Design

    22 Froome Project Conceptual Mine Design Conceptual Ramp Froome Resource1: 181K oz’s @ 5.1g/t Froome Footwall Au Occurrence Black Fox 850m 1 Press release “McEwen Mining Intersects 53.9 g/t Gold Over 8.3 m at the Froome Footwall”, Sep 6, 2018.

  22. Slide 22: Grey Fox Project

    23 Grey Fox Project 147, Contact & South Zones

  23. Slide 23: Zone Conceptual Mine Design

    147 Zone Conceptual Mine Design 24

  24. Slide 24: Black Fox Production Summary

    Black Fox Production Summary: 25 High Grade (visible gold) Material from Remnant Mining Lower Trending Production Costs Increasing Production Near Term - Value Added Projects Extending Mine Life

  25. Slide 25: Simon Quick, Gold Bar Operations

    26 Simon Quick Vice President, Projects Gold Bar Operations

  26. Slide 26: Gold Bar Project

    Gold Bar Project 27 Gold Bar Area Shown Nevada USA Las Vegas Reno Eureka Elko

  27. Slide 27: Gold Bar Project: Next Mining Operation

    Gold Bar Project 28 McEwen Mining’s Next Mining Operation, Nevada USA $55MM Spent to Date Construction Completion in 2018 First Gold Scheduled for Q1, 2019 On Schedule for 55,000 oz Gold in 2019, 60,000 oz Gold 2020

  28. Slide 28: Gold Bar: General Site Layout

    29 Gold Bar: General Site Layout Power Generation Plant Process Ponds Gold Recovery Plant Crusher & Overland Conveyor Heap Leach Pad

  29. Slide 29: Gold Bar: Construction Progress

    Gold Bar: Construction Progress On Schedule & Budget 30 Gold Recovery Plant 45% Complete Crushing Plant 70% Complete

  30. Slide 30: Gold Bar: Construction Progress

    Gold Bar: Construction Progress 31 Power Generation Plant 65% Complete Heap Leach Pad 85% Complete

  31. Slide 31: Gold Bar: Gold Pick & Cabin Deposit Development

    Gold Bar: Gold Pick & Cabin Deposit Development Commercial Production Q1 2019, Forecasting 55,000 Gold oz in 2019 32 Ore Stock Pile First Ore Bench, Cabin Pit Crusher

  32. Slide 32: Gold Bar Resource Growth

    Gold Bar Resource Growth: Property Purchase + Mine Exploration Mine Life Extension: Goal is a 10 Year Operation 33 MUX Property Outline 2015 $450,000 Ind. 100,000 oz Gold ~$15MM cashflow1 2017 $2MM M&I 92,000 oz Gold Inf. 82,000 oz Gold ~$25MM cashflow1 1 Assumes 75% recovery & $200 operating margin

  33. Slide 33: Resource Evolution at Gold Bar

    Resource Evolution at Gold Bar: Growth! 34 FS1 Gold Bar South Purchase2 Model Optimization3 Exploration Now 4 Measured & Indicated 611 101 18 92 822 Inferred 111 5 4 82 202 1 NI 43-101 Technical Report Gold Bar Project Feasibility Study, Eureka County, Nevada, Dec 6, 2015. 2 McEwen Mining Acquires P

  34. Slide 34: Gold Bar: Near Pit Resource Expansion

    Gold Bar: Growth Opportunities: Near Pit Resource Expansion Updated Mine Plan Q1, 2019 Old Resource Estimate New Resource Estimate New Pit Growth

  35. Slide 35: Gold Bar: Near Pit Resource Expansion

    Gold Bar: Growth Opportunities: Near Pit Resource Expansion Updated Mine Plan Q1, 2019 Old Resource Estimate New Resource Estimate New Pit Growth

  36. Slide 36: Working Smarter in Nevada

    Working Smarter in Nevada: Utilizing Technology To Maximize Recovery Heap Leach Pad Sensors 37 Recovery % Data Measured: [Moisture, Drip Tube Coverage]

  37. Slide 37: Exploration

    38 Sylvain Guerard Senior Vice President, Exploration Exploration

  38. Slide 38: Exploration: Key Component of Vision & Strategy

    San José Argentina Black Fox Canada Los Azules Argentina El Gallo Mexico Gold Bar Nevada Exploration 39 Key component of McEwen Mining’s Vision & Strategy Focus Timmins & Nevada Black Fox & Gold Bar upside potential

  39. Slide 39: Black Fox Complex

    Acquisition October 2017 1 Mine, 1 Mill +1.2Moz Au Indicated resource Exploration potential Black Fox Complex 40 All the right ingredients: Under-explored High grade & high gold endowment 4 deposits (different structures) Gold hosted in all type of rocks BF Mine Stock Mill +70Moz gold

  40. Slide 40: Black Fox Complex Progress

    Black Fox Complex 41 Oct 2017 Acquisition 1 Mine, 1 Mill +1.2Moz Au resource Exploration potential Progress Budget & Team Geology & targets definition (workshops) Black Fox & Stock Exploration system Drilled 80,000m YTD

  41. Slide 41: Black Fox Complex 2018 YTD Results

    Black Fox Complex 42 Oct 2017 Acquisition 1 Mine, 1 Mill +1.2Moz Au resource Exploration potential 2018 YTD Results Black Fox (Indicated Resources): Tamarack: 127Koz @ 5.08g/t AuEq Froome: +22Koz @ 5.09g/t Au Stock East (Inferred Resources): Open Pit: 40Koz @ 1.58g/t Au Undergound: 73Koz @ 3.85g/t A

