Aeon Metals Ltd

Aeon Metals — Investor Presentation (July 2021)

35 slides from Aeon Metals's investor presentation, Jul 5, 2021

  1. Slide 1: Aeon Metals Ltd: A Fresh Approach

    AEON METALS LTD A Fresh Approach - Expanding the Walford Creek Mineral Resources - Moving Walford Creek Cu-Co Project Towards Development - Advancing Regional Exploration with a Copper Focus July 2021

  2. Slide 2: Cautionary Statement

    2 Cautionary Statement This document dated 5 July 2021 has been prepared by Aeon Metals Limited (Aeon) for the purpose of providing a comprehensive company and technical overview to interested analysts and investors in relation to a placement and a share purchase plan. This document is not a prospec

  3. Slide 3: Investment Highlights

    Investment Highlights Applying a fresh approach to a globally significant copper and cobalt project1 Aeon Metals has significant exposure to future energy metals through its flagship Walford Creek project Significant Exposure to Copper, cobalt, zinc and nickel are key metals of a low carbon future F

  4. Slide 4: Corporate Snapshot

    4 Corporate Snapshot Price Performance (AML, Copper and Cobalt) Shareholders 250 Copper Cobalt AML 5% 200 20% 150 44% 100 50 31% 0 Jul 20 Oct 20 Jan 21 Apr 21 AML Share Price vs. Co Price vs. Cu Price (01 Sep 2017 1 July 2021) (A$ basis, Rebased to 100) OCP Asia Retail Institutions Management (Past

  5. Slide 5: Aeon Metals Limited Board

    5 AEON METALS LIMITED BOARD CHAIRMAN, PAUL HARRIS (since December, 2014 - Sydney) s on strategy, mergers and acquisitions, and capital markets, including as Managing Director Head of Metals and Mining at Citi and previously Merrill Lynch. Mr. Harris has a Master of Engineering (Mining) and a Bachelo

  6. Slide 6: Extensive Queensland Tenement Package

    6 Extensive Queensland Tenement Package Flagship Walford Creek Project and 4,445km2 of base metal exploration tenements Projects Walford Creek Project (100%) World class copper province >80,000m drilling over past 5 years ~44Mt polymetallic Mineral Resource underpins development Significant near res

  7. Slide 7: Walford Creek Project Milestones

    7 Walford Creek Project Milestones 100% owned, extensive resource drilling, robust scoping study results, PFS underway History 1985 1996: WMC ~100 RC, RC/DD and DD holes (~15,000m) 2004 2006: Copper Strike model Cultural heritage issues 2009 2013: Aston Metals JV partial earn-in followed by 100% buy

  8. Slide 8: 2021 Mineral Resource Estimates over 80% M&I

    2021 Mineral Resource Estimates 1 over 80% M&I 8 Vardy/Marley Copper Mineral Resource Category Mt Cu % Pb % Zn % Ag ppm Co % Ni % Pyrite % Measured 6.4 1.17 1.02 0.88 27.9 0.15 0.07 42.8 Indicated 12.2 1.03 1.03 0.66 31.8 0.15 0.07 39.0 Inferred 1.0 1.05 1.13 0.73 36.2 0.14 0.06 41.9 Total 19. 6 1.0

  9. Slide 9: Revised Scoping Study Results

    Revised Scoping Study Results

  10. Slide 10: Revised Scoping Study Highlights

    10 Revised Scoping Study Highlights Scale, long life, competitive operating costs, strong revenues, portfolio metal exposure Conventional open pit and underground mining of existing Vardy, Marley and Amy deposits delivering an initial operating life of approximately 14 years 3Mtpa comminution and fl

  11. Slide 11: Revised Scoping Study Assumptions

    11 Revised Scoping Study Assumptions A conservative approach underpinned by extensive previous study and testwork results 2021 Mineral Resource Estimates for Vardy, Marley, Amy Production Mine schedule based on optimisation using owner operator mining costs and long Schedule term commodity prices Te

