    Sorby Hills Lead-Silver Project Delivering Metals for a Sustainable Future 2021 AGM Presentation 26 November 2021

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Forward-Looking Statements Compliance Statement Certain statements in the presentation are or may be “forward-looking statements” and represent the The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Company’s intentions, projections,

  3. Slide 3: Calendar year 2021 in review

    Slide 3: Calendar year 2021 in review

    Calendar year 2021 in review ✓ Successful Completion of Phase IV and Phase V drilling campaigns. ✓ Interim Mineral Resource Estimate completed. ✓ Continued work towards delivering DFS in 1H CY 2022. ✓ Agreement reached with JV Partner Henan Yuguang to fast-track Mining Joint Venture Agreement. ✓ Str

  4. Slide 4: Corporate summary

    Slide 4: Corporate summary

    Corporate summary Capital structure (24 Nov2021) Share Price History Share Price A$0.345 / share 8.0 0.8 Shares on Issue 153 million shares 6.0 0.6 Market Cap A$53 million Trading Volume (M shares) Share Price (A$/sh) Debt Nil 4.0 0.4 Cash A$10.1 million (as at 30 Sep 2021) Options & Perf. Rights 2

  5. Slide 5: The Sorby Hills Pb-Ag-Zn Project – a quick recap

    Slide 5: The Sorby Hills Pb-Ag-Zn Project – a quick recap

    The Sorby Hills Pb-Ag-Zn Project – a quick recap Australia’s largest undeveloped, near-surface Lead-Silver-Zinc deposit. ▪ 75%/25% Joint Venture Partnership with China’s largest Lead smelter and Silver producer – Henan Yuguang Gold & Lead Co. ▪ 2020 Pre-Feasibility Study delivered compelling economi

  6. Slide 6: Effective and efficient resource definition

    Slide 6: Effective and efficient resource definition

    Effective and efficient resource definition Drilling by Boab Metals at Sorby Hills has delivered continued growth in Resource size and confidence. ▪ The Phase IV drilling program was primarily designed to acquire core for the DFS Metallurgical and Geotechnical test work. ▪ In addition to achieving i

  7. Slide 7: Phase V drilling program

    Slide 7: Phase V drilling program

    Phase V drilling program The Phase V Drilling Program has delivered mineralisation extensions across Sorby Hills. 59 diamond drill holes targeted mineralisation with potential to be included in to the DFS Mining Inventory and Ore Reserve Significant results include Alpha Deposit • SHDD_059: 4.5 m @

  8. Slide 8: DFS metallurgical testwork results

    Slide 8: DFS metallurgical testwork results

    DFS metallurigcal testwork results Recently finalised metallurgical testwork has confirmed high recoveries1 ▪ Some 1,420kg of core recovered from 35 HQ diamond drill holes completed during the Phase IV and V drill program utilised for testwork including: • Flotation, • Comminution, • Mineralogy, • H

  9. Slide 9: Potential increase in project scope

    Slide 9: Potential increase in project scope

    Potential increase in project scope Results from phase IV and V drilling and the DFS Metallurgical program will act as key inputs to an investigation into the potential to expand the proposed processing capacity at Sorby Hills The Sorby Hills PFS Mine Plan comprised a total of 14.8Mt ore at 4.7% PbE

  10. Slide 10: Project financing

    Slide 10: Project financing

    Project financing Boab is well progressed on preparing the Sorby Hills Project for project financing Boab has engaged BurnVoir Corporate Finance to advise on, analyse and arrange a project finance solution for the Sorby Hills Project. The Company has engaged with Australia Government financing agenc

  11. Slide 11: Sorby Hills offtake and joint venture progress

    Slide 11: Sorby Hills offtake and joint venture progress

    Sorby Hills offtake and joint venture progress Tier-1 offtakers have confirmed a strong appetite for the Sorby Hills Lead-Silver concentrate ▪ The Sorby Hills Project is located only 150km by sealed road to from the Port of Wyndham. ▪ Boab is currently in the advanced stages of a competitive offtake

  12. Slide 12: Establishing enduring legacy within the local community

    Slide 12: Establishing enduring legacy within the local community

    Establishing enduring legacy within the local community Boab is a proud corporate citizen in the Kimberley and keen to play their part in improving economic and social outcomes in the region. ▪ Sense of community plays a key role in economic and social well- being of stakeholders across the east Kim