  42. Slide 42: Gold Bar - Exploration

    Gold Bar - Exploration 43 Exploration reactivated Q4 2017 Main objectives: Extend Mine Life (near-pit resources, Gold Bar South, waste dumps) Make new discoveries (team, data, drilling for oxide & sulfide)

  43. Slide 43: McEwen Mining Exploration

    McEwen Mining Exploration 44 Excellent progress & results on key projects Right team, right approach, right places Destor Porcupine Fault Stock Mine Stock East Stock Gap Froome Black Fox Tamarack Black Fox Pike River Gibson Gibson SW 147 NE Froome FW Gold Pick Cabin Creek Gold Ridge Gold Bar

  44. Slide 44: Black Fox Exploration

    45 Ken Tylee Exploration Manager - Black Fox Black Fox Exploration

  45. Slide 45: Black Fox & Stock Mine Properties 2018 Exploration Update

    46 Black Fox & Stock Mine Properties 2018 Exploration Update 46

  46. Slide 46: Black Fox & Stock – Summary of 2018 Activities

    ADDITION of 22k OZ Au Resources at Froome UPDATED 127k OZ AuEq Resources at Tamarack NEW 114k OZ Au Resource at Stock East Zone 300% Increase over Previous Exploration Levels 9 NEW Gold Occurrences Black Fox & Stock – Summary of 2018 Activities 47 Excellent Progress Visible Gold 1Resource & reserves

  47. Slide 47: Short Drive from the Famous Porcupine Mining Camp

    Short Drive from the Famous Porcupine Mining Camp 48 Stock Taylor Matheson Destor-Porcupine Fault Lexam Black Fox Timmins Timmins-Matheson Region +70Moz gold

  48. Slide 48: Stock Mine/Mill Great Location

    Stock Mine/Mill Great Location The Key: Numerous Generations of Structural Preparation & Fluid Entry Black Fox Mine 49

  49. Slide 49: Black Fox Mine Site: Limited Exploration pre-MUX

    Black Fox Mine Site: Limited Exploration pre-MUX Restricted to 3 Clusters High-Definition Infill ONLY 6 Owners since 1990 Large Gaps within fertile Structural Corridors Froome 2016: $4.65M USD spent 300 DDHs = 159k OZ Grey Fox 2008-2014 1050 DDHs = 465k OZ Black Fox Mine 576k OZ @ 7.9 g/t Au 50

  50. Slide 50: Black Fox Mine - Underground

    1-2 rigs throughout 2018 Devoted to Converting Resources to Reserves 26,000m Drilled YTD Black Fox Mine - Underground JOB #1: EXTEND LIFE of MINE Remaining Resource Blocks >10 g/t Au

  51. Slide 51: Growing Resources Adjacent to Operations

    Gibson-Kelore structure Black Fox structure GROWING RESOURCES ADJACENT TO OPERATIONS Top 3 Targets: 1) In-Mine = Deep Central Zone 2) Tamarack = Base Metal – Gold 3) Froome Area = Expansion A simple plan for 2018: GRAB the Opportunities! Black Fox MINE 1 2 3 52

  52. Slide 52: Longitudinal Section - Looking NE

    Longitudinal Section - Looking NE 7.24gpt Au / 3.9m 4.5gpt Au / 3.79m 21.6gpt Au / 0.8m ~800m DCZ HQV FW CENTRAL Froome Resource Reserve Mined out 2015-2016 Focus = 159K Oz @ 5.26 g/t Au Historic UG Exploration rarely 100m ahead of Mining faces BLACK FOX Mine before McEwen 53

  53. Slide 53: Verified Down-Plunge Extensions

    Verified Down-Plunge Extensions: High Quartz Zone Deep Central Zone Still OPEN to Depth Longitudinal Section - Looking NE Resource Reserve Open Pit 1) Black Fox – UNDERGROUND 54 55.1gpt Au / 1.2m 44.4gpt Au / 7.5m 141.2gpt Au / 2.4m 320.7gpt Au / 0.6m 1-2 rigs devoted to Exploration: 21,000m UG Dril

  54. Slide 54: Black Fox Mine Site: Growing Resources in 2018

    Open Pit Black Fox Mine Site: Growing Resources in 2018 – UNDERGROUND 55 55.1g/t Au / 1.2m a) Expand Hi-Grade Resources by YE b) Explore Down-Plunge Extensions in 2019 Excavation of 810mL Drill Drift now UNDERWAY 12-Hole INFILL drilling >Sept 15th Deep Central Zone: ~120m strike * 200m vertical ~730

  55. Slide 55: Tamarack multi-metal

    2) Tamarack multi-metal A Unique Opportunity <50 DDH 2004-2016 Gold-Silver Lead-Zinc 500m East of Main Ramp upper lens w/in 200m of Surface #18BF-636: 22.2 g/t Au & 20.5 g/t Ag over 1m CL -100m Vertical #17BF-621: 9.46 g/t AuEq over 3m CL from 7.5% Zn, 5%Pb & 92 g/t Ag -150m Vertical 56

  56. Slide 56: Tamarack

    Black Fox Mine Ramp FIRST MUX RESOURCE SRK Consulting, May‘18: 127Koz @ 5.08 g/t Au Equivalent Metallurgical Studies Underway 2) Tamarack Taking Advantage of an over-looked opportunity to ADD multi-metal revenues 57

