GDS Holdings Ltd. · HKEX:9698

GDS — Q3 2021 Earnings Presentation

49 slides from GDS's earnings presentation, Nov 16, 2021

  1. Slide 1: 3Q21 Earnings Call

    Slide 1: 3Q21 Earnings Call

    3Q21 Earnings Call 16 November 2021 NASDAQ: GDS HKEX: 9698 © GDS 2016 0

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER This presentation contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended, and as defined in the U.S. Private Securities Litigation Reform Act of 1995. These forward-looking statements can be identified by terminology such a

  3. Slide 3: Business Strategy & Performance Highlights

    Slide 3: Business Strategy & Performance Highlights

    Business Strategy & Performance Highlights William Huang, Chairman & CEO © GDS 2016

  4. Slide 4: 3Q21 Highlights

    Slide 4: 3Q21 Highlights

    3Q21 HIGHLIGHTS (1)(2) Sales Momentum • Net additional total area committed of +26,611 sqm, or +61 MW • Total area committed increased by 32.1% y/y to 531,760 sqm Capacity Expansion • Total capacity (3) increased by 19,862 sqm to 610,057 sqm, +32.4% y/y • Closed the acquisition of BJ17/18/19 Financi

  5. Slide 5: Sales Momentum

    Slide 5: Sales Momentum

    Sales Momentum Net Additional Total Area Committed (Sqm) – By Quarter Net Additional Total Area Committed (Sqm) – By Year (1) (2) (3) (1) (2) (3) Organic Acquisition B-O-T Organic Acquisition B-O-T 160,034 45,773 44,848 36,482 34,014 19,166 92,800 21,889 27,911 95,184 3,917 26,611 81,215 7,984 23,72

  6. Slide 6: New Hyperscale Commitments

    Slide 6: New Hyperscale Commitments

    New Hyperscale Commitments Largest New Commitments Obtained In 3Q21 Changshu (CS) Campus Under Construction Area Committed IT Power Data Center (Sqm) Committed (MW) SH17 Phase 2 2,933 7.0 CS1 Phase 2 5,028 14.1 BJ13 5,625 14.1 TJ1 Phase 1 3,452 7.6 SZ8 / 3 rd party 4,576 10.2 © GDS 2016 5

  7. Slide 7: Customer Franchise Development

    Slide 7: Customer Franchise Development

    Customer Franchise Development Segment Breakdown By Total Area Committed (1) Leading CSP / Large Internet Customer Additions (2) FSI & Large Enterprises 2011 – 2016 10.7% (3) 2017 Large Internet 15.5% 2018 739 Customers (4) +6.3% Y/Y 2019 73.8% 2020 Cloud Service Providers 2021 Notes: 1. Includes al

  8. Slide 8: New Capacity Brought Into Service

    Slide 8: New Capacity Brought Into Service

    New Capacity Brought Into Service Net Additional Area In Service by Quarter Net Additional Area In Service by Year Organic (Including Acquisition) B-O-T Organic (Including Acquisition) B-O-T 118,976 65,239 104,002 33,337 14,344 15,705 42,571 69,495 59,098 3,888 25,926 27,811 14,456 40,276 50,895 3,8

  9. Slide 9: Sustained High Commitment Rates

    Slide 9: Sustained High Commitment Rates

    Sustained High Commitment Rates Area Under Construction (Sqm) & Pre-Commitment Rate Area In Service (Sqm) & Commitment Rate 72.7% 77.2% 95.9% 94.6% 95.0% 96.2% 69.9% 95.9% 58.2% 62.1% 452,830 169,424 169,387 425,019 165,175 156,511 157,227 359,780 333,853 291,282 3Q20 4Q20 1Q21 2Q21 3Q21 3Q20 4Q20 1

