Impact Silver Corp. · TSXV:IPT

Impact Silver — Investor Presentation (April 2014)

27 slides from Impact Silver's investor presentation, April 2014

  1. Slide 1: Q4 2013 Corporate Presentation

    hy CANS > Om Oi IMPACT SILV EsR. CORP APR 2014 | Q4 2013 CORPORATE PRESENTATION

  2. Slide 2: Cautionary Statement

    Cautionary Statement Except for historical information, this presentation may contain certain “forward-looking” statements and information relating to IMPACT that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. S

  3. Slide 3: Overview

    Overview GROWING IMPACT Silver is a junior silver producer with low cost operations and a growing ASSETS portfolio of silver mines in south-central Mexico. CONTINUOUS A cornerstone of IMPACT’s success is systematic exploration leading to rapid mine EXPLORATION development to increase mill throughput

  4. Slide 4: Directors & Management

    Directors & Management President of IMPACT Silver and Energold Drilling Corp. Over 33 years of mining experience, including Frederick W. Davidson, CA President, CEO, Director holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines. Over 30 years of exploration and mini

  5. Slide 5: Property Location in Mexico

    Property Location in Mexico • Nearly 100% owned and operated 623 km² (62,300 ha) mineral exploration land package in south-central Mexico. • Two contiguous mineral districts with mining activities dating back to the 1500s. • A three hour drive southwest from Mexico City, with paved road access to th

  6. Slide 6: Prolific Mining History

    Prolific Mining History Zacualpan District • The Royal Mines of Zacualpan is one of the oldest mining districts in the Americas, with nearly 500 years of recorded mining history. Valle de Oro subdistrict • IMPACT’s 623 km² land package consists of two large mineral districts and one subdistrict: The

  7. Slide 7: Mine and Production Center Location Map

    Mine and Production Center Location Map • The 500-tpd Guadalupe Production Center is located within the Zacualpan District. • The Guadalupe Production Center receives ore from three underground silver mines located within close proximity: • San Ramon Mine • Noche Buena Mine • Cuchara-Oscar Mine • Th

  8. Slide 8: Long Term Goal and Mine Development Process

    Long Term Goal and Mine Development Process To build a profitable, mid-tier, multimillion ounce precious metals producing company with multiple mines feeding multiple processing centres. Exploration and Mine Development Process Flowchart RESEARCH FIELD WORK DRILLING MINE Compile old mines Geological

  9. Slide 9: Two Production Centres

    Two Production Centres Guadalupe Production Guadalupe Production Capire Capire Production Production Centre Centre Centre Centre Capire-Mamatla District Zacualpan District Zacualpan District Capire-Mamatla District 500 TPD 500 TPD 200 TPD 200 TPD Flotation circuit Flotation circuit PilotPilot plantp

  10. Slide 10: Guadalupe Production Centre

    Guadalupe Production Centre • Guadalupe Production Centre (500 tpd) • Flotation circuit produces silver-lead and zinc-silver concentrates 10

  11. Slide 11: Capire Mine and Production Centre

    Capire Mine and Production Centre • Capire Production Centre (200 tpd pilot plant) • Capire Mine (VMS, open-pit) 11

  12. Slide 12: Four Producing Silver Mines

    Four Producing Silver Mines San Ramon Noche Buena Cuchara-Oscar Capire Began production in 2008 Began production in 2010 Corridor of wide, high-grade Volcanogenic sulfide Epithermal veins Epithermal veins in Valle de epithermal veins linking deposit with high-grade Oro subdistrict located in the leg

  13. Slide 13: Geology of Epithermal Vein Systems

    Geology of Epithermal Vein Systems Metal Level in Producing Mines Metal Zoning in Ore Shoots Strike Length Depth 150 – 420 m (500 – 1,400 ft) Surface – 0 m (0 ft) Silver-rich at top of vein Cuchara-Oscar Mine 200 – 1,000+ g/t Ag Noche Buena Mine 150 m (500 ft) Lead and Zinc-rich at San Ramon Mine bo

  14. Slide 14: Exploration Targets

    Exploration Targets • An abundance of attractive exploration targets across Zacualpan and Capire districts to drive organic growth and potentially advance into mine development and production. Zacualpan District Capire-Mamatla District • Mirasol • Manto Rico • La Condesa • Guadalupe • Santa Efigenia

  15. Slide 15: Production Summary

    Production Summary Production Highlights Q4 2013 YE 2013 Change YE 2012 Silver-Focused Producer Silver production (oz) 153,512 682,526 +10% 620,515 Metal Production Profile Gold production (oz) 337 1269 +102% 629 4.05% 7.73% Average mill head grade (silver 151 158 +14% 138 Silver production (oz) gra

