Harte Gold Corp

Harte Gold — Investor Presentation (April 2017)

18 slides from Harte Gold's investor presentation, Apr 7, 2017

  1. Slide 1: Harte Gold Corp. – High Grade Gold Mine Development and District Scale Exploration

    GOLD CORP Harte Gold Corp. High Grade Gold Mine Development April 2017 and District Scale Exploration in TSX: HRT / Frankfurt: H4O Northern Ontario, Canada OTC: HRTFF

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS ▪ This presentation has been prepared by the Company and includes information from sources believed by management to be reliable. No representation or warranty, expressed or implied, is made as to the accuracy of the information set forth herein. The information contained

  3. Slide 3: Company Overview

    COMPANY OVERVIEW HIGH GRADE GOLD MINE DEVELOPMENT AND REGIONAL EXPLORATION PROGRAM IN NORTHERN ONTARIO OVERVIEW GEOGRAPHIC LOCATION Harte Gold has “3 legs on the stool” 1) Mine Development and Commercial Production ▪ Commercial production begins Q2, 2018 ▪ Phase 1: 500 tpd ~ 50K oz/yr ▪ Construction

  4. Slide 4: Experienced Management Team and Board of Directors

    EXPERIENCED MANAGEMENT TEAM AND BOARD OF DIRECTORS Management Team Board of Directors Stephen G. Roman – Chairman, President & CEO; BA Stephen G. Roman – Chairman, President & CEO; BA ▪ 30+ years in mineral exploration and development ▪ Discovered and sold Gold Eagle Mines to Goldcorp for $1.5B Geor

  5. Slide 5: Site Photos

    SITE PHOTOS WELL ESTABLISHED UNDERGROUND AND SURFACE INFRASTRUCTURE ON-SITE INFRASTRUCTURE HARTE GOLD MINE ACCESS ROAD OPENED LONGHOLE STOPE LOWER ZONE OREBODY 5 TSX: HRT

  6. Slide 6: Mining - Bulk Sample

    MINING - BULK SAMPLE 70,000 TONNE BULK SAMPLE COMPLETED, POSITIVE RESULTS DE-RISK MOVE TO COMMERCIAL PRODUCTION PORTAL BULK SAMPLE RESULTS ▪ Geology: Confirmed continuity, mineralized widths and modelled grades ▪ Mining: 2,000m of underground development and bulk sample confirm the Sugar Zone Deposi

  7. Slide 7: Sugar Zone Deposit

    SUGAR ZONE DEPOSIT WELL DRILLED, OPEN ON STRIKE AND AT DEPTH Portal Bulk Sample Area open 500 m Upper Zone open Lower Zone open 800 m 7 TSX: HRT

  8. Slide 8: Bulk Sample And Phase I Commercial Areas

    Bulk Sample And Phase I Commercial Areas SE NW Fresh Air Raise 375 Level 95 Level 315 Level 155 Level Phase I Production Bulk Sample 8 TSX: HRT

  9. Slide 9: Mining – Commercial Production

    MINING – COMMERCIAL PRODUCTION ACCELERATED PROJECT TIMELINE TO LOW-COST COMMERCIAL PRODUCTION ADVANCING PROJECT TO COMMERCIAL PRODUCTION MINE DESIGN – EXISTING AND PLANNED ▪ Final Technical Report currently underway and expected Q4, 2017 ► Initial Stantec Mine plan shows a 485tpd operation, producti

  10. Slide 10: Exploration – Sugar Zone Mine Extensions

    EXPLORATION – SUGAR ZONE MINE EXTENSIONS SUGAR ZONE DEPOSIT IS AN ARCHEAN LODE DEPOSIT STRATEGY SUGAR ZONE EXTENSION OPPORTUNITIES ▪ Near-term target of +1Moz at the Sugar Zone Deposit ▪ Deposit is open along strike and down dip ► Drill hole SZ-12-37 hit similar mineralization as the Deposit at 1,00

  11. Slide 11: Exploration - Near-Mine Potential

    EXPLORATION - NEAR-MINE POTENTIAL MIDDLE ZONE AND WOLF ZONE FEATURE HIGH GRADE MINERALIZED ZONES STRATEGY SIGNIFICANT NEAR-MINE POTENTIAL ▪ Comprehensive exploration and step out drill program currently underway ► 10,000m in H1 2017 to expand Middle Zone ► 10,000m in H2 2017 to expand Wolf Zone ▪ Mi

  12. Slide 12: Exploration - Regional Upside

    EXPLORATION - REGIONAL UPSIDE 30KM OF UNDEREXPLORED GREENSTONE BELT PROVIDES STRONG REGIONAL EXPLORATION POTENTIAL STRATEGY REGIONAL EXPLORATION TARGETS ▪ Ramp up exploration of 62,000 Hectare land package on the underexplored Dayohessarah Greenstone Belt ▪ Follow up IP/magnetic surveys, unexplored

  13. Slide 13: Exploration - Regional Upside

    EXPLORATION - REGIONAL UPSIDE 62,000 HA PROPERTY INCLUDES UNDEREXPLORED GREENSTONE BELT = REGIONAL EXPLORATION POTENTIAL STRATEGY REGIONAL EXPLORATION TARGETS • Comprehensive exploration programs underway: • Airborne Geophysical survey including MAG & VTEM • Pending completion of the Airborne survey

  14. Slide 14: Geophysical Surveys Guide Exploration

    GEOPHYSICAL SURVEYS GUIDE EXPLORATION On Strike Prospects Main 3 Deposits IP Survey 4 Discoveries: ▪ Sugar ▪ Middle Syncline ▪ Wolf Duplication ▪ Fisher ~ 3M oz target Conductors Sedimentary Prospects MAGNETICS (2008) VTEM (2012) 14 TSX: HRT

  15. Slide 15: IP Chargeability

    IP CHARGEABILITY Chargeability ➢ Fisher ➢ Wolf ➢ Middle ➢ Sugar Parallel IP chargeability structures sandwich gold bearing zones High Chargeability 15 TSX: HRT

  16. Slide 16: Three-Track Approach – Allocation of C$25M December 2016 Private Placement

    THREE-TRACK APPROACH EXPLORATION AND DEVELOPMENT ACTIVITIES, TARGETING +3 Moz NEAR MINE RESOURCE; COMMERCIAL PRODUCTION IN 12 MONTHS; REGIONAL DISCOVERIES ALLOCATION OF C$25M DECEMBER 2016 PRIVATE PLACEMENT SUBSTANTIAL RESOURCE GROWTH AND FIRST PRODUCTION $25 2017 2018 2019 $20 Definition and Explor

  17. Slide 17: Share Capitalization

    SHARE CAPITALIZATION 52 WEEK SHARE PRICE AND TRADING VOLUME CAPITAL STRUCTURE Shares Outstanding 449,136,619 Warrants 28,133,869 Stock Options 36,720,000 Fully diluted 513,990,488 Warrants average exercise price = $0.27 outside expiry date = July 2018 Stock Options average exercise price = $0.22 out

  18. Slide 18: Sugar Zone 345 level

    ¢ ~ Sugar Zone 345 level TZ, 2 ™— ¥ .

Harte Gold — Investor Presentation (April 2017) on 6ix