  1. Slide 1: Q3 2023 Results

    Slide 1: Q3 2023 Results

    Q3 2023 Prosafe to select new image Results 25 October 2023

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate.

  3. Slide 3: Key events Q3 2023

    Slide 3: Key events Q3 2023

    Key events Q3 2023 Operations and backlog ▪ Utilisation of 52.3%, four out of seven vessels operating during the quarter ▪ Safe Eurus, Safe Notos and Safe Zephyrus on hire 100% ▪ Safe Concordia on hire in U.S. Gulf of Mexico from 9 August ▪ Good operating and safety performance on all vessels ▪ Orde

  4. Slide 4: Operations

    Slide 4: Operations

    Operations 4

  5. Slide 5: Good operating performance

    Slide 5: Good operating performance

    Good operating Caledonia Scandinavia performance Boreas ▪ Safe Eurus, Safe Notos and Safe Zephyrus Concordia continued to work for Petrobras in Brazil ▪ Safe Concordia on hire in U.S. Gulf of Zephyrus Mexico from 9 August, received stand-by hire from 1 August Eurus Notos ▪ Safe Boreas and Safe Caled

  6. Slide 6: Stable backlog since Q3 2022

    Slide 6: Stable backlog since Q3 2022

    Order backlog (USD million) Stable backlog since Q3 2022 31 25 25 19 19 332 ▪ Backlog of USD 268.2 million at end Q3 293 316 299 268 ‒ Reflecting Safe Eurus, Safe Notos, Safe Zephyrus and Safe Concordia contracts ▪ No additions to backlog in Q3 Q3'22 Q4'22 Q1'23 Q2'23 Q3'23 Backlog Options Expected

  7. Slide 7: Utilisation improving with Concordia on hire

    Slide 7: Utilisation improving with Concordia on hire

    Utilisation improving with Concordia on hire Contract overview 2023 operational items ▪ Safe Eurus: Actively marketed ‒ ~35 days off-hire in Nov/Dec 2023 for hull cleaning, Petrobras contract modifications and SPS ‒ 2023: Expected capex1 of USD ~6-7 million and all-in opex of ~3-4 million ▪ Safe Con

  8. Slide 8: Financials

    Slide 8: Financials

    Financials 8

  9. Slide 9: Operating revenues

    Slide 9: Operating revenues

    Operating revenues Operating revenues and EBITDA (USD million) 70 ▪ Charter income of USD 31.1 million in Q3, 60 reflecting higher utilisation 14 ‒ USD 1.7 million gain on sale of Regalia gangway 50 50 included as other revenue 40 4 ▪ Good operational performance 30 35 2 31 ‒ 100% commercial uptime

  10. Slide 10: Income statement

    Slide 10: Income statement

    Income statement (Unaudited figures in USD million) Q3 2023 Q3 2022 9M 2023 9M 2022 12M2022 ▪ Operating result before depreciation Operating revenues 32.8 63.6 68.1 160.0 198.9 (EBITDA) of USD 8.4 million Operating expenses (24.4) (39.4) (75.9) (108.2) (137.5) Operating results before ‒ OPEX impacte

  11. Slide 11: Balance sheet

    Slide 11: Balance sheet

    Balance sheet (Unaudited figures in USD million) 30.09.23 30.09.22 31.12.22 ▪ Total assets of USD 472.9 million Vessels 388.9 383.2 376.8 ▪ Cash position of USD 49.0 million New builds Other non-current 0.0 0.0 0.0 assets 1.2 1.3 1.2 ▪ Equity ratio of 2.8% Total non-current assets 390.1 384.5 378.0

  12. Slide 12: Operating cash flow in Q3 2023

    Slide 12: Operating cash flow in Q3 2023

    Operating cash flow in Q3 2023 Cash flow in the quarter (USD million) ▪ Operating cash flow of negative USD 14 million ▪ Capex spend of USD 6 million ▪ USD 6 million in capitalised mobilisation costs, USD 4 million increase in account receivable and accrued revenue, and USD 10 million decrease in ac