  10. Slide 10: New Resource Acquisitions

    Slide 10: New Resource Acquisitions

    New Resource Acquisitions BJ20/21/22/23 SZ9 & GD Portfolio WH 1/2 HK4 & MC1 SZ9 HK4 n Urban area of Beijing with owned n SZ9 of ~3,600 sqm of NFA n Entry point in Wuhan, the n Completed the purchase the land and building economic hub in Central site of HK4 with NFA of 7,200 n Multiple sites in Guang

  11. Slide 11: Secured Development Pipeline

    Slide 11: Secured Development Pipeline

    Secured Development Pipeline Area Held for Future Development – China (Sqm) (1) Total Developed & Developable Capacity – China (Sqm) Estimated Developable Market Capacity Greater Beijing 161,423 Area In Service 452,830 Greater Shanghai 135,222 Area Held for Future Development (China) 567,678 Greater

  12. Slide 12: Transition To Renewable Energy

    Slide 12: Transition To Renewable Energy

    Transition To Renewable Energy Recent Initiatives n Renewable energy usage: 2020: 22% Actual, 2021: >30% Estimate, 2025: >50% Expectation n Direct Investment in renewable energy generation o Solar panels on the walls of data center buildings o Seeking opportunities for integrated data center / renew

  13. Slide 13: Regional Expansion

    Slide 13: Regional Expansion

    Regional Expansion “Singapore Plus” Strategy n Acquiring greenfield land in Nongsa Digital Park, Batam, Indonesia, for data center development o 28MW of IT power capacity with renewable energy sources Nusajaya Tech Park n Strategic Cooperation Agreement with Telekom Malaysia for network connectivity

  14. Slide 14: Financial & Operating Review

    Slide 14: Financial & Operating Review

    Financial & Operating Review Dan Newman, CFO © GDS 2016

  15. Slide 15: Forming Consolidated JVs For Selected B-O-T Projects

    Slide 15: Forming Consolidated JVs For Selected B-O-T Projects

    Forming Consolidated JVs For Selected B-O-T Projects B-O-T Data Centers Market Data Center RFS Status Ownership Net Floor Area Utilization Rate ZB1 1H18 In Service 100% 5,132 94.9% ZB2 2H18 In Service 100% 4,662 94.5% ZB3 2H18 In Service 100% 4,662 94.6% Greater Beijing ZB4 1H20 In Service 100% 4,01

  16. Slide 16: 3Q21 P&L Analysis

    Slide 16: 3Q21 P&L Analysis

    3Q21 P&L Analysis Quarterly Financial Review Rmb‘000 (unless indicated) 3Q20 2Q21 3Q21 Y/Y Q/Q Service Revenue 1,522,353 1,862,951 2,061,104 35.4% 10.6% Equipment Sales 2,396 968 314 (86.9%) (67.6%) Total Net Revenue 1,524,749 1,863,919 2,061,418 35.2% 10.6% Cost of Revenue (1,115,784) (1,424,050) (

  17. Slide 17: 3Q21 Underlying Trends

    Slide 17: 3Q21 Underlying Trends

    3Q21 Underlying Trends Quarterly Financial Review Rmb‘000 (unless indicated) 3Q20 2Q21 3Q21 Y/Y Q/Q Total Net Revenue 1,524,749 1,863,919 2,061,418 35.2% 10.6% Less: Equipment Sales 2,396 968 314 (86.9%) (67.6%) Service Revenue 1,522,353 1,862,951 2,061,104 35.4% 10.6% Adjusted GP 812,277 1,006,851

  18. Slide 18: Revenue & Area Utilized

    Slide 18: Revenue & Area Utilized

    Revenue & Area Utilized Total Revenue (Rmb Mn) Net Additional Area Utilized (Sqm) & MSR (1) Organic B-O-T Acquisition ( 2 ) 2,061.4 30,587 1,863.9 1,706.0 1,631.6 18,577 18,678 17,460 15,122 1,524.7 16,331 2,146 1,733 1,319 908 2,614 1,841 16,141 16,431 16,037 13,717 13,624 3Q20 4Q20 1Q21 2Q21 3Q21

