    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Cokemaking Update 6. Benzene Monitoring Program 7. Community Concerns 8. Adjournment

  3. Slide 3: Know Your Emergency Exits

    Know Your Emergency Exits Review Evacuation Routes of the room you are located in

  4. Slide 4: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Cokemaking Update 6. Benzene Monitoring Program 7. Community Concerns 8. Adjournment

  5. Slide 5: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Cokemaking Update 6. Benzene Monitoring Program 7. Community Concerns 8. Adjournment

  6. Slide 6: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Cokemaking Update 6. Benzene Monitoring Program 7. Community Concerns 8. Adjournment

  7. Slide 7: Site-Specific Standard Order (Particulates): Performance Review – Daily

    Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Oct 1 – Dec 31, 2018 0 – 2.47% 0 – 0.78% 0 – 6.58% Range (0.2%) (

  8. Slide 8: Performance Review – 30 Day Rolling Averages

    Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%

  9. Slide 9: Performance Review – Daily Observations – Pushing Emissions

    Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Oct 1 – Dec 31, 2018 Range 0 – 58.3% (Average) (13.4%) Oct 1 – Dec 31, 2018 Operational A

  10. Slide 10: Performance Review – Additional Items

    Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were no community complaints for the period of October – December 2018 • MECP will provide verbal comments

  11. Slide 11: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Cokemaking Update 6. Benzene Monitoring Program 7. Community Concerns 8. Adjournment

  12. Slide 12: Hamilton Works Cokemaking Update

    Hamilton Works Cokemaking Update February 2019 Pete Schiestel

  13. Slide 13: Stelco Cokemaking Overview

    Stelco Cokemaking Overview • Video presentation

  14. Slide 14: Coke Battery Overview

    Coke Battery Overview Quench car al ai, Pusher machine

  15. Slide 15: HW Battery

    HW Battery Future Standards: Minimizing or eliminating battery operating delays will lower coke ovens emissions. The Stelco Hamilton Works coke ovens department has a broadened preventive maintenance and upgrade plan to meet all future standards.

  16. Slide 16: Upgrades

    Upgrades • Rebuilding #3 primary cooler aiding in improving gas quality. • Extending the battery decking to increase coal bunker usage. • Rebuilding #3 tar decanter to remove more tar. • Adding another oxygen sensor into the rich gas stream to control under firing usage. • Designing a one spot quenc

  17. Slide 17: Thank You.

    Thank You. stelcocanada.com

  18. Slide 18: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Cokemaking Update 6. Benzene Monitoring Program 7. Community Concerns 8. Adjournment

  19. Slide 19: Benzene Monitoring Program

    Benzene Monitoring Program • Monitor – Hand-held with Photoionization Detector for VOCs (specific for benzene) • Most of the sources at the Coke Ovens and By-Products are well controlled • Sources with opportunities for improvement include: • Group 1 – Manage with procedures and operating practice •

  20. Slide 20: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Cokemaking Update 6. Benzene Monitoring Program 7. Community Concerns 8. Adjournment

  21. Slide 21: Agenda

    Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 17 October 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Cokemaking Update 6. Benzene Monitoring Program 7. Community Concerns 8. Adjournment

  22. Slide 22: Supplementary (March 21, 2019)

    Supplementary (March 21, 2019)

  23. Slide 23: Site-Specific Standard Order (Particulates): Performance Review – Daily

    Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Jan 1 – Feb 28, 2019 0 – 0.26% 0 – 0.26% 0 – 2.6% Range (0.11%) (

  24. Slide 24: Performance Review – 30 Day Rolling Averages

    Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4%

  25. Slide 25: Performance Review – Daily Observations – Pushing Emissions

    Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Jan 1 – Feb 28, 2019 Range 0 – 40% (Average) (6.55%) Jan 1 – Feb 28, 2019 Operational Adj

  26. Slide 26: Emission Observation (March 12, 2019)

    Emission Observation (March 12, 2019) Conclusion: • Pushing emission Probable Cause: • Low oven temperature due to water washing of the underfiring system to remove deposits in the piping • The gas to the oven being water washed is shut off as the washing is being done Resolution: • The Battery heat

  27. Slide 27: Batch Anneal

    Batch Anneal • Upgrade existing #3 Batch Anneal facility • 12 bell anneal workbases (6 for heating; 6 for cooling) • Anneal steel coils in nitrogen atmosphere • Expected annual production of approximately 540,000 tonnes of annealed steel coils • Stelco has applied for a new Environmental Compliance

  28. Slide 28: Proposed 2019 CLC Meeting Dates

    Proposed 2019 CLC Meeting Dates Thurs. March 21 Wed. June 12 Wed. Sept. 18 Wed. Dec. 11

  29. Slide 29: Thank You.

    Thank You. stelcocanada.com

Stelco Holdings — Corporate Update (February 2019) on 6ix