World Copper Ltd · TSXV:WCU

World Copper — Investor Presentation (December 2024)

26 slides from World Copper's investor presentation, December 2024

  1. Slide 1: Building America's Copper Company

    TSXV: W CU | O TC: W CUFF | FR A: 7LY0 Building America’s Copper Company Corporate Presentation DECEMBER 2024 T S XV : W C U \ O T C : W C U F F \ F R A : 7 L Y 0

  2. Slide 2: Forward Looking and Cautionary Statements

    FORWARD LOOKING AND Cautionary Statements This presentation contains forward-looking statements and forward-looking information (collectively, “forward-looking statements”) within the meaning of applicable Canadian and US securities legislation. All statements, other than statements of historical fa

  3. Slide 3: Historic Copper Pricing & Forecast

    MACRO MARKET VIEW Historic Copper Pricing & Forecast The State of the Copper Market $5.00 APR 15, 2024 $4.38 $4.55 $4.43 Market Balance (Supply Demand Gap) $4.50 $4.27 $4.13 0 Copper Price US$ /lb Cu $4.03 $4.00 Millions of metric tons -2 $3.50 -4 $3.00 -6 $2.50 ACTUALS (2020-2024) CONSENSUS (APR 20

  4. Slide 4: Size Matters: David vs Goliath

    MACRO MARKET VIEW Size Matters: David vs Goliath The Solution: The Big Issues: The market is turning to • 85% of global refined copper environmentally-sound oxide production comes from sulphide deposits, which are less expensive, concentration and smelting – expensive, easier to build, and much fast

  5. Slide 5: Copper Made in America: Arizona, a Prime Mining Jurisdiction

    ARIZONA: A PRIME MINING JURISDICTION Copper Made in America • Ranks 7th Global ARIZONA Canyon Uranium Mining – Fraser Institute Flagstaff Moss Gold • 71% of US copper Bagdad ZONIA supply is produced in Arizona Kay Mine Pinto Phoenix Valley Carlota • USA has Copper Resolution Miami Morenci on its Cri

  6. Slide 6: The Zonia Solution

    A UNIQUE COPPER OXIDE OPPORTUNITY The Zonia Solution Existing Infrastructure Excellent Location • Private land and Past Producer (faster • Located in Yavapai County, central permits) Arizona, 100 miles NW of Phoenix, 1 • Power and water on site hour south of Prescott Power lines on site • Pre-stripp

  7. Slide 7: 2024 Copper Oxide Resource Estimate

    NI 43-101 2024 Copper Oxide Resource Estimate ▸ Indicated Resources of 112.2 M short tons at 0.297% Cu containing 668 M lbs of copper (0.18% Cu cut-off). ▸ Inferred Resources of 62.9 M short tons at 0.255% Cu containing 320 M lbs of copper (0.18% Cu cut-off). ASSUMPTIONS: Classification Short Tons G

  8. Slide 8: 2024 Updated Resource Estimate

    NI 43-101 2024 Updated Resource Estimate ▸ Indicated Resources increased to 112.2 Mt and LOOKING NORTH copper content in this category increased by ZONIA BLOCK MODEL 50% to 668 M lbs Cu compared to the previous Blocks >0.18% CuT estimate. ▸ Potential for a significant increase in LOM and throughput

  9. Slide 9: Zonia Cross Section

    NI 43-101 Zonia Cross Section NW High-grade blocks at surface SE Surface ideal for initial production $4.00 Cu Optimized Pit Shell base of oxide base of mixed Scale (feet) BLOCK CU GRADE % T S XV : W C U \ O T C : W C U F F \ F R A : 7 L Y 0 9

  10. Slide 10: Zonia Land Position

    PRIVATE LAND & CLAIMS ON BLM LAND Zonia Land Position PHASE 1 BLM LAND ▸ Located solely on private land owned by Zonia. ▸ Approx. 10+ years of production in Phase 1. ▸ Faster to permit (state permits only). PHASE 2 PR I VA T E LAND ▸ Located on BLM land (unpatented claims). ▸ Permitting concurrent w

  11. Slide 11: Zonia Technical Team

    WORLD COPPER Zonia Technical Team DEREK WHITE | Lead Technical Advisor JOE PHILIPS | Senior Advisor 35+ years of experience in senior management and building mines. 35+ years of experience, built 14 mining projects in 11 countries. Including Projects include the KGHM Sierra Gorda, Franke, Carlota an

  12. Slide 12: The Zonia Two-Phased Approach

    DEVELOPMENT PLAN The Zonia Two-Phased Approach Phase 1: DE-RISKING PROJECT Resource Update Permits Permitting BFS Engineering DEVEL OPMENT & Leach Pad Test Received ON PRIVATE LAND 2023 2024 2025 Q1/2 2025 Q3/4 2026 2027 Phase 2: GROWTH Start of BLM EXPLORATION Drilling Zonia N New MRE Met Testing P

  13. Slide 13: Simple Mining and Processing (SX-EW)

    ZONIA’S GREENER PROCESS Simple Mining and Processing (SX-EW) ▸ Conventional open pit mining ▸ Standard heap leaching and SX-EW processing (no ISL*) ▸ Low acid consumption (~25 lbs/t) ▸ 73% Cu total recoveries ▸ No smelting – a cleaner process with lower emissions ▸ No tailings – smaller environmenta