  13. Slide 13: Debt profile with first major maturity end-2025

    Slide 13: Debt profile with first major maturity end-2025

    Debt profile with first NIBD development (USDm) major maturity end-2025 348 331 346 345 371 ▪ Favourable terms on debt facilities with limited fixed amortization and low interest 75 92 75 75 rate 49 ‒ Main-tranche: 2.5%+ Credit Adjustment Spread Q3'22 Q4'22 Q1'23 Q2'23 Q3'23 + SOFR, maturing 31 Dece

  14. Slide 14: Market and outlook

    Slide 14: Market and outlook

    Market and outlook a i IN 1

  15. Slide 15: Tight North Sea market as clients plan significant campaigns for 2025

    Slide 15: Tight North Sea market as clients plan significant campaigns for 2025

    Tight North Sea market as clients plan significant campaigns for 2025 North Sea capable accommodation rigs (UK+NCS)1 ▪ Safe Boreas only DP3 semi in region 2023 2024 2025 2026 2027 available for 2024 summer work, low Activity Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 visibility on d

  16. Slide 16: Day rates are picking up as the market is tightening

    Slide 16: Day rates are picking up as the market is tightening

    Day rates are picking up as the market is tightening Brazil day rate development (USD/d) North Sea day rate development (USD/d) 200 000 400 000 180 000 350 000 160 000 Latest datapoint 300 000 140 000 117k Latest datapoint at 190k 250 000 120 000 Latest contract 100 000 200 000 Latest contract 80 00

  17. Slide 17: Improving Brazil market with in-country units re-contracted at near double day rates

    Slide 17: Improving Brazil market with in-country units re-contracted at near double day rates

    Improving Brazil market with in-country units re-contracted at near double day rates and increased durations Brazil market balance (units)1 ▪ 4 major Petrobras tenders pending award Future demand outstrips in-country fleet ▪ Further tenders expected from Petrobras and other 12 operators late 2023 wi

  18. Slide 18: FPSO growth in Brazil drive increased accommodation demand

    Slide 18: FPSO growth in Brazil drive increased accommodation demand

    FPSO growth in Brazil drive increased accommodation demand ▪ Petrobras and other E&P companies increasing investments to drive oil production growth Floating production units in Brazil1 ▪ Petrobras to install 23 new FPSOs by 2030 (18 are part +~20% of Strategic Plan 2023-27), decommission older unit

  19. Slide 19: Expecting significant up tick in North Sea activity

    Slide 19: Expecting significant up tick in North Sea activity

    Expecting significant up tick in North Sea activity on back of record number of newly sanctioned Norwegian projects North Sea activity (# of vessel years) Historical PDO’s1) delivered and well-count on the NCS Well count No. PDO’s 7 160 14 6 140 12 5 120 10 4 100 8 80 3 6 60 2 4 40 1 2 20 0 0 0 2012

  20. Slide 20: Indicative earnings potential in an improving market

    Slide 20: Indicative earnings potential in an improving market

    Indicative earnings potential in an improving market Current fleet EBITDA potential Historical EBITDA/vessel1 for Prosafe vessels per region USD million Current Average1 Average1 Peak1 70 USD million market * 2011-22 2011-16 2014-15 61 60 56 54 EBITDA/vessel 17 22 35 41 49 50 45 42 # of vessels on l

  21. Slide 21: Summary

    Slide 21: Summary

    Summary 21

  22. Slide 22: Summary

    Slide 22: Summary

    Summary ▪ Good operating and safety performance on all vessels, with 4 vessels on hire during the quarter ▪ Utilisation expected to remain above 50% in Q4 and into 2024 ▪ Positive development in mid-and long-term demand drivers in Brazil and North Sea (UK and Norway) ▪ Prosafe controlling a signific

