Dalrymple Bay Infrastructure — Corporate Update (November 2026)

28 slides from Dalrymple Bay Infrastructure's corporate update, November 2026

  1. Slide 1: ASX Announcement: Investor Presentation Dalrymple Bay Terminal Site Visit

    Slide 1: ASX Announcement: Investor Presentation Dalrymple Bay Terminal Site Visit

    ASX Announcement For personal use only 24 November 2026 Investor Presentation Dalrymple Bay Terminal Site Visit Dalrymple Bay Infrastructure Limited (ASX:DBI) (DBI or the Company) releases today the attached Investor Presentation that will be presented during a Dalrymple Bay Terminal site visit on 2

  2. Slide 2: Dalrymple Bay Terminal Site Visit November 2026

    Slide 2: Dalrymple Bay Terminal Site Visit November 2026

    rsonal use only Dalrymple Bay Terminal Site Visit November 2026

  3. Slide 3: Dalrymple Bay Infrastructure

    Slide 3: Dalrymple Bay Infrastructure

    Dalrymple Bay Infrastructure DBI through its foundation asset, the Dalrymple Bay Terminal (DBT), aims to provide safe and efficient port infrastructure and services for producers and consumers of high quality Australian metallurgical coal exports. rsonal use only #1 Largest global metallurgical coal

  4. Slide 4: History of DBT

    Slide 4: History of DBT

    History of DBT The terminal was commissioned in 1983 and is located within the Port of Hay Point, approximately 38km south of Mackay and 900km north of Brisbane rsonal use only Incremental Terminal • Since being established in 1983, DBT has expanded over seven different Expansion Phase Date Capacity

  5. Slide 5: DBT services predominantly metallurgical coal mines in the Bowen Basin

    Slide 5: DBT services predominantly metallurgical coal mines in the Bowen Basin

    The DBT services predominantly metallurgical coal mines in the Bowen Basin • DBT currently services 21 mines across the Central Bowen Basin DBI Asset Location • DBT offers a geographic advantage over alternative export ports: rsonal use only o Centre of DBT catchment (est. Coppabella) to DBT is appr

  6. Slide 6: Terminal Customers and contracts

    Slide 6: Terminal Customers and contracts

    Terminal Customers and contracts • DBT is fully contracted at 84.2mtpa to 30 June 2028 DBI Customer base1 under take-or-pay contracts rsonal use only • Customers have evergreen extension options which Customer2 Mine must be exercised at least 12 months prior to expiry of the current term Anglo Ameri

  7. Slide 7: Queensland Coal Ports

    Slide 7: Queensland Coal Ports

    Queensland Coal Ports DBT provides a low cost export pathway for central Bowen Basin mines Owner/ Capacity Coal Regions rsonal use only Terminal Ownership Structure Location (Mtpa) Access Status Served Comment DBT DBI Hay Point 84.2 Multi- Central Bowen Fully contracted to 84.2Mtpa to Open access Ba

  8. Slide 8: DBT strategically positioned to unlock Bowen Basin coal reserves

    Slide 8: DBT strategically positioned to unlock Bowen Basin coal reserves

    DBT is strategically positioned to unlock high quality Bowen Basin coal reserves to meet growing global demand for seaborne metallurgical coal Australia strategically positioned to rsonal use only Growth in global crude steel production India is forecast to require material is forecast to be driven

  9. Slide 9: DBT Overview

    Slide 9: DBT Overview

    8 rsonal use only DBT Overview

  10. Slide 10: Safety

    Slide 10: Safety

    Safety rsonal use only DBI was the first Zero fatalities, serious Management have a DBT Operator had no Australian injuries and high STI gateway that Fatalities, 1 Serious organisation to be potential incidents requires group wide Injury and 8 HPIs in awarded Safety reported by DBI in safety objecti

  11. Slide 11: Berths: DBT Overview

    Slide 11: Berths: DBT Overview

    Berths DBT Overview 3.8km jetty Hay Point Coal Terminal rsonal use only Site Office Stockyard Inloading Inloading to Facility stockyard conveyors Rail loop dam 10 Site Visit Presentation | November 2026

  12. Slide 12: DBT Site Layout

    Slide 12: DBT Site Layout

    DBT Site Layout DBT covers approximately 3,504,800m2 Infrastructure Description rsonal use only 1 Inloading • Three rail inloading systems feeding three conveyor paths, transferring coal to the stockyard at up to 8,100tph 2 Stockyard • Stores coal received from inloading before being reclaimed to be

  13. Slide 13: Inloading

    Slide 13: Inloading

    Inloading DBT’s inloading systems are the interface between external coal delivery and DBI’s stockyard rsonal use only • Trains arrive via 3 main rail operators – Aurizon Operations, Pacific National and OneRail • DBT has three rail inloading systems • 2 x 5,500tph • 1 x 8,100tph • Combined daily ca

  14. Slide 14: Stockyard

    Slide 14: Stockyard

    Stockyard The stockyard is utilised to manage customers coal deliveries and assemble cargoes prior to shipping rsonal use only • 7.5 stockyard rows with nominal capacity of 2Mt • Coal is stacked into stockpiles approximately 13.2 metres high and approximately 43 metres long • Full cargo assembly ope