  57. Slide 57: Black Fox Mine Site: 2019 Search for Replicas

    Black Fox Mine Site: 2019: Search for Replicas Intense metal enrichment in structurally-controlled contact zone Gibson-Kelore structure Black Fox MINE Black Fox structure 58

  58. Slide 58: Growing the Profitability of the Froome Deposit

    3) Growing the Profitability of the Froome Deposit: 22K OZ Expansion of Froome & Addition of FW Occurrence Froome FW Zone 116.6g/t Au / 4.5m CL Conceptual development NEW ! Froome’s Indicated Resource = 181k OZ @ 5.1 g/t Au Looking to NW 59

  59. Slide 59: Growing Profitability of the Froome Deposit

    150m NE of Expanded Froome resources 3) Growing Profitability of the Froome Deposit #663: 7.9 / 4m CL @ -45m Vertical #G279: 53.93/9.9m CL Inc. 116.6/4.5m CL @ -75m Vertical Froome Deposit: 181K Oz @ 5.1 g/t Au 60

  60. Slide 60: Black Fox Surface Exploration

    Black Fox Surface Exploration: Limited Exploration pre-MUX – Restricted to 4 Clusters 22 Sites Prioritized Large Gaps within fertile Structural Corridors Froome 2016 Grey Fox 2008-2014 1050 DDHs 61

  61. Slide 61: Property-Scale Exploration: Aggressive Targeting

    PROPERTY-SCALE exploration: Aggressive Targeting simple YES/NO Assessment by Drilling Results-Driven follow-up 9 Surface Rigs 64,000m drilled YTD 30,000 samples shipped Gibson-Kelore structure Black Fox structure 62

  62. Slide 62: Property-Scale Exploration: Successful 1st Pass

    Black Fox MINE Froome Resources Tamarack BM-Au PROPERTY-SCALE exploration: Successful 1st Pass ! ADDITIONAL Drilling Required Gibson-Kelore structure 7 NEW Gold Occurrences! follow-up planned QTR-4 and 2019 Grey Fox Resources 63

  63. Slide 63: New Zones of Gold Mineralization in 2018

    Property-Scale Exploration: 4 NEW Zones of Gold Mineralization in 2018 Gibson-Kelore structure GIBSON Deep PIKE RIVER GIBSON SW Black Fox MINE Black Fox structure 147 NE Zone 64

  64. Slide 64: Site-Wide Exploration: Gibson SW

    Site-Wide Exploration 1) GIBSON SW 200m off of the known Corridor DDH #1062: 639gpt Au / 1.2m CL at 79m Depth Gibson SW 639gpt Au / 1.2m CL Structure is OPEN in all directions 65

  65. Slide 65: Site-Wide Exploration: Pike River

    Site-Wide Exploration: 2) PIKE RIVER Shallow High-grade Intercept Another Over-Looked Opportunity 18PR-032: 35.03/3.3m CL Incl. 50.85/2m CL DDH #18PR-032: 35.03 g/t Au over 3.3m at 70m Depth 4 consecutive samples: 21.5 / 80.2 / 6.55 / 15.55 g/t Au Structure is OPEN in all directions 66

  66. Slide 66: Site-Wide Exploration: NE Zone

    Black Fox MINE Site-Wide Exploration: 3) 147 NE Zone SHALLOW Vein Set – perpendicular to typical Grey Fox orientation 17 new Intercepts over 140m Strike at 3-125m Vertical Depth Potential Ramp Access Adjacent to 466k OZ Resources at Grey Fox 16.11 g/t over 3m CL 147 NE Zone: 16.11 / 3m CL 4.26 / 8m

  67. Slide 67: Site-Wide Exploration: Gibson Deep

    Bulk Zone @ -500mL: 3.1/34m CL incl. 9.7 / 7m 3.1 g/t Au over 34m CL at 500m Depth Hi-Grade center zone: 9.7 g/t over 7m CL Site-Wide Exploration: 4) GIBSON Deep: NEW style of deep BULK Mineralization Structure is OPEN in all directions 68

  68. Slide 68: Surface Exploration Drilling at Stock

    Surface Exploration Drilling at STOCK: 10,000m (original) 22,800m (YTD) 25,000 (YE estimate) Stock Mine/Mill Ideal Setting All the Ingredients for Discovery 69

  69. Slide 69: Stock: Significant Mineralization Confirmed

    DEEP Mine Gap Stock EAST 2km 137k OZ Past Production avg 5.5 g/t Au STOCK: Significant mineralization confirmed 70

  70. Slide 70: Excellent Drill Results YTD

    Excellent drill results YTD: Over 2km strike length New style of Porphyry-Hosted mineralization south of main Volcanic system Gap Stock East 4.82gpt Au / 16.3m Inc. 19.23g/t Au / 2.9m 2.38gpt Au / 20.4m Inc. 3.89g/t Au / 9m 3.05g/t Au / 14m CL Inc. 9.51g/t Au / 1m & 4.02g/t Au / 6.5m 10.85g/t Au / 1

  71. Slide 71: Gap Stock East Inferred Resource

    Gap Stock East Inferred Resource Sept. 5 10.85g/t Au / 1m Porphyry 0.92g/t Au / 33.1m 5.58g/t Au 3.30m Inc. 14.80g/t Au / 1m 7.01g/t Au / 3.80m Inc. 30.10g/t Au / 0.80m Stock Deposit Au gxm Range 0.78g/t Au / 35.1m >10 gxm contour gxm = grade x thickness O/P Inferred (0.25 g/t cut): 40k OZ Au avg 1.