  23. Slide 23: Appendix

    Slide 23: Appendix

    Appendix 23

  24. Slide 24: Significant tightening of market balance for high end vessels

    Slide 24: Significant tightening of market balance for high end vessels

    Significant tightening of market balance for high end vessels Stable fleet1 Increasing demand (# of vessel years)1 Global accommodation vessel utilisation2 28 28 100% 27 26 26 90% 25 24 24 23 80% 21 70% 17 16 60% 50% 14 13 13 13 13 13 12 40% 10 11 11 11 10 30% 8 8 9 6 20% 4 10% 0% 2010 2012 2014 201

  25. Slide 25: Option to take delivery of two newbuilds available at yard

    Slide 25: Option to take delivery of two newbuilds available at yard

    Option to take delivery of two newbuilds available at yard ▪ Prosafe has option to take delivery of the only two DP3 newbuild semis available at yard ‒ 500 POB and suited for Petrobras requirements ‒ Long-term contracts at higher than prevailing day rates required to justify delivery ‒ Ongoing dialo

  26. Slide 26: Analytical information

    Slide 26: Analytical information

    Analytical information Item 2023 (USDm) Comment SG&A ~17-181 In a tightening market SG&A is likely to increase somewhat Depreciation ~30-33 Straight line depreciation Interest expense ~30 Exposed to rising interest rates Tax ~2 Norwegian deferred tax asset base of USD 1.7bn, local and contract speci

  27. Slide 27: Prosafe recent firm period fixtures

    Slide 27: Prosafe recent firm period fixtures

    Prosafe recent firm period fixtures Vessel Client Award date Start Finish # months Region Positioning Work type Day rate Total Award Safe Zephyrus Petrobras Des-22 May-23 Feb-25 21 Brasil DP H&M $112 500 $73 125 000 Safe Concordia Confidential Oct-22 Jul/Oct-23 Jun/Sep-24 11 US GoM DP HUC $93 500 $3

  28. Slide 28: SG&A and Opex increasing driven by inflationary pressure

    Slide 28: SG&A and Opex increasing driven by inflationary pressure

    SG&A and Opex increasing driven by inflationary pressure SG&A1 cost development (USDm) Opex per day (USDk/day) 45 9 UK (DP – Boreas/Zephyrus) $35 – 45k 40 40 41 40 8 UK (Moored - Caledonia) $25 – 30k 35 7 30 6.7 6.7 30 6 Brazil** $50 – 54k (incl. fuel) 25 5.9 22 21 19 5 Norway (DP – Boreas/Zephyrus)

  29. Slide 29: Historic SPS and maintenance capex

    Slide 29: Historic SPS and maintenance capex

    Historic SPS and SPS and maintenance capex (USDm)1 maintenance capex 18 16 14 15 15 16 16 14 17 2.4 3.0 2.5 11 10 12 2.0 10 ▪ Maintenance capex of ~USD 1-2 million per 10 8 1.7 1.8 1.5 vessel per year. Higher in Brazil than North 1.6 8 1.3 1.4 1.4 6 1.3 1.0 Sea and increasing over time 4 1.2 0.9 3 0

  30. Slide 30: Tax

    Slide 30: Tax

    Tax ▪ Prosafe SE is a permanent tax resident in Norway. As at end 2022, the company has a base for deferred tax assets of approximately USD 1.7 billion, which can be utilized as tax deduction in the future and is not recognized in the accounts ▪ The company will from time to time operate in countrie

  31. Slide 31: Outstanding debt

    Slide 31: Outstanding debt

    Outstanding debt Two tranches Main tranche COSCO Sellers Credit Debt maturity profile Outstanding debt $343m (250m + 93m Notos) $93m Pledged vessels Boreas, Zephyrus, Caledonia, Concordia, Eurus Scandinavia, Notos Interest rate SOFR + Credit Adjustment Spread* + 0% (increase to 2% from 2026) 2.5%. U

  32. Slide 32: We are headquartered in Norway and have offices in the UK, Brazil and Singapore

    Slide 32: We are headquartered in Norway and have offices in the UK, Brazil and Singapore

    We are headquartered in Norway and have offices in the UK, Brazil and Singapore Head office: Forusparken 2 N-4031 Stavanger Norway prosafe.com