  12. Slide 12: Revised Scoping Study Key Physicals

    12 Revised Scoping Study Key Physicals Attractive project scale and longevity complement commodity diversification for investors Metal Head Grade Recovery LOM Metal Annual Metal Cu 0.7% 95% 243kt 20kt Zn 0.83% 92% 278kt 23kt Ag 28g/t 82% 26Moz 2.5Moz Co 0.12% 79% 33kt 2.75kt Ni 0.05% 76% 15kt 1.25kt

  13. Slide 13: LOM Metal Production

    13 LOM Metal Production Walford Creek is expected to deliver 590kt of CuEq production at an average annual nameplate of ~50kt CuEq Copper metal production (kt) Zinc metal production (kt) 25.0 30.0 LOM Cu: 243kt LOM Zn: 278kt 25.0 20.0 Production tonnes (kt) Production tonnes (kt) 20.0 15.0 15.0 10.0

  14. Slide 14: Key Financial Outcomes

    14 Key Financial Outcomes Preliminary economics drive decision to proceed to a Pre-Feasibility Study Consensus Case Current Case Metal Prices copper price US$/lb 3.52 4.54 cobalt price US$/lb 16.79 20.42 zinc price US$/lb 1.22 1.36 silver price US$/oz 20.0 27.0 nickel price US$/lb 6.80 8.16 A$/US$ A

  15. Slide 15: Attractive Revenues Underpinned by High Value End Product Mix

    15 Attractive Revenues Underpinned by High Value End Product Mix Copper and cobalt make up ~70% of the revenue mix over LOM Revenue Split by Metal1 (%) Cu Zn Ag Co Ni 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Year 1. Based on spot commodity and foreign exchange

  16. Slide 16: Competitive Unit Operating Costs

    16 Competitive Unit Operating Costs Walford Creek has an attractive average AISC of US$2.0 2.2/lb CuEq Unit Costs Consensus Case Current Case 1 Mining costs include clearing, 1 Mining A$/t processed 46.4 46.4 topsoil removal, drill and blast, Processing (incl. tailings) A$/t processed 42.4 42.4 load

  17. Slide 17: Operating Cost Breakdown

    17 Operating Cost Breakdown Unit operating costs (A$/t) Operating cost split (%) 175 1.0% 3.0% 9.0% 150 147 Royalty 5.0% 125 115 5.0% 109 110 Mining U/G 36.0% Operating cost (A$/t) 102 100 94 93 94 93 93 94 94 93 91 75 14.0% Maintenance 67 50 Reagents 9.0% Oxygen 25 Power 6.0% 12.0% - 1 2 3 4 5 6 7

  18. Slide 18: Strong Free Cash Flow Generation

    18 Strong Free Cash Flow Generation Substantial LOM cashflow of ~A$1.9bn is forecast at current metal prices Annual and Cumulative Cashflow1 (A$m) 2,000 800 LOM Cumulative Cashflow: ~A$1.9bn 1,500 600 1,000 400 Cumulative Cashflow (A$m) Annual Cashflow (A$m) 269 254 249 244 229 230 226 223 214 206 1

  19. Slide 19: Proposed Project Timeline

    19 Proposed Project Timeline Moving forward - targeting a development decision by end of 2022 to deliver potential for first production in 2025 Apr 21 Jul 21 Oct 21 Jan 22 May 22 Aug 22 Nov 22 Environmental Impact Statement Land Access Agreements Prefeasibility Study Exploration Drilling Bulk Sulphi

  20. Slide 20: Open Pit Mining & Site Layout

    20 Open Pit Mining & Site Layout Upper Py1 load in Vardy & Marley mined from open cut, lower Py3 load in Vardy, Marley and Amy mined from underground Open Pit Mining Site Layout Vardy + Marley open pits:11.2Mt ore with strip ratio 2.8:1 Gently sloping and open terrain Current exploration program is

  21. Slide 21: Vardy / Marley Pit and Stope Designs

    21 Vardy / Marley Pit and Stope Designs Open pit production matched to underground production for first 10 years >0.5% Cu Eq resource outlines Current exploration program is expected to extend open pits and expand underground stoping Vardy / Marley underground mine Design in longitudinal projection