  14. Slide 14: Zonia Production Profile / Economics

    2018 HISTORICAL PEA PARAMETERS* Zonia Production Profile / Economics Total Tons Leached 93 M Preliminary Economic Assessment – March 2018 Head Grade 0.30% Cu Base case $2.00/lb Cu designed pit shell; $3.00/lb Cu price Mine Life 8.6 years Payback Period 2.9 years ▸ After-tax NPV (8%) of US$192 M, 29%

  15. Slide 15: Zonia: Extensive Metallurgical Testing

    DEVELOPMENT PLAN Zonia: Extensive Metallurgical Testing ▸ Extensive metallurgical test-work with Column Leach Results (Redstone, 2011) average recovery of 73%. ▸ Low acid consumption of 25 lbs/ton. ▸ Multiple metallurgical tests conducted on the property in 1995, 2008 and 2011. ▸ Master composite sa

  16. Slide 16: Zonia's Expansion

    GROWTH POTENTIAL Zonia’s Expansion New Porphyry Target ▸ Zonia North: large geochemical anomaly identified northeast of Zonia open pit, along strike. ▸ Elevated Mo, Cu & Au, with depressed Mn and Zn: “textbook” porphyry Cu footprint. ▸ This untested drill target measures 1.5 km x 2 km (~1 x 1.5 mile

  17. Slide 17: Addressing the Need for Carbon Neutrality in Mining

    A NET ZERO VISION Addressing the Need for Carbon Neutrality in Mining ▸ Zonia’s aspiration is to become carbon neutral operations and to reduce all operational emissions to meet and exceed the highest industry standards. ▸ Project location, production process, existing infrastructure and size puts Z

  18. Slide 18: Zonia's Outstanding Profile

    COMPARISON WITH ARIZONA PEERS Zonia’s Outstanding Profile COPPER COPPER SANTA ZONIA CACTUS WORLD CREEK CRUZ World Copper Arizona Sonoran HudBay Faraday Copper Ivanhoe Electric CAPEX 233M No 1.74 B 2.2 B 2.66 B 2.1 B (initial + sustaining) flotation, TSF & = $100 M pre- stripping. CAPITAL $8,896 $10,

  19. Slide 19: Zonia's Key Advantages

    IN THE HEART OF US COPPER COUNTRY Zonia’s Key Advantages • Accessible by road INFRASTRUCTURE • Powerline and water on the property • Railroad access 10 miles away • First ~10+ years of production on private patented land (only state permits) PERMITTING • Brownfield site, pre-stripped • Mining-friend

  20. Slide 20: Escalones: Largest Copper Oxide Deposit in Development in Chile

    HIGHLIGHTS Escalones: Largest Copper Oxide Deposit in Development in Chile ▸ 3.4 B lbs of Cu in inferred resources. ▸ PEA annual production 50 kt of copper in cathodes over 20 years. ▸ Post-Tax $1.5B NPV (8) and 46.2% IRR at $3.60/ lb Cu. ▸ High exploration potential: multiple new porphyry targets o

  21. Slide 21: Escalones: 426 Mt of Copper Oxide in Inferred Resources

    AN OUTSTANDING SX-EW OPPORTUNITY Escalones: 426 Mt of Copper Oxide in Inferred Resources ▸ Total land Package: 4,202 hectares, with an option to N acquire 100% ownership. ▸ Potential to discover new copper-gold porphyries 28,000m Resource Estimate Statement drilled in Hard Rock Consulting LLC. Augus

  22. Slide 22: Management

    WORLD COPPER Management JOHN DROBE | Head Geologist • Mr. Drobe is a geologist with over 30 years’ experience specializing in porphyry copper-gold, epithermal and skarn deposits throughout the GORDON NEAL | President & CEO Americas. • Mr. Neal has extensive experience in the metals and mining sector

  23. Slide 23: Board of Directors

    WORLD COPPER Board of Directors HENK VAN ALPHEN | Chairman JONATHAN LOTZ | Director Mr. van Alphen founded Wealth Minerals in 2005. With more than 30 Mr. Lotz is a member of the Bars of British Columbia & New York and is a years of experience in the mining industry, he has been a key player in found

  24. Slide 24: Share Structure

    WORLD COPPER Share Structure 26% Insiders & Management Outstanding Warrants 62,575,736 87,713,195 shares 43% Shares Outstanding: Public Float Outstanding Broker Warrants 201,892,567 61,665,177 shares 802,397 Restricted Shares Outstanding Options 17,320,000 52,514,195 shares 31% T S XV : W C U \ O T

  25. Slide 25: Peer Valuation Gap

    WORLD COPPER Peer Valuation Gap Arizona Faraday World Copper Sonoran Copper Marimaca Project Zonia Cactus Copper Creek Marimaca Stage of Development PEA PEA PEA PEA 2018 2023 2023 2020 Market Capitalization $12.7 M $189 M $165 M $402 M (as of 27 AUG 2024) Net Present Value (NPV8%) $447 M $2,032 M $5

  26. Slide 26: Contact us

    TSXV: WCU | OTC: WCU FF | FRA: 7LY0 Contact us: Michael Pound, Corporate Development Phone: (604) 638-3665 Email: mpound@worldcopperltd.com Visit us online: www.worldcopperltd.com Follow us: WorldCopperLtd T S XV : W C U \ O T C : W C U F F \ F R A : 7 L Y 0 26

World Copper — Investor Presentation (December 2024) on 6ix