  16. Slide 16: Financial Highlights

    Financial Highlights (CDN$000’000’s except EPS) YE 2013 YE 2012 YE 2011 Revenues $14.1 $15.9 $24.3 Operating expenses 11.3 $10.3 $10.1 Mine operating earnings (loss) $0.5 $4.0 $12.9 EBITDA ($4.6) $1.6 $13.0 Net earnings (loss) ($8.5) ($1.1) $7.6 Operating cash flow* $0.6 $3.3 $10.2 Debt Nil Nil Nil

  17. Slide 17: Corporate Summary

    Corporate Summary (TSX-V: IPT) All prices in Canadian Dollars As of April 5, 2014 1-Year Chart Summary Common shares – Issued & Outstanding 68.1 M Fully Diluted 74.8 M Share Price $0.66 52wk Range $0.44 - $1.17 90-Day Average Daily Volume 72,963 Shares Market Capitalization 45.0M Insider and Institu

  18. Slide 18: Plans for Growth

    Plans for Growth • 30,000 meter exploration drill program (completed) • Increase average silver mill feed grade (completed: Q1-146 g/t Ag; Q2 – 163 g/t Ag; Q3 – 171 g/t Ag) 2013 • Complete drilling at Mirasol Prospect and determine its potential as next producing mine (completed) • Continue drilling

  19. Slide 19: Contact Us

    Contact Us IMPACT Silver Corp. TSX-V: IPT Frankfurt: IKL Telephone 1-604-681-0172 Fax 1-604-681-6813 Email inquiries@impactsilver.com Investor Relations Manager Jerry Huang MBA Website www.impactsilver.com Twitter @IMPACT_Silver Suite1100 - 543 Granville Street Corporate Address Vancouver, BC, Canad

  20. Slide 20: Appendix I: Capire NI 43-101 Resource Estimate

    Appendix I: Capire NI 43-101 Resource Estimate Completed February 2011 Metal Content for Capire Mine Ag (oz) Au (oz) Cu (lb) Pb (lbs) Zn (lbs) Measured 3,529,969 14,146 3,389,275 18,234,678 46,140,820 Indicated 3,694,066 16,300 3,693,733 19,029,800 49,522,173 Measured & Indicated (M&I) 7,224,035 30,

  21. Slide 21: Appendix II: Capire Drill Highlights

    Appendix II: Capire Drill Highlights A Selection of Capire Drill Highlights To Interval Pb Zn Cu Drill Hole From (m) Ag (g/t) Au (g/t) (m) (m) (%) (%) (%) C12-06 78.25 80.30 2.05 507 1.81 2.20 4.02 0.41 including 79.30 80.30 1.00 929 3.27 2.77 5.27 0.63 and 105.70 110.80 5.10 183 0.20 1.05 2.45 0.13

  22. Slide 22: Appendix III: Mirasol Drill Highlights

    Appendix III: Mirasol Drill Highlights A Selection of Mirasol Drill Highlights To Interval Pb Zn Drill Hole Vein Name From (m) Ag (g/t) Au (g/t) (m) (m) (%) (%) Z12-71 Mirasol Central 73.9 82.9 8.98 183 0.030 0.07 0.14 including Mirasol Central 75.2 82.4 7.15 216 0.040 0.08 0.16 Z12-79 Mirasol Arrib

  23. Slide 23: Appendix IV: Cuchara-Oscar Drill Highlights

    Appendix IV: Cuchara-Oscar Drill Highlights A Selection of Cuchara-Oscar Drill Highlights Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z11-46 92.10 97.75 5.65 1,007 0.07 0.50 1.1 including 96.70 97.75 1.05 4,580 0.26 1.70 4.0 and 108.95 111.70 2.75 1,128 0.51 0.90 1.4 Z11-

  24. Slide 24: Appendix V: Valle de Oro Drill Highlights

    Appendix V: Valle de Oro Drill Highlights A Selection of Carlos Pacheco Drill Highlights Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Cu (%) Z08-68 Top of intercept - 85.74 2.90 19.6 68 0.29 including Top of intercept - 85.74 1.0 49.7 59 0.31 Z12-13 192.30 199.00 6.70 3.84 28 0.54 inclu

  25. Slide 25: Appendix VI: La Condesa Drill Highlights

    Appendix VI: La Condesa Drill Highlights A Selection of La Condesa Drill Highlights Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z12-39 167.30 171.00 3.70 312 0.029 0.27 0.90 Z12-42 136.00 139.78 3.78 214 0.269 0.15 0.37 Z12-45 177.90 179.00 1.10 1,655 0.010 0.25 0.08 Z12-

  26. Slide 26: Appendix VII: San Juan Project Drill Highlights

    Appendix VII: San Juan Project Drill Highlights A Selection of San Juan Project Area Drill Highlights Drill Hole Vein Name From (m) To (m) True Width (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z13-40 61.70 63.15 1.31 7.9 3.956 0.10 0.19 Z13-42 Carlos Pacheco 119.30 128.60 9.02 21.3 3.894 0.98 3.28 includin

  27. Slide 27: www.impactsilver.com

    TSX-V: IPT WWW.IMPACTSILVER.COM

Impact Silver — Investor Presentation (April 2014) on 6ix