  22. Slide 22: Underground Ore Extraction

    22 Underground Ore Extraction Underground extraction will be by traverse retreat longhole open stoping

  23. Slide 23: A Winning Approach

    23 A Winning Approach 1. Bulk sulphide flotation 2. Pressure oxidative leaching 3. Sequential metal recovery Bulk Sulphide Concentrate / POX Flowsheet Cu Pb Zn Ag Co Ni Primary Grind P80 150µm Primary Liberation metal sulphides from non-sulphide gangue Initial Separation Bulk sulphide concentrate Me

  24. Slide 24: Excellent Cobalt Extraction From Pyrite Concentrate

    24 Excellent Cobalt Extraction From Pyrite Concentrate Low temperature POX is highly effective at extracting cobalt and other metals Process Co extraction PLS tenor Residence time Capex Opex Heap bioleach low very low very high low low Atmospheric leach low low high low low Atmospheric oxidative med

  25. Slide 25: Bulk Sulphide Concentrate Flowsheet

    25 Bulk Sulphide Concentrate Flowsheet

  26. Slide 26: Pressure Oxidative Leach Flowsheet

    26 Pressure Oxidative Leach Flowsheet

  27. Slide 27: Embracing Solar

    27 Embracing Solar Lower cost solar PV generation is expected to contribute at least 30% of the total 54MW power requirement for the project Annual mean solar irradiation ~6kWhr/m2 Annual mean sunshine ~10hr/day Electricity Pricing (Capex + Opex ): Solar <10c/kWhr vs Diesel >25c/kWhr Potential for >

  28. Slide 28: Logistics Route

    28 Logistics Route Export of the metal end products is planned via road (and possibly rail) to Townsville port

  29. Slide 29: Exploration Upside

    Exploration Upside

  30. Slide 30: 2021 Exploration Program Resource Infill

    30 2021 Exploration Program Resource Infill Geophysical survey work completed, significant drilling program commenced Existing open pit shells and underground stoping gaps within Marley and Vardy (red) with highlighted (yellow) to be targeted Phase 1 Phase 2 Metallurgical and in-fill drilling largel

  31. Slide 31: 2021 Exploration Program Resource Expansion

    31 2021 Exploration Program Resource Expansion Building towards an updated Mineral Resource estimate in early 2022 2021 Exploration Program scope Phase 3 Drilling activities reflecting outcomes of Phase 2 Focus on delineation to incorporate into an updated Mineral Resource Estimate (early 2022) prio

  32. Slide 32: The Wider Basin Hosting Walford Creek Has More To Offer

    32 The Wider Basin Hosting Walford Creek Has More To Offer Emerging base metals mineral province that is attracting broader interest Basin Edge Project Strategic tenement holding in what is a World Class Mineral Province Under cover and under explored Walford mineralisation strike extent suggests po

  33. Slide 33: Promising IOCG Targets on Isa West Tenements

    33 Promising IOCG Targets on Isa West Tenements Beauchamps drilling in 2020 demonstrated presence of IOCG system Isa West IOCG Project Substantial ground holding of 1,241km² 3 holes drilled in 2020 to test coincident regional magnetic and gravity anomalism with a moderate AEM response Shallow cover

  34. Slide 34: Porphyry Co/Mo Targets in South East Qld

    34 Porphyry Co/Mo Targets in South East Qld Large mineral province hosting variety of mineralisation styles Monto Project Highly prospective Minerals Province known for not only gold systems (Mt Morgan, Mt Rawdon, Cracow and Gympie) but also Cu-Mo porphyry systems (Coalstoun, Anduramba and Chinaman

  35. Slide 35: Conclusion

    CONCLUSION Aeon Metals is focused on: 1. Completing PFS on Walford Creek Cu/Co Project 2. Completing Resource Drilling Program 3. Advancing Regional Copper Exploration 4. Delivering Results