  15. Slide 15: Outloading

    Slide 15: Outloading

    Outloading The outloading systems transport coal from stockyard to the shiploader. Surge bins provide a buffer to manage coal flow and optimise shiploading rsonal use only • 3 outload systems (conveyors and shiploaders) • Transport coal to the shiploaders at up to 8,650 tph • Outloaders have some re

  16. Slide 16: Offshore

    Slide 16: Offshore

    Offshore Shiploaders service four berths rsonal use only • 3.8km long jetty supports three conveyor gantries and two roadways • 3 shiploaders individual average design rates of up to 8,650 tph • 4 shipping berths capable of mooring 220,000 dwt Capesize vessels • Allows for three vessels to be loaded

  17. Slide 17: NECAP

    Slide 17: NECAP

    16 rsonal use only NECAP

  18. Slide 18: Organic growth: Non-expansion capital expenditure

    Slide 18: Organic growth: Non-expansion capital expenditure

    Organic growth: Non-expansion capital expenditure NECAP provides an ongoing growth platform • As amounts are spent on NECAP, interest during construction (IDC) accrues at an agreed rate until the expenditure is added to the NECAP Asset rsonal use only Base. This compensates DBI for the cost of debt

  19. Slide 19: Regular NECAP Projects

    Slide 19: Regular NECAP Projects

    Regular NECAP Projects • As at 1 July 2026, DBI has included over $245m of regular NECAP in the Asset Base since 2021 • The regular NECAP program provides a recurring pipeline of non-expansion capital investment directed toward sustaining infrastructure, improving productivity and addressing asset i

  20. Slide 20: Offshore Gallery Wrapping Project

    Slide 20: Offshore Gallery Wrapping Project

    Offshore Gallery Wrapping Project Issue • DBT has 3 jetty conveyors (L5, L6, L15) each comprising of approximately 150 x 24m gallery sections constructed from square hollow section steel that operate in an extremely corrosive environment (i.e. rsonal use only high humidity and salt water) • Historic

  21. Slide 21: NECAP U: Shiploader (SL1) replacement

    Slide 21: NECAP U: Shiploader (SL1) replacement

    NECAP U: Shiploader 1 (SL1) replacement Project Description • SL1 was 43 years old. Due to the asset reaching end of life, SL1 has been replaced rsonal use only with a new Shiploader known as SL1A • Project commenced in April 2023, using a Design-Bid-Build execution model Cost & Returns • Budget is

  22. Slide 22: NECAP T: Stacker Reclaimer (SR2) replacement

    Slide 22: NECAP T: Stacker Reclaimer (SR2) replacement

    NECAP T: Stacker Reclaimer 2 (SR2) replacement Project Description • Stacker Reclaimer SR2 is 43 years old. Due to the asset rsonal use only reaching end of life, SR2 is being replaced with a new reclaimer known as RL4 • Project commenced in April 2023, using a Design-Bid-Build execution model Cost

  23. Slide 23: NECAP supporting revenue uplift

    Slide 23: NECAP supporting revenue uplift

    NECAP supporting revenue uplift Completion of major NECAP programs will drive a step change in TIC • All current NECAP works have been recommended by the Operator and Pricing agreements through Light Handed Regulatory Regime2,3 rsonal use only 6 approved by all customers, demonstrating a strong alig

  24. Slide 24: 8X Expansion Works

    Slide 24: 8X Expansion Works

    8X Expansion Works Capacity expansion project that can be delivered in phases to meet customer demand • 8X is a well-defined pathway to 99.1Mtpa of contracted capacity rsonal use only • All primary environmental approvals have been secured and 8X is wholly within the existing terminal footprint • 8X

  25. Slide 25: Appendices

    Slide 25: Appendices

    24 rsonal use only Appendices

  26. Slide 26: Roles and Responsibilities

    Slide 26: Roles and Responsibilities

    Roles and Responsibilities By contracting day-to-day operations to an entity owned by a subset of customers, DBI minimises its operational complexity and risk rsonal use only Regulatory compliance Non-expansionary Capital Works (NECAP) Terminal expansion Managing customer and access seeker relations

  27. Slide 27: Glossary

    Slide 27: Glossary

    Glossary $ Australian Dollar unless otherwise stated Group DBI and its wholly owned or controlled entities /t Per metric tonne m Million rsonal use only 8X Project Expansion program to bring terminal capacity to a maximum of 99.1Mtpa Mt Million tonnes AU Access Undertaking. Sets out the terms of ter

  28. Slide 28: Disclaimer and important notices

    Slide 28: Disclaimer and important notices

    Disclaimer and important notices This presentation has been prepared by Dalrymple Bay Infrastructure Limited ACN 643 302 032 (DBI or the Company). Summary Information DBI does not have any obligation to update forward-looking information and, except as required by law, DBI is not under any obligatio

Source: ASX announcement, Nov 25, 2026