Arctic Minerals Ab · OMXSTO:ARCT

Arctic Minerals Ab — Investor Presentation (November 2026)

23 slides from Arctic Minerals Ab's investor presentation, November 2026

  1. Slide 1: Nordic Scale. Copper & Silver Focus.

    NORDIC SCALE. COPPER & SILVER FOCUS. Developing the next generation of critical Company presentation metal assets in the Nordics. November 2026 1 1

  2. Slide 2: Important Information

    Important Information The information comprised in this document (the “Presentation”) has been prepared by the Board of Directors of Arctic Minerals AB (publ) (“Arctic Minerals” or the “Company”) and does not constitute or form part of any offer to purchase or subscribe for, any securities of the Co

  3. Slide 3: Table of contents

    Table of contents Advanced projects Bidjovagge Introduction to Hennes Bay | Bidjovagge 01 Arctic Minerals Cu - Au Greenfield projects Swan Lake | Kuusi 02 Portfolio overview Swan Lake Kuusi Cu – Au – PGE Cu – Au - Ag 03 Hennes Bay – Flagship asset 04 Market overview FLAGSHIP Hennes Bay Cu - Ag 05 Ap

  4. Slide 4: Executive summary

    Executive summary Two Nordic advanced exploration copper-silver-gold projects with multiple near-term growth catalysts Hennes Bay – Flagship Asset Bidjovagge – Advanced Exploration Asset Cu Ag Cu Au 90.7 Mt 682kt 60.9 Moz >50 km <5% 17,549m 2.38 Mt 3.3 Mt 32kt 135 koz PEA 162,295m Outcropping Drilli

  5. Slide 5: The expertise to advance Arctic Minerals

    The expertise to advance Arctic Minerals A complementary team spanning exploration, mine development, capital markets and Nordic stakeholder engagement Board & management Complementary capabilities Significant mining leadership experience Robert Behets Peter George Joakim Lidfeldt Johan Spetz Erik L

  6. Slide 6: Why copper?

    Why copper? Robust demand growth and a slow supply response support copper’s long-term price outlook Copper price 16 000 CAGR 12.1% 12 000 8 000 4 000 0 1 2 2016 2018 2020 2022 2024 2026 Demand is broadening New supply is difficult 3 Electrification, power grids, data centers & Major discoveries are

  7. Slide 7: Regulatory tailwinds in our favour

    Regulatory tailwinds in our favour New reforms in Norway and Sweden — aligned with the EU Critical Raw Materials Act — are shortening the path to production Norway – New Minerals Act Sweden – New Mineral Strategy EU – 2030 Raw Materials Targets In force from 1 July 2026 Announced July 2026 Regulatio

  8. Slide 8: Table of contents

    Table of contents Advanced projects Bidjovagge Introduction to Hennes Bay | Bidjovagge 01 Arctic Minerals Cu - Au Greenfield projects Swan Lake | Kuusi 02 Portfolio overview Swan Lake Kuusi Cu – Au – PGE Cu – Au - Ag 03 Hennes Bay – Flagship asset 04 Market overview FLAGSHIP Hennes Bay Cu - Ag 05 Ap

  9. Slide 9: Project portfolio overview

    Project portfolio overview Geared towards resource growth, project advancement and near-term exploration success across four Nordic copper-silver-gold assets Hennes Bay (Flagship) — Cu-Ag Bidjovagge Project — Cu-Au ADVANCED EXPLORATION ADVANCED EXPLORATION Comparable geological settings Comparable g

  10. Slide 10: Table of contents

    Table of contents Advanced projects Bidjovagge Introduction to Hennes Bay | Bidjovagge 01 Arctic Minerals Cu - Au Greenfield projects Swan Lake | Kuusi 02 Portfolio overview Swan Lake Kuusi Cu – Au – PGE Cu – Au - Ag 03 Hennes Bay – Flagship asset 04 Market overview FLAGSHIP Hennes Bay Cu - Ag 05 Ap

  11. Slide 11: Contained CuEq metal up 72%, with ample room to grow

    Hennes Bay – Contained CuEq metal up 72%, with ample room to grow 90.7 Mt resource now defined across six prospects, with mineralisation remaining open and <5% of the tenement drill tested Summary Plan view – looking down from above Updated MRE: 90.7 Mt @ 1.03% CuEq (0.75% Cu & 20.9g/t Ag) for 936kt