  72. Slide 72: Plenty of Room to Advance & Grow Resources

    Plenty of Room to Advance & Grow Resources Gap Stock East Stock Deposit - Infill Drilling UNDERWAY Au gxm OPEN OPEN gxm = grade x thickness Stock Property – Expand Opportunities! 73

  73. Slide 73: Depth of Archean Gold Deposits

    Depth of Archean Gold Deposits 74 “Kilometric” vertical continuity Black Fox & Stock Low exploration maturity level Still early days Core display 1,000m 2,000m Black Fox Williams Golden Giant David Bell HG Young Campbell Red Lake Macassa Kirkland Teck Hughes Lake Shore Wright- Hargreaves Sylvanite T

  74. Slide 74: Excellent Progress in only Months

    Excellent Progress in only 8 Months 75 127k OZ AuEq Indicated Resource at TAMARACK Expanded FROOME’s Indicated Resources by 22k OZ Au NEW Inferred Resources at STOCK = 114k OZ Au Rapid Escalation to 11 Rigs Focused on Results-Driven Exploration 9 New Gold Occurrences YTD Numerous High-Quality target

  75. Slide 75: Gold Bar Exploration

    76 Charles Sulfrian Exploration Manager, Gold Bar Gold Bar Exploration

  76. Slide 76: Gold Bar Mine - A Carlin Gold Deposit on the Cortez Trend

    Cortez Trend Gold Bar Mine - A Carlin Gold Deposit in the heart of the Cortez Trend 77 Jerritt Canyon Goldstrike/Meikle Carlin Gold Quarry Pipeline Cortez Hills Four Mile/ Goldrush Ruby Hill Twin Creeks Getchell/ Turquoise Ridge Gold Bar Carlin Trend Getchell Trend Carlin Type Deposit Highways > 200

  77. Slide 77: Gold Bar Project vs. Cortez Complex

    MUX Tonkin 1.6Moz MUX Gold Bar 0.73Moz Cortez Fault Gold Bar Project vs. Cortez Complex 78 Along the same “trend” Equivalent host rocks Alteration & mineralization Proximity to intrusions Multiple stratigraphic horizons Gold Bar deep exploration potential remains untested Cortez Hills Barrick 50Moz

  78. Slide 78: Gold Bar Project vs. Cortez Complex

    MUX Tonkin 1.6Moz MUX Gold Bar 0.73Moz Cortez Fault Gold Bar Project vs. Cortez Complex 79 Along the same “trend” Equivalent host rocks Alteration & mineralization Proximity to intrusions Multiple stratigraphic horizons Gold Bar deep exploration potential remains untested Cortez Hills Pipeline Fourm

  79. Slide 79: Gold Bar Exploration: 2018 H1 Program

    Gold Bar Exploration: 80 2018 H1 Program brought all the pieces together: Extension of known deposits Pit Delineation New gold targets both shallow and deep Target-Rich Environment Top of Gold Pick Pit looking SE towards Cabin Creek and ML Gold Pick Pit Cabin Creek ML Gold Bar South

  80. Slide 80: Gold Bar – H1 2018 Exploration Reactivation Results

    Gold Bar – H1 2018 “Exploration Reactivation” 81 Results Drilling Phase 1 13,000 m RC drilling Positive drill intersections Near-pit resource expansion of 60,000 oz (M & I plus Inf) LOM extension: Resource upgrade & Gold Bar South Fault Fault Gold Bar South Ind. 101 koz Au Phase 1 2.1 g/t Au / 38.1m

  81. Slide 81: Potential for Discovery: Priority Areas

    Potential for Discovery: Priority areas 5 km each Wall Fault Roberts Creek Fault 5 km 5.5 km Gold Bar – H1 2018 “Drill Target Definition” Gold Bar South Ind. 101 koz Au Gold Bar M&I 629 koz Au 82 MUX Property Outline Fault Priority Area Axis of Anticline

  82. Slide 82: Potential for Discovery

    Potential for Discovery Wall Fault Roberts Creek Fault 5 km 5.5 km Gold Bar – H1 2018 “Drill Target Definition” Gold Bar South Ind. 101 koz Au Gold Bar M&I 629 koz Au 83 MUX Property Outline Fault Priority Area Axis of Anticline H1 Program Included: Geochemical Surveys Geophysical Surveys Geologic M

  83. Slide 83: Potential for Discovery: Target Areas

    Potential for Discovery: Target Areas: ML Wall Fault Roberts Creek Fault Gold Bar – H1 2018 “Drill Target Definition” ML 84 MUX Property Outline Target Area Fault Axis of Anticline

  84. Slide 84: ML Cross Section

    Cross Section Secondary Down-Dip Target Area (Red dashed line) Roberts Creek Fault Zone Primary ML Target Area - Outcropping Alteration & Mineralization 1. ML - Shallow Oxide Targets Along NNW-SSE fault Surface mineralization Target outcrops & extends down dip Never drilled 400 m 800 m 85

  85. Slide 85: ML - Shallow Oxide Targets

    1. ML - Shallow Oxide Targets Roberts Creek Fault Zone W ML Cross Section Looking north Similar Hosts Rock to other deposits Drilling to start early – mid-September Secondary Down Dip Target Zone Never drilled before 400 m meters E 0 150 300 86 Primary Target Area