  19. Slide 19: Underlying Adjusted GP & EBITDA & Margin

    Slide 19: Underlying Adjusted GP & EBITDA & Margin

    Underlying Adjusted GP & EBITDA & Margin Underlying Adjusted GP (Rmb Mn) & Margin Underlying Adjusted EBITDA (Rmb Mn) & Margin 53.4% 53.7% 54.4% 54.0% 52.5% 47.1% 46.8% 47.9% 48.1% 46.9% 1,083.0 1,006.8 966.0 927.8 896.7 873.3 812.2 816.5 761.4 717.2 3Q20 4Q20 1Q21 2Q21 3Q21 3Q20 4Q20 1Q21 2Q21 3Q21

  20. Slide 20: Construction Program

    Slide 20: Construction Program

    Construction Program Self-Developed Data Centers Delivery Schedule (Sqm) Area Under Pre-Commitment RFS Date Tenure Type Construction (Sqm) Rate (%) SH17 Phase 2 4Q21 Own Convert 6,188 58.0% CS2 Phase 2 4Q21 Own Greenfield 2,866 100% 49,429 BJ16 4Q21 Lease Convert 8,569 87.7% 46,379 LF4 Phase 1 4Q21

  21. Slide 21: Capital Expenditure

    Slide 21: Capital Expenditure

    Capital Expenditure Capex Paid – By Quarter (Rmb Mn) (1) Capex Paid – By Year (Rmb Mn) (1) Organic Acquisition 10,961.9 Rmb Mn 3Q20 4Q20 1Q21 2Q21 3Q21 9,378.0 1,357.5 3,576.7 Organic (2) 2,141.0 2,332.0 2,274.9 1,868.4 3,241.9 5,131.2 4,733.1 Acquisition (3) 607.0 413.2 32.8 2,968.8 575.1 578.6 475

  22. Slide 22: Financing Obligations & Liquidity

    Slide 22: Financing Obligations & Liquidity

    Financing Obligations & Liquidity Debt & Cash Outstanding Loan Maturity Schedule As At 30/09/21 (Rmb Mn) 30/09/20 30/06/21 30/09/21 / LQA Adjusted Working Capital Rmb Mn Rmb Mn Rmb Mn EBITDA Project Loan Total Loan 11,930.3 17,207.7 18,978.9 4.9 9,552 Convertible Bond C onvertible B ond 2,009.8 1,91

  23. Slide 23: Debt Financing Activities

    Slide 23: Debt Financing Activities

    Debt Financing Activities Comparison of All-in-Cost (1) & Tenor for Loan Facilities Refinanced in 3Q21 Original Facility Refinanced Facility Project(s) Tenor Amount Tenor Amount All-In-Cost All-In-Cost (Year) (Rmb Mn) (Year) (Rmb Mn) 1 6.09% 1 100 4.50% 8 100 2 6.13% 1 196 4.80% 5 196 3 5.90% 1 168

  24. Slide 24: Backlog Analysis

    Slide 24: Backlog Analysis

    Backlog Analysis Backlog for Area In Service (Sqm) Backlog for Area Under Construction (Sqm) 133,859 127,350 123,126 120,782 118,390 96,148 97,573 90,846 81,063 63,282 3Q20 4Q20 1Q21 2Q21 3Q21 3Q20 4Q20 1Q21 2Q21 3Q21 Note: Include all B-O-T data centers, including B-O-T joint venture data centers p

  25. Slide 25: Updated Business Outlook

    Slide 25: Updated Business Outlook

    Updated Business Outlook FY21 Revised Annual Guidance FY21 Revised Rmb Mn FY20 Actual FY21 Guidance Implied Y/Y Implied Y/Y Guidance Total Revenue 5,739.0 7,700 – 8,000 34.2% – 39.4% 7,700 – 7,850 34.2% - 36.8% Adjusted EBITDA 2,680.6 3,660 – 3,800 36.5% – 41.8% 3,660 – 3,730 36.5% - 39.1% Capex (1)

