Alcidion Group Limited · ASX:ALC

Alcidion — Conference Presentation (September 2015)

9 slides from Alcidion's conference presentation, September 2015

  1. Slide 1: Electronic Bed Management

    ELECTRONIC BED MANAGEMENT PRESENTATION OF MIYA BED MANAGER– SEPTEMBER 2015

  2. Slide 2: Introduction

    INTRODUCTION Leanne Dillon Vice President Clinical Engagement Alcidion Corporation

  3. Slide 3: Our Experience in Patient Flow

    OUR EXPERIENCE IN PATIENT FLOW ● Internal communication – Many phone calls, paper notes – Interruptions to patient care – Allied health staff had to find nurses to tell them when they had seen a patient – ED demand not visible to ward staff ● Inability to obtain real time clinical information at the

  4. Slide 4: The Bed Management Challenge

    THE BED MANAGEMENT CHALLENGE ● No real time view of hospital capacity ● No transparency around ward bed status ● Current processes are: – Manual – Paper based – Phone calls – No visibility of actual bed state (hidden beds) ● Systems don’t talk so staff have to access multiple IT systems and the phon

  5. Slide 5: Alcidion's Miya Platform

    ALCIDION’S MIYA PLATFORM PAS HL7 Admit, Discharge, Transfer Administrative Journey Board PAS HL7 Patient Demographics Dat a Int egrat ion, Analysis, e-Guidance PAS Export Elective Admissions Miya Plat form Emergency IS Patients, Admit Requests Desktop PC/ Infotainment Laborat ory Results Clinical RI

  6. Slide 6: Supporting Patient Flow

    J rccivion SUPPORTING PATIENT FLOW |

  7. Slide 7: Live Demonstration

    LIVE DEMONSTRATION . Por 421 PM 4 2KeD = Western Hospital [Footscray] Peri Operative & Critical Care Services Colapes: vied untuk | open wet soasr | preme Seite Tener carsne | PetDC | Gate ARDS Aw 1 24 18 6 2 1 1 1 Fow 15 8 7 1 3 1 2 F3E 15 12 3 1 2 3 FoCU o 10 8 ? 2 2 2 2 roll |: | 202 0 2 ‘ FICU a

  8. Slide 8: In Summary

    IN SUMMARY ● Miya – e-health guidance systems ● Increased transparency about patient flow, bed capacity and demand ● Reduces the ‘noise’ associated with bed management ● Provides management with real time data – Process of discharge planning – Why discharge is delayed

  9. Slide 9: Questions?

    QUESTIONS? Ashleigh Wilby Marketing Manager Alcidion Corporation Ashleigh.Wilby@alcidion.com

Alcidion Group — Conference Presentation (September 2015) on 6ix