  86. Slide 86: Potential for Discovery: Target Areas ML, Cabin Creek

    Gold Bar – H1 2018 “Drill Target Definition” 87 Potential for Discovery: Priority areas >5 km each Target Areas: ML Cabin Creek Drilling started mid-August at Cabin Creek Wall Fault Roberts Creek Fault Cabin Creek MUX Property Outline Target Area Fault Axis of Anticline

  87. Slide 87: Cabin Creek - Extending Mineralization

    2. Cabin Creek - Extending Mineralization 88 Along NE-SW trend Open along strike & down dip Targets extensions to mineralization or gaps in drilling Cabin Creek Designed Pit 600 m Orebody Current Drilling Deposit Open Target Area (no drilling)

  88. Slide 88: Cabin Creek - Extending Mineralization

    2. Cabin Creek - Extending Mineralization 89 Higher grades within known oxide deposit may extend beyond deposit 600 m Current Drilling Deposit Open Target Area (no drilling) 3.03 g/t Au / 16.6 m oxide 7.55 g/t Au 6.81 g/t Au 5.15 g/t Au 6.95 g/t Au

  89. Slide 89: Gold Bar South Development & Exploration

    Roberts Creek Fault Zone 300 m 1.0 Km 800 m Gold Bar South Deposit 3. Gold Bar South Development & Exploration 91 Deposit is open along strike and at depth Good results away from projected pit Deeper drilling planned on new targets Line 26 Target Area Fault

  90. Slide 90: Gold Bar South Development & Exploration

    Line 26 Roberts Creek Fault Zone 300 m 1.0 Km 800 m Gold Bar South Deposit 3. Gold Bar South Development & Exploration 92 Deposit is open along strike and at depth Good results away from projected pit Deeper drilling planned on new targets Target Area Fault

  91. Slide 91: Potential for Discovery: Deep Targets

    Gold Bar – H1 2018 “Drill Target Definition” 93 Potential for Discovery: Priority areas >5 km each Target Areas: ML Cabin Creek Gold Bar South Deep Targets Wall Fault Roberts Creek Fault Deep Target Zones Drill Hole MUX Property Outline Target Area Fault Axis of Anticline

  92. Slide 92: Deep Targets

    Typical sulphide mineralization targeted. From the Cabin Creek area. 4. Deep Targets 94 Over 10 Km strike length of deep targets remain unexplored Deeper, Higher Grade Deposits are Typical of Carlin Systems 8.55 g/t Au 9.98 g/t Au Proposed core holes

  93. Slide 93: Target Rich Environment

    Gold Bar – H1 2018 “Drill Target Definition” 95 Target Rich Environment Potential for Discovery: Priority areas >5 km each Drilling these targets may: Extend mine life Result in a deep, large discovery Wall Fault Roberts Creek Fault Deep Target Zones Gold Bar South ML Cabin Creek MUX Property Outlin

  94. Slide 94: McEwen is just scratching the surface

    Cortez Hills > 10 Million Ounces Gold Gold Bar Goldstrike > 50 million Ounces Gold McEwen is just scratching the surface ? 0 m -300 m -600 m -900 m Targets for deeper large higher-grade discoveries 96 Shallow Oxide Deposits Deeper Higher Grade Deposits Deeper Higher Grade Deposits

  95. Slide 95: Timmins (Lexam) Properties

    97 Nigel Fung Director, Mine Planning Timmins (Lexam) Properties

  96. Slide 96: Properties in Timmins District

    Properties in Timmins District 98 Tahoe Resources Goldcorp McEwen McEwen 1 3 2 4 Timmins- Matheson Region +70Moz gold2 Timmins (Lexam) Projects 1. Fuller 2. Davidson Tisdale 3. Paymaster 4. Buffalo-Ankerite Open Pit & Underground Resource1 M&I: 1,468,500 oz Au Inferred: 954,200 oz Au 1NI 43-101 Reso

  97. Slide 97: Properties in Timmins District

    Properties in Timmins District 99 Tahoe Resources Goldcorp McEwen McEwen 1 3 2 4 Timmins Timmins- Matheson Region +70Moz gold Timmins Projects 1. Fuller 2. Davidson Tisdale 3. Paymaster 4. Buffalo-Ankerite 1. Additional Mill Feed 2. Reduce Cost per Ounce 1NI 43-101 Resource, 2013, see www.mcewenmini

  98. Slide 98: Fuller Is a Real Gift

    Properties in Timmins District 100 Tahoe Resources Goldcorp McEwen McEwen 1 3 2 4 Timmins- Matheson Region +70Moz gold FULLER IS A REAL GIFT Goal is to start Mining in 2021 2 4 Dome Mine Timmins

  99. Slide 99: Fuller Site Today

    101 Fuller Site Today Access Road Ventilation Raise FUNCTIONAL PORTAL & RAMP EXISTING INFRASTRUCTURE LEFT BEHIND IS A REAL GIFT Aerial Photo

  100. Slide 100: Fuller Mine – Ramp & Existing Underground Workings

    102 FULLER MINE – RAMP & EXISTING UNDERGROUND WORKINGS >5km of Existing Development into Mineable Stopes

  101. Slide 101: Fuller Site During Operations

    103 Fuller Site During Operations 1986-1989: Operations Halted due to Financial Difficulty – Stopes Left Ready to Mine Portal Power Maintenance Shop