  26. Slide 26: Questions & Answers

    Slide 26: Questions & Answers

    Questions & Answers www.gds-services.com ir@gds-services.com © GDS 2016

  27. Slide 27: Appendix

    Slide 27: Appendix

    Appendix © GDS 2016

  28. Slide 28: Our Data Center Portfolio – Beijing & Shanghai Markets

    Slide 28: Our Data Center Portfolio – Beijing & Shanghai Markets

    Our Data Center Portfolio – Beijing & Shanghai Markets Self-Developed Data Centers In Service & Under Construction 3Q21 Greater Beijing – 37 DCs (1) Greater Shanghai – 29 DCs (1) BJ5/10/11/12/15/16 CS1/2 SH1/2/3/4/6/7/8/9/ BJ4/6 10/11/12/14/15/19 BJ13 SH5 BJ1/2/3/9 SH16/17 BJ17/18 SH13 BJ7/8 TJ1 KS1

  29. Slide 29: Our Data Center Portfolio – Greater Bay Area & Chengdu / Chongqing

    Slide 29: Our Data Center Portfolio – Greater Bay Area & Chengdu / Chongqing

    Our Data Center Portfolio – Greater Bay Area & Chengdu / Chongqing Self-Developed Data Centers In Service & Under Construction In Tier 1 Markets Greater Bay Area – 16 DCs (1) Chengdu / Chongqing – 3 DCs (1) SZ5 SZ8 GZ1/2/3/6 SZ4 HZ1 GZ4 SZ6 HK1/2 SZ1/2/3 CD1/2 CQ1 Note: 1. Include all B-O-T data cen

  30. Slide 30: Key Operating KPIs

    Slide 30: Key Operating KPIs

    Key Operating KPIs Last 8 Quarters As At 4Q19 1Q20 2Q20 3Q20 4Q20 1Q21 2Q21 3Q21 Area In Service (Sqm) 229,851 237,763 277,925 291,282 333,853 359,780 425,019 452,830 Area Under Construction (Sqm) 97,610 118,482 144,873 169,424 156,511 169,387 165,175 157,227 Total Capacity (Sqm) 327,461 356,245 422

  31. Slide 31: Data Center Summary By Market

    Slide 31: Data Center Summary By Market

    Data Center Summary By Market As At 30/09/21 (Sqm, Unless Indicated) (1) Area Held for Pre- Area In Area Under Area Area Pre- Total Area Commitment Utilization Total Capacity Future Area Utilized Commitment # of Self- Service Construction Committed Committed Committed Rate Rate Development (2) Rate

  32. Slide 32: Self-Developed Data Centers In Service – Greater Beijing

    Slide 32: Self-Developed Data Centers In Service – Greater Beijing

    Self-Developed Data Centers In Service – Greater Beijing As At 30/09/21 (Sqm, Unless Indicated) Data Center Ready For Service Type Tenure Area In Service Area Committed Commitment Rate Area Utilized Utilization Rate BJ1 2H15 Convert Lease 2,435 2,429 99.8% 2,353 96.6% BJ2 2H17 Convert Lease 5,819 5,

  33. Slide 33: Self-Developed Data Centers In Service – Greater Shanghai

    Slide 33: Self-Developed Data Centers In Service – Greater Shanghai

    Self-Developed Data Centers In Service – Greater Shanghai As At 30/09/21 (Sqm, Unless Indicated) Data Center Ready For Service Type Tenure Area In Service Area Committed Commitment Rate Area Utilized Utilization Rate SH1 2H11 Purpose-Built Lease 6,432 6,302 98.0% 6,012 93.5% SH2 2H15 Purpose-Built L

  34. Slide 34: Self-Developed Data Centers In Service – Greater Bay Area

    Slide 34: Self-Developed Data Centers In Service – Greater Bay Area

    Self-Developed Data Centers In Service – Greater Bay Area As At 30/09/21 (Sqm, Unless Indicated) Ready For Data Center Type Tenure Area In Service Area Committed Commitment Rate Area Utilized Utilization Rate Service SZ1 2H14 Convert Lease 4,286 4,249 99.1% 4,215 98.3% SZ2 1H16 Convert Lease 4,308 4

