[OFFICIAL] Sinking Methodology Main Shafts Excavation Diameter 7.45m min SBR Layout 10.5m max Stabiliser Diameter 6.92m min 10.5m max Total Height & Weight 65.94m 350 tonnes Support Cables & Winches 4 winches Support Cable 53mmØ Winch speed 0.2m/s 3
Slide 5: Shaft Water Cubbies
[OFFICIAL] Shaft Water Cubbies. The cubby face charged in Post blast inspection following the preparation for the second blast first successful blast within the Production Shaft
[OFFICIAL] Record Wilton breaking tunnel! Currently at ~28km Anglo American 7
Slide 9: Tunnel to shaft connection
[OFFICIAL] Tunnel to shaft connection • The TBM will stop at 29.2km around the end of April 2024 to connect the tunnel to the Lady Cross Shaft • Brokk 500 will be used for excavation • Rock anchors and sprayed concrete lining will be used for ground support • This will provide another access & egres