  102. Slide 102: Fuller Mine – Longitudinal Stope Sections

    FULLER MINE – LONGITUDINAL STOPE SECTIONS Map Circa 2000 & 2008 Existing Ramp 150’ Level Existing Level Development & Sills 275’ Level 375’ Level 500’ Level 600’ Level 650’ Level STOPE STOPE STOPE STOPE STOPE STOPE STOPE Portal STOPE STOPE

  103. Slide 103: Adrian Blanco, Mexico

    105 Adrian Blanco General Manager, Mexico Mexico

  104. Slide 104: Fenix Project

    Fenix Project Long Mine Life of 12 years. Low Capital Investment – Total of US$ 71 million. NPV5% of $60M & IRR after-tax of 28%. Sinaloa State Mexico El Gallo District & Fenix Project NPV and IRR from Preliminary Economic Assessment (PEA) Base Case using $1,250/oz Au and $16/oz Ag. Published Jul 9,

  105. Slide 105: Fenix Project: 12 Year Mine Life

    7 km MUX Property Outline Fenix Project Palmarito El Gallo Silver El Encuentro El Gallo Silver 9 km 2 km ? ? El Gallo Gold Mine 8 km Fenix Project : 60% Silver + 40% Gold El Gallo Gold mine 500m 250m 0m -250m Fenix Project – 12 Year Mine Life Project Sequence: Phase 1 : El Gallo Gold Heap Leach Re-P

  106. Slide 106: Fenix Project Phases and CapEx

    Phase 1 – El Gallo Gold - CapEx $41M. 1/3 of gold remaining in existing heap leach. Re-process the heap leach material through a traditional CIL (Carbon-In-Leach) Mill circuit. Phase 2 – El Gallo Silver and other 3 Deposits - CapEx $30M. El Gallo Silver --> Palmarito --> El Encuentro --> Carrisalejo

  107. Slide 107: After-Tax Financials

    After-Tax Financials USD Downside Case $1,150 / oz Gold $14.5 / oz Silver Current Prices Case $1,200 / oz Gold $15 / oz Silver Base Case from 2018 PEA $1,250 / oz Gold $16 / oz Silver Phase 1 CapEx $41 M $41 M $41 M Phase 2 CapEx $30 M $30 M $30 M IRR 19% 23% 28% NPV @ 5% Rate $34 M $44 M $60 M Payb

  108. Slide 108: Fenix Project – Conceptual In-Pit Tailings Disposal

    110 Present Day After In-Pit Tailings Deposited Fenix Project – Conceptual In-Pit Tailings Disposal Reclaimed In Pit Tailings concept being introduced in Mexico. Currently used by mining operations successfully in Australia. Benefits : Minimize enviromental impact on surface landscape. Maximize re-u

  109. Slide 109: Next Steps: Fenix Project

    Next Steps : Preliminary Economic Assessment (PEA) was completed July 9th 2018. Permits expected : Phase 1 in Q1 2019, Phase 2 in Q2 2020. Feasibility Study in Q2 2019. Target Construction Decision for Phase 1 in Q4 2019. Fenix Project – Silver & Gold Fenix Mexico 111

  110. Slide 110: Los Azules

    112 Donald Brown Senior Vice President, Projects Los Azules

  111. Slide 111: The Los Azules Copper Project is located in Argentina

    The Los Azules Copper Project is located in Argentina 113 McEwen Mining 100% Owns the Los Azules Copper Project, One of the world's largest undeveloped, higher-grade, open pit copper deposits Project Engineering Permitting 20.1% IRR $2.2 billion NPV McEwen Mining - Focus on Growth in the Americas Lo

  112. Slide 112: In a Nutshell – The Los Azules 2017 PEA

    In a Nutshell – The Los Azules 2017 Preliminary Economic Assessment (PEA) 114 Attributes: Compelling Financials World Class Copper Producer for 38 years Mining Operations in Argentina Project and Operational Logistics through Chile Main Concerns: Needs De-Risking Access Challenged Power Supply Chall

  113. Slide 113: Compelling Financial Attributes

    Compelling Financial Attributes 115 IRR 20.1 % - Assumes Copper at $3.00/lb NPV8% $2.2 billion Peak Capex $2.4 billion Capex Payback Period 3.6 years – from early higher grade ore C1 Costs $1.13 / lb for first 13 years Operating Life 38 + years Ore Throughput 80,000 tpincreasing to 120,000 after 5 y

  114. Slide 114: Compelling Financial Attributes

    Compelling Financial Attributes 116 IRR 20.1 % - Assumes Copper at $3.00/lb NPV8% $2.2 billion Peak Capex $2.4 billion Capex Payback Period 3.6 years C1 Costs $1.13 / lb for first 13 years Operating Life 38 + years Ore Throughput 80,000 tp increasing to 120,000 after 5 years. Low Stripping Ratio of

  115. Slide 115: Compelling Financial Attributes

    Compelling Financial Attributes 117 IRR 20.1 % - Assumes Copper at $3.00/lb NPV8% $2.2 billion Peak Capex $2.4 billion Capex Payback Period 3.6 years – from early higher grade ore C1 Costs $1.13 / lb Low Stripping Ratio of 1 : 1 Operating Life 38 + years Ore Throughput 80,000 tpd increasing to 120,0