  35. Slide 35: Self-Developed Data Centers In Service – Chengdu / Chongqing & Other

    Slide 35: Self-Developed Data Centers In Service – Chengdu / Chongqing & Other

    Self-Developed Data Centers In Service – Chengdu / Chongqing & Other As At 30/09/21 (Sqm, Unless Indicated) Ready For Area Commitment Market Data Center Type Tenure Area In Service Area Utilized Utilization Rate Service Committed Rate CD1 1H17 Purpose-Built Own 6,262 6,232 99.5% 4,830 77.1% Chengdu

  36. Slide 36: Self-Developed Data Centers Under Construction

    Slide 36: Self-Developed Data Centers Under Construction

    Self-Developed Data Centers Under Construction As At 30/09/21 (Sqm, Unless Indicated) Area Under Pre-Commitment Market Data Center Ready For Service Type Tenure Area Pre-Committed Construction Rate BJ13 1H22 Purpose-Built Own 13,903 11,090 79.8% BJ16 2H21 Convert Lease 8,569 7,516 87.7% LF4 Phase 1

  37. Slide 37: Self-Developed Data Center Capacity – Lease Vs Own

    Slide 37: Self-Developed Data Center Capacity – Lease Vs Own

    Self-Developed Data Center Capacity – Lease Vs Own As At 30/09/21 Held For Future Total Developed & Sqm Area In Service Area Under Construction Development Developable Capacity Lease 291,118 41,433 23,359 355,910 Own 83,303 115,794 572,319 771,416 B-O-T 67,386 0 0 67,386 3rd Party 11,023 0 0 11,023

  38. Slide 38: Stabilized Vs. Ramping-Up Data Centers

    Slide 38: Stabilized Vs. Ramping-Up Data Centers

    Stabilized Vs. Ramping-Up Data Centers Breakdown Of Area In Service As At 3Q21 Stabilized Data Centers Ramping-Up Data Centers Area In Service (Sqm) Commitment Rate Utilization Rate Area In Service (1) Area In Service (Sqm) Commitment Rate Utilization Rate SH1 6,432 98.0% 93.5% SH2 7,712 99.7% 96.8%

  39. Slide 39: Top Customers

    Slide 39: Top Customers

    Top 5 Customers By Total Area Committed (1)(2) By Revenue (1) % Of Total Area Number of Data End User End User % Of 3Q21 Total Net Revenue Committed As At 3Q21 Centers (3) Customer 1 40.1% 44 Customer 1 23.1% Customer 2 16.8% 19 Customer 2 21.4% Customer 3 5.0% 5 Customer 3 7.3% Customer 4 4.4% 5 Cu

  40. Slide 40: Forthcoming Contract Renewals

    Slide 40: Forthcoming Contract Renewals

    Forthcoming Contract Renewals Contract Renewal Schedule (1) Period Sqm % of Total Area Committed 4Q21 22,159 4.2% FY22 34,207 6.4% FY23 41,372 7.8% FY24 54,475 10.2% Thereafter 379,547 71.4% Total Area Committed As At 30/09/21 531,760 100% Note: 1. Include all B-O-T data centers, including B-O-T joi

  41. Slide 41: Principal Shareholders

    Slide 41: Principal Shareholders

    Principal Shareholders As At 30/09/21 Pro Forma Ordinary Shares (1) Equivalent ADS Equivalent ADS % of Total ADS Change (3) William Huang (2) 83,859,040 10,482,380 10,482,380 5.6% Directors & Officers 16,639,911 2,079,988 2,079,988 1.1% STT GDC 477,288,484 59,661,060 59,661,060 31.8% Ping An 0 0 +4,