  12. Slide 12: Mineral Resource Estimate, November 2026

    Hennes Bay – Mineral Resource Estimate, November 2026 90.7 Mt @ 1.03% CuEq for 936 kt CuEq across six prospects – 30% now in the Indicated category By classification Six prospects open along ~20 km of strike, open at depth Tonnes Classification CuEq (%) Cu (%) Ag (g/t) CuEq (kt) Cu (kt) Ag (Moz) (Mt

  13. Slide 13: Conceptual mining study sets the scene for PEA and permitting

    Hennes Bay – Conceptual mining study sets the scene for PEA and permitting Room-and-pillar mining into a central decline/conveyor corridor, with resource growth beyond Dingelvik Conceptual mining study complete Conceptual mine layout ▪ Multiple decline access supports around 4 Mt annually Room-and-p

  14. Slide 14: Historical testing indicates strong copper and silver recoveries

    Historical testing indicates strong copper and silver recoveries High copper and silver recoveries possible using standard processing technologies Historical testwork results Key takeaways from the testwork Cu Ag Cu Ag Cu Most of the copper can be recovered ~90% Cu ≥90% Cu ~30% Cu Cu Under the histo

  15. Slide 15: Major infrastructure in place

    Major infrastructure in place Heavy haulage roads, ports, and high-voltage power lines are already in place at Hennes Bay Established regional infrastructure supports potential development Transport Electric railway to Gothenburg Port or Lake Vänern ports — direct EU market access, no transshipment

  16. Slide 16: Drill Program 1 Complete, DP2 Underway

    Drill Program (DP) 1 Complete, DP2 Underway 10 of 12 holes in DP1 intersected copper mineralisation; Dingelvik extended up to 465m down-dip of historical drilling High-grade intersections: 64.4m @ 1.0% CuEq incl. 1.7m @ 3.2% CuEq (down-hole)¹ Mineralised horizon in Hole 2604. From top to bottom: Han

  17. Slide 17: Pathway towards potential development

    Hennes Bay – pathway towards potential development Resource definition, technical studies and permitting progress in parallel CURRENT POSITION NEAR-TERM WORK SUBSEQUENT MILESTONES LATER STAGE Further drilling 4,187m DP1 DP2 results RESOURCE & 90.7 Mt Resource and potential drilling completed, and re

  18. Slide 18: Table of contents

    Table of contents Advanced projects Bidjovagge Introduction to Hennes Bay | Bidjovagge 01 Arctic Minerals Cu - Au Greenfield projects Swan Lake | Kuusi 02 Portfolio overview Swan Lake Kuusi Cu – Au – PGE Cu – Au - Ag 03 Hennes Bay – Flagship asset 04 Market overview FLAGSHIP Hennes Bay Cu - Ag 05 Ap

  19. Slide 19: Copper demand is outrunning the project pipeline

    Copper demand is outrunning the project pipeline Electrification and next-generation technologies require more copper, while new supply remains slow to develop 2035 IEA copper-market comparison Million tonnes per year ~7.0 Mt 2035 primary supply requirement 27,5 Projected 2035 primary copper supply

  20. Slide 20: Silver demand continues to exceed supply

    Silver demand continues to exceed supply 2026 is forecast to mark a sixth consecutive year with a market deficit 2026 global silver market outlook Where demand comes from Total supply Total demand ~640 Moz – Used in industrial products 1,066.4 Moz 1,112.6 Moz Silver is used in electronics, solar pan

  21. Slide 21: Table of contents

    Table of contents Advanced projects Bidjovagge Introduction to Hennes Bay | Bidjovagge 01 Arctic Minerals Cu - Au Greenfield projects Swan Lake | Kuusi 02 Portfolio overview Swan Lake Kuusi Cu – Au – PGE Cu – Au - Ag 03 Hennes Bay – Flagship asset 04 Market overview FLAGSHIP Hennes Bay Cu - Ag 05 Ap

  22. Slide 22: Resource nationalism is accelerating across the copper supply chain

    Resource nationalism is accelerating across the copper supply chain In under two years, the EU, Indonesia, China, the DRC and the US have each moved to keep critical copper feedstock at home What the EU wants by 2030 The same pattern, playing out worldwide 2024–2027 — European Union 10% 1 Waste Ship

  23. Slide 23: Nordic Scale. Critical Metals.

    For further information: NORDIC• SCALE. Contact Peter George, Managing Director and CEO, peter.george@arcticminerals.se CRITICAL METALS. Building the next generation of copper Empowering the green energy transition and silver assets in the Nordics. with Nordic copper, silver and critical metals 23 2

Arctic Minerals — Investor Presentation (November 2026) on 6ix