  116. Slide 116: Los Azules: World Top 25 Copper Producer

    Extract from the 2017 Los Azules Preliminary Economic Assessment : Los Azules Copper Project will be a World Top 25 Copper Producer 118 186,000 tpa Copper in Concentrates

  117. Slide 117: Los Azules: Lowest Cost Quartile Copper Producer

    119 Extract from the 2017 Los Azules Preliminary Economic Assessment : Los Azules Copper Project will be a Lowest Cost Quartile Copper Producer C1 = $1.13c / lb

  118. Slide 118: Analysts are awakening to the Los Azules Copper Project

    Analysts are awakening to the Los Azules Copper Project Draft Evaluation by Goldman Sachs 120 High Quality Financials IRR = 24% Infrastructure Concerns Argentina Country Concerns NPV = $2.9billion

  119. Slide 119: Los Azules Advancing Up the Value Curve

    Los Azules Copper Project is Advancing Up the Value Curve Phase 1 $ VALUE Resource Upgraded to Indicated Project De-Risking Project & Financial Definition Publication of 2017 PEA Develop Environment Permit Project Enhancements Infill Drilling 2018 2017 “Next Steps” for 2017 & 2018 Project De-Risking

  120. Slide 120: Project De-Risking - Panorama of Site

    Project De-Risking - Panorama of Los Azules Copper Project site. A Natural Elevated Site for the Concentrator Facility in Proximity to the Open Pit Mine The Elevated Site Enables the Gravity Deposition of tailings for the Life of Mine Elevated Process Facility Platform Open Pit Mine 122

  121. Slide 121: Project De-Risking - Primary Crusher

    Project De-Risking The Primary Crusher near the Mouth of Mine for Optimal Truck Haulage Linked to the Process Facility by an Elevated Overland Coarse Ore Conveyor Elevated Process Facility Platform Open Pit Mine Coarse ore Overland Conveyor Primary Crusher 123

  122. Slide 122: Project De-Risking - Proposed Tailings Dam

    Project De-Risking The Proposed Tailings Dam – Closes the Watershed. Sealing the Mine and Mine Facilities from the Natural Environment. Delivers Excellent Robust Environmental Security Elevated Process Facility Platform Open Pit Mine Coarse ore Overland Conveyor Primary Crusher Tailings Dam 124

  123. Slide 123: Project De-Risking - Waste Rock Storage Facility

    Project De-Risking The Waste Rock Storage Facility is in Proximity to the Mine. All project drainage including any Acid Mine Drainage reports by gravity to the Tailings Storage Facility as Process Water. Elevated Process Facility Platform Open Pit Mine Coarse ore Overland Conveyor Primary Crusher Ta

  124. Slide 124: Project Facilities - Superior Attributes

    Project Facilities - Superior Attributes 126 Compact Footprint – Optimal for Materials Handling Primary Crusher located alongside the Mouth of Mine Elevated Concentrator Plant – Enables Gravity Deposition of Tailings Water Supply from within the Project Footprint All contact water reports by gravity

  125. Slide 125: Next Steps - Project Re-Risking

    Next Steps 1 - Project Re-Risking 127 Objective : Confirm the Proposed Los Azules Facility Layout is Viable 70+ Geotechnical Investigation Drill Holes - completed In-Situ Geotechnical Testing - completed 24 Seismic Lines - completed Geological Mapping - completed at the sites Photogrammetry & Survey

  126. Slide 126: Next Steps – Project Enhancements

    Next Steps 2 – Project Enhancements 128 ARGENTINA Define an Airstrip Evaluate a New Alternative All-Year Access Road Define a High Voltage Power Transmission Route CHILE Define the Project Logistics through Chile – large equipment imports – copper concentrate exporting Develop the Port Solution in C

  127. Slide 127: The Los Azules Airstrip Site

    The Los Azules Airstrip Site Location of Airstrip Confirmed 5 kms from the Tailings Dam and 2kms from the Camp Survey Completed Preliminary Designs Completed Permitting Commenced Detailed Engineering in 2019 Commencement of Airstrip Formation Works in 2019 or 2020 129

  128. Slide 128: Northern Access Route to Los Azules

    Northern Access Route to Los Azules Photogrammetry Expeditions on Horseback Helicopter Reviews A Low-Altitude Route within a Deep Valley Only 1 river crossing 20kms of Challenging Terrain 70kms Straightforward Terrain All Year Access Confirmed by Satellite Imagery Confirmed as the New Access into Lo

  129. Slide 129: High Voltage Power Transmission Line Solution

    High Voltage Power Transmission Line Solution Follows the Northern Access Route A Low-Altitude Route within a Deep Valley No High Mountain Passes 30 kms shorter Straightforward to construct in close proximity to future Northern Route Access Transmission Line Connects to Existing Substaion. Confirmed

  130. Slide 130: Chile Freight & Copper-Concentrate Logistics

    132 Chile Freight & Copper-Concentrate Logistics. Final Road Alignment Defined after detailed site reviews and stakeholder interfaces. 50% National Highway 25% Improved Regional Roads 25% Track Upgrades through Private Lands Framework Agreement in progress with Regional Authorities

  131. Slide 131: Objective: Complete Permitting

    Objective : Complete Permitting Los Azules to revise from Exploration Permit to Exploitation Permit Environmental Baseline Studies – 98% completed Archaeology Clearances – 95% completed Geotechnical Investigations - completed Preliminary Engineering - completed Engineering for Tailings & Water Manag

