M3 Mining Ltd. · ASX:M3M

M3 Mining — 121 Mining Investment London 2024

13 slides from M3 Mining's conference presentation, Nov 15, 2024

  1. Slide 1: M3 Mining - 121 Mining Investment London

    v+ M3 MINING 12 NINN, ASX: M3M INVESTMENT 14-15 NOVEMBER 2024 | ONDON November 2024

  2. Slide 2: Disclaimer

    Disclaimer M3 Mining Ltd ACN 615 635 982 (M3M or the Company) is the issuer Forward-looking statements Not a recommendation or financialadvice of this presentation. It is intended for the sole purpose of providing high- This presentation contains forward-looking statements. Those forward- The inform

  3. Slide 3: M3 Mining overview

    ASX: M3M M3 Mining; overview ASX listed company with management known for discovery and transaction success Premier jurisdictions with strong exploration targets in copper and gold Potentially diversifying project portfolio with energy asset Active news flow in coming quarters Well-funded, leanly ru

  4. Slide 4: Corporate Structure

    ASX: M3M Corporate Structure Tight capital structure and supportive shareholder base leveraged to success 83.8M A$3.18M Shares on issue1 Market Cap ASX: M3M At $0.037/sh 11.0M A$2.4M Unlisted Options1 Cash & Receivables1 6.75M Performance Rights1 11% Board & Management 39% Other Top 20 Shareholders

  5. Slide 5: Team

    ASX: M3M Team Team with a track record Russell Davis Simon Eley Eddie King Dermot O’Keeffe Ben Donovan Austin Gow Non-Executive Chair Executive Director Non-Executive Director Non-Executive Director Company Secretary Senior Geologist Geologist Commercial / Corporate Commercial / Engineer Petroleum E

  6. Slide 6: Victoria Bore Copper Project

    ASX: M3M Victoria Bore Copper Project Recent field work uncovers further historic workings with remnant copper oxide confirmed at surface ▪ Located 120km SE of Onslow in the Pilbara, WA ▪ Close to transport infrastructure / DBNGP ▪ Adjacent to FMG, Wyloo Metals and Cauldron Energy ▪ 100% interest in

  7. Slide 7: Victoria Bore Copper Project

    ASX: M3M Victoria Bore Copper Project New high-grade copper occurrences confirmed and additional workings uncovered ▪ 14 unrecorded workings discovered over strike length of 600m, some 3km south of the historic Victoria Bore Copper Mine ▪ Grades included 36.9%, 20.8% and 20.5% Cu4 ▪ Recent field wor

  8. Slide 8: Edjudina Gold Project

    ASX: M3M Edjudina Gold Project Enviable address 140km northeast of Kalgoorlie with limited drilling across the tenement package ▪ Well known mineralised corridor along Keith-Kilkenny Tectonic Zone hosting multiple significant gold discoveries along trend (eg, Carosue Dam, Twin Peaks, Monty Dam and Y

  9. Slide 9: Edjudina – Old Plough Dam

    ASX: M3M Edjudina – Old Plough Dam Newly granted tenement adjacent to Carosue Dam ▪ Multiple disjointed exploration programs over decades ▪ Located within favourable Keith-Kilkenny Tectonic Zone ▪ Limited drilling and limited follow-up work completed ▪ Reconnaissance mapping completed during quarter

  10. Slide 10: Diversifying portfolio; targeting energy projects

    ASX: M3M Diversifying portfolio; targeting energy projects Progressing engagement to secure advanced exploration / pre-development projects ▪ Energy security in the Middle East and North Africa (MENA) region has two aspects: ▪ Improving access to energy in poorer/developing countries ▪ Diversifying

  11. Slide 11: Upcoming Newsflow

    ASX: M3M Upcoming Newsflow Results driven systematic exploration with dual commodity focus in proven jurisdictions Q4 CY2024 Q1 CY2025 Q2 CY2025 Victoria Bore Soil sampling and rock chip results Geophysical survey (subject to results) RC drilling campaign (subject to results) Edjudina Rock chip resu

  12. Slide 12: Investment summary

    ASX: M3M Investment summary Team, commodities, results and acquisitions ▪ Reinterpretation work expands base metals potential at Victoria Bore with more unreported workings discovered ▪ Recent high-grade copper results from newly discovered supergene; grades included 36.9%, 20.8% and 20.5% Cu10 ▪ Ad

  13. Slide 13: Thank you

    Simon Eley Executive Director | M3 Mining Ltd Thank you T: +61 08 6243 6581 E: info@m3mining.com.au

M3 Mining — 121 Mining Investment London 2024 on 6ix