  42. Slide 42: Working Capital Management

    Slide 42: Working Capital Management

    Working Capital Management Accounts Receivable Turnover Days (# of Days) (1) Days Payable Outstanding (DPO) (2) 94 88 # of Days 3Q20 4Q20 1Q21 2Q21 3Q21 87 86 84 DPO – Opex 107 88 85 94 94 DPO – Capex 136 139 185 116 130 Total DPO 129 127 155 111 121 Total DPO (Excl. Acquisitions) 110 108 128 92 99

  43. Slide 43: Historical Financial Results – Statements of Operations

    Slide 43: Historical Financial Results – Statements of Operations

    Historical Financial Results Condensed Consolidated Statements of Operations Amounts in thousands Three Months Ended Sep 30, 2020 Dec 31, 2020 Mar 31, 2021 Jun 30, 2021 Sep 30, 2021 RMB RMB RMB RMB RMB USD Net Revenue Service revenue 1,522,353 1,627,451 1,704,492 1,862,951 2,061,104 319,878 Equipmen

  44. Slide 44: Historical Financial Results – Balance Sheets

    Slide 44: Historical Financial Results – Balance Sheets

    Historical Financial Results Condensed Consolidated Balance Sheets Amounts in thousands. As of Sep 30, 2020 Dec 31, 2020 Mar 31, 2020 Jun 30, 2020 Sep 30, 2021 RMB RMB RMB RMB RMB USD Cash 6,004,537 16,259,457 14,914,125 12,326,895 10,103,624 1,568,058 Accounts receivable, net of allowance for doubt

  45. Slide 45: Historical Financial Results – Statements of Cash Flows

    Slide 45: Historical Financial Results – Statements of Cash Flows

    Historical Financial Results Condensed Consolidated Statements of Cash Flows Amounts in thousands Three Months Ended Sep 30, 2020 Dec 31, 2020 Mar 31, 2021 Jun 30, 2021 Sep 30, 2021 RMB RMB RMB RMB RMB USD Net cash (used in) provided by operating activities (7,943) 312,592 (24,197) 363,274 456,191 7

  46. Slide 46: Reconciliation from Gross Profit to Adjusted Gross Profit

    Slide 46: Reconciliation from Gross Profit to Adjusted Gross Profit

    Reconciliation from Gross Profit to Adjusted Gross Profit Adjusted Gross Profit Amounts in thousands Three Months Ended Sep 30, 2020 Dec 31, 2020 Mar 31, 2021 Jun 30, 2021 Sep 30, 2021 RMB RMB RMB RMB RMB USD Gross profit 408,965 430,046 396,852 439,869 455,435 70,682 Depreciation and amortization 3

  47. Slide 47: Reconciliation from Net Loss to Adjusted EBITDA

    Slide 47: Reconciliation from Net Loss to Adjusted EBITDA

    Reconciliation from Net Loss to Adjusted EBITDA Adjusted EBITDA Amounts in thousands Three Months Ended Sep 30, 2020 Dec 31, 2020 Mar 31, 2021 Jun 30, 2021 Sep 30, 2021 RMB RMB RMB RMB RMB USD Net loss (204,635) (271,501) (278,737) (298,463) (301,131) (46,734) Net interest expenses 339,245 386,736 3

  48. Slide 48: Definition of KPIs

    Slide 48: Definition of KPIs

    Definition of KPIs Area In Service Entire net floor area of data centers (or phases of data centers) which are ready for service Entire net floor area of data centers (or phases of data centers) which are actively under construction and have not yet reached the stage Area Under Construction of being

  49. Slide 49: Analyst Coverage

    Slide 49: Analyst Coverage

    Analyst Coverage Broker Analyst Contact BofA Paul Dewberry paul.dewberry@baml.com BOCI Michael Meng michael.meng@bocigroup.com Berenberg Nate Crossett nate.crosssett@berenberg-us.com CICC Kai Qian kai.qian@cicc.cn Citi Arthur Lai arthur.y.lai@citi.com Citic Securities Yingbo Xu xuyb@citics.com CMB I

Source: Internet Archive copy of investors.gds-services.com

More decks from GDS Holdings Ltd.

All 42 GDS decks