  132. Slide 132: Achievements last months - Project Transforming

    Achievements last 12 months - Project Transforming ! 134 All-Year Road Access - Defined Reliable HV Power Transmission Line - Defined Airstrip - Defined Project Facility configuration - Confirmed Environmentally Security from Tailings Dam - Confirmed Superior Community Relations – Confirmed Logistic

  133. Slide 133: In a Nutshell - The Published Los Azules 2017 PEA

    In a Nutshell - The Published Los Azules 2017 Preliminary Economic Assessment (PEA) 135 Attributes Compelling Financials World Class Copper Producer for 38 years Mining Operations in Argentina Project and Operational Logistics through Chile Main Concerns: Needs De-Risking COMPLETED Access Challenged

  134. Slide 134: In a Nutshell - The Published Los Azules 2017 PEA

    In a Nutshell - The Published Los Azules 2017 Preliminary Economic Assessment (PEA) 136 Attributes Compelling Financials World Class Copper Producer for 38 years Mining Operations in Argentina Project and Operational Logistics through Chile Main Concerns: Needs De-Risking COMPLETED Access Challenged

  135. Slide 135: Los Azules - The Next Months

    Los Azules - The NEXT 12 months 137 Commence Northern-Access Pioneer Road Formation Complete Environmental Permit Application Receive the Permit Detailed Design of Northern Access and Power Transmission Line Develop Power Supply Agreement Continue Evaluating Value Adding opportunities, there are sev

  136. Slide 136: Value-Adding Will Continue for Los Azules in 2019 and 2020

    Value-Adding Will Continue for Los Azules in 2019 and 2020 $ VALUE Power and Access Solutions Permitted Pay-back Pit Upgraded to Measured Category EIA Permit Received = Project Certainty 25,000m Infill Drilling = Early Resource Certainty Front End Engineering = Scope Certainty Early Works Commenced

  137. Slide 137: Pre-production transactions for Base Metal assets since 2015

    Pre-production transactions for Base Metal assets since 2015 30 billion lbs Contained Copper $0.01 / lb $0.02 / lb $0.03 / lb Potential Transaction Range $300 million $600 million $900 million Los Azules Intrinsic Value Benchmarking 139

  138. Slide 138: Nathan Stubina, Innovation

    140 Nathan Stubina Managing Director, Innovation Innovation

  139. Slide 139: Nathan Stubina, Innovation

    Nathan Stubina Managing Director, Innovation Innovation 140

  140. Slide 140: Research is the transformation of $ into knowledge

    Research is the transformation of $ into knowledge Innovation and imagination are the transformation of knowledge into $ Improvement is doing things better; innovation is doing things differently 142

  141. Slide 141: Innovation = need + idea + implementation

    Innovation = need + idea + implementation 143

  142. Slide 142: There's a myth that innovation is capital intensive

    There’s a myth that innovation is capital intensive There’s never a shortage of good ideas or creativity; innovation fails because it doesn’t get implemented 144

  143. Slide 143: This isn't a billboard. It's a power plant.

    This isn’t a billboard. It’s a power plant. mannose There’s a myth that innovation is capital intensive There’s never a shortage of good ideas or creativity; innovation fails because it doesn’t get implemented

  144. Slide 144: Improvement is doing things better. Innovation is doing things differently

    Improvement is doing things better. Innovation is doing things differently 146

  145. Slide 145: The electric light did not come from the candle

    The electric light did not come from the continuous improvement of the ¢andle. ~ Oren Harari Improvement is doing things better. Innovation is doing things differently

  146. Slide 146: Sensors, Machine Learning, AI

    Sensors Machine Learning AI 148

  147. Slide 147: Sensors, Machine Learning, AI, Digital Twins, Bioleaching

    Sensors Machine Learning AI Digital Twins Bioleaching 149

  148. Slide 148: Sensors, Machine Learning, AI, Digital Twins, Bioleaching, Tailings

    Sensors Machine Learning AI Digital Twins Bioleaching Tailings 150

  149. Slide 149: How Do You Turn A Liability Into An Asset?

    151 ? How Do You Turn A Liability Into An Asset?

  150. Slide 150: How Do You Turn A Liability Into An Asset?

    152 2012 Feasibility Study (El Gallo Ag) 2018 PEA (Fenix) Design Dry Stack TSF In-Pit Slurry TSF Initial Capex (TSF) $17,350,000 $4,650,000 How Do You Turn A Liability Into An Asset?

  151. Slide 151: How Do You Turn A Liability Into An Asset?

    153 ? How Do You Turn A Liability Into An Asset?

  152. Slide 152: 154

    154

  153. Slide 153: Estimation, Inspection and Monitoring

    Estimation Real-time, fragmentation analysis Inspection and monitoring Hyperspectral analysis 155

  154. Slide 154: Estimation, Inspection and Monitoring

    Estimation Real-time, fragmentation analysis Inspection and monitoring Hyperspectral analysis

  155. Slide 155: Innovation and imagination are the transformation of knowledge into $

    157 Innovation and imagination are the transformation of knowledge into $

  156. Slide 156: Rob McEwen, Closing Remarks, Q&A

    158 Rob McEwen Chief Owner & Chairman Closing Remarks, Q&A

  157. Slide 157: Rob McEwen, Closing Remarks, Q&A

    Rob McEwen Chief Owner & Chairman Closing Remarks, Q&A

McEwen Mining — Investor Day (September 2018) on 6ix