  13. Slide 13: Milestones for the next 12 months

    Slide 13: Milestones for the next 12 months

    Milestones for the next 12 months Recent News ✓ Preliminary Offtake Soundings demonstrate strong demand for Sorby Hills Concentrate ✓ Interim Mineral Resource Estimate Increases Measured Resources tonnes by 56% ✓ Strategic Acquisition of Manbarrum Zinc-Lead-Silver Project ✓ Further mineralisation ex

  14. Slide 14: Strategic Acquisition of Manbarrum Zinc-Lead-Silver Project

    Slide 14: Strategic Acquisition of Manbarrum Zinc-Lead-Silver Project

    Strategic Acquisition of Manbarrum Zinc-Lead-Silver Project Boab has recently acquired a 100% interest in the Manbarrum Zinc-Lead-Silver Project Key highlights include: • Manbarrum is strategically located 25km east of the Sorby Hills Lead-Silver-Zinc Project. • Mineral Resources declared at two pro

  15. Slide 15: Thank you

    Slide 15: Thank you

    Thank you Simon Noon – Managing Director & CEO info@BoabMetals.com www.BoabMetals.com www.linkedin.com/company/boab-metals

  16. Slide 16: Board and management

    Slide 16: Board and management

    Board and management Experienced Board and Management with a proven track record in exploration and development. Gary Comb Simon Noon Richard Monti Andrew Parker Chairman Managing Director and CEO Non-Exec. Director Non-Exec. Director Engineer with over 30 years’ Experienced mining executive with a

  17. Slide 17: PFS capital and operating costs

    Slide 17: PFS capital and operating costs

    PFS capital and operating costs Capital Cost Estimate Operating Cost Estimate1 Capital Item A$M Cost Centre A$M A$/t ore A$/lb2 US$/lb2 Pre Production Mining 24.3 Mining 347 23.48 0.33 0.23 Process Plant incl. EPC fee 105.4 Processing 292 19.80 0.28 0.20 Infrastructure 20.5 G&A 107 7.28 0.10 0.07 Tr

  18. Slide 18: PFS life of mine metrics

    Slide 18: PFS life of mine metrics

    PFS life of mine metrics Item Unit Base Case Item Unit Base Case Economic Assumptions Cash Flow Lead Price US$/t 2,095 Lead Revenue A$M 1,422.3 Silver Price US$/oz 21.10 Silver Revenue A$M 431.1 Exchange Rate A$:US$ 0.70 Gross Revenue A$M 1,853.3 Physicals Royalties A$M (69.5) Life of Mine (LOM) Yea

  19. Slide 19: Mineral Resource Estimate - 6 April 2021

    Slide 19: Mineral Resource Estimate - 6 April 2021

    Mineral Resource Estimate - 6 April 2021 Grade Contained Metal Deposit Mt Pb Ag Pb Eq. Zn Pb Ag Pb Eq. Zn % g/t % % kt koz kt kt A 0.6 5.1 22 5.7 0.9 30 411 34 5 B 2.3 3.9 22 4.5 0.3 91 1,608 105 7 Omega 16.6 3.4 34 4.3 0.4 560 18,233 718 69 Norton 20.0 2.7 36 3.7 0.4 545 23,067 745 89 Alpha 2.0 3.1

  20. Slide 20: Current ore Reserve and PFS mine plan

    Slide 20: Current ore Reserve and PFS mine plan

    Current ore Reserve and PFS mine plan A low-risk Mine Plan underpinned by 92% Ore Reserves PFS Mining Schedule Ore Pb (%) Pb (kt) Ag (g/t) Ag (Moz) 1,200 6.0% 120 Classification Mt % kt g/t Moz 1,000 5.0% 100 Proved 6.8 4.1 275 53.0 11.5 Silver Grade (g/t) Probable 6.9 3.2 219 27.6 6.1 800 4.0% '000

  21. Slide 21: Equivalent calculation

    Slide 21: Equivalent calculation

    Equivalent calculation The contained metal equivalence It is Boab’s opinion that all elements Metal equivalents are highly dependent on the included in the metal equivalent calculation metal prices used to derive the formula. Boab formula is based on the Sorby Hills notes that the metal equivalence