Bearing Lithium Corp

Bearing Lithium — Investor Presentation (February 2022)

25 slides from Bearing Lithium's investor presentation, February 2022

  1. Slide 1: Investor Presentation February 2022

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE INVESTOR PRESENTATION February 2022

  2. Slide 2: Corporate Partnership Structure

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Corporate Partnership Structure ASX PUBLIC MINERA SALAR TSX-V PUBLIC SHAREHOLDERS BLANCO SpA SHAREHOLDERS PRIVATE LITHIUM POWER BEARING LITHIUM INTERNATIONAL INC. CORP. 51.55% 31.31% 17.14% 100 % MINERA SALAR BLANCO S.A. Ownership: 51.55% Lithium Power Inter

  3. Slide 3: Definitive Feasibility Study Confirms Positive Outlook

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Definitive Feasibility Study Confirms Positive Outlook The Maricunga Stage One Lithium Brine project’s Definitive Feasibility Study (DFS) supports 15,200 tonnes per annum (t/a) production of lithium carbonate (LCE) over 20 years. Project NPV1 (leveraged basi

  4. Slide 4: Environmental Approval, Infrastructure and Financing Outlook

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Definitive Feasibility Study Confirms Positive Outlook The Environmental Impact Study approved in February 2020 by the Chilean government projects achievement of carbon neutrality over the construction period setting new standards for social relationships. C

  5. Slide 5: Global Penetration Rate of Electric Passenger Vehicles

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Technical Report NI 43-101 Definitive Feasibility Study Stage One, Minera Salar Blanco Global Penetration Rate of Electric Passenger Vehicles Atacama Region, Chile Figure 19-4: Global penetrationPercentage rate of electric Salespassenger vehicles, 2020-2036

  6. Slide 6: Electric Vehicle Dominance by Country

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Provided for the exclusive use of luis.saenz@blbadvisory.com on 2022-01-11T14:19+00:00. DO NOT REDISTRIBUTE Electric Vehicle Dominance by Country Provided for the exclusive use of luis.saenz@blbadvisory.com on 2022-01-11T14:19+00:00. DO NOT REDISTRIBUTE 1010

  7. Slide 7: Electric Vehicle Global Demand of Lithium Rechargeable Batteries

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Provided Providedforfor Provided the fortheexclusive theexclusiveuse exclusive ofofof use use luis.saenz@blbadvisory.com onon luis.saenz@blbadvisory.com luis.saenz@blbadvisory.com 2022-01-11T14:19+00:00. on DO 2022-01-11T14:19+00:00. 2022-01-11T14:19+00:00.

  8. Slide 8: Global Lithium Resources and Reserves 2021

    pegmatites pegmatites and continental and continental lithium Other lithium brines. brines.sources Other of sources lithiumof include lithium oilfield includebrines, oilfield brines, geothermal geothermal brines brines and and clays. clays.has Roskill Roskill has catalogued catalogued mineral resour

  9. Slide 9: World Li-ion Battery Use by Market 2020-2036

    By 2036, Roskill forecast battery demand from automotive sector to reach 4.8TWh. The key reason MARICUNGA LITHIUM BRINE PROJECT STAGE ONE behind the transition towards battery-powered cars has been stringent regulation on transport emissions, which is expected to further constrain current transport

  10. Slide 10: Lithium Supply Forecast 2020-2030

    in atight Overall we see longmarket conditions road ahead with Supply of the industry to bringshort on new ofoutput, what Demand with a needs. handful of challenges arising, that the industry will have to successfully navigate. MARICUNGA LITHIUM BRINE PROJECT STAGE ONE We note a large We havemisconc

  11. Slide 11: Lithium Chemical Global Industry Shortages 2021-2036

    2036. This represents more than a doubling of the expected output in 2021. Roskill forecast battery- grade production to increase by 6.2% CAGR to 2036 reaching 1,057.7kt LCE under the base-case MARICUNGA LITHIUM BRINE PROJECT STAGE ONE scenario. As a result of demand significantly outpacing that of

  12. Slide 12: Battery-Grade Lithium Carbonate Pricing Forecast 2022-2036

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Technical Report NI 43-101 Definitive Feasibility Study Stage One, Minera Salar Blanco Battery-Grade Lithium Carbonate Pricing Forecast 2022 - 2036 (US$/t) Atacama Region, Chile Figure 19-10: Average annual contract and spot price forecast for battery-grade

  13. Slide 13: DCF Economic Analysis and Sensitivities

    ne, MineraNISalar al Report Blanco 43-101 Definitive Feasibility Study Region, Chile ne, Minera Salar Blanco Table 22-10 Project After Taxes ʹ NPV 8% Sensitivity a Region, Chile MARICUNGA LITHIUM BRINE PROJECT STAGE ONE KEKD/E>z^/^ Driver Variable Base Case Values 75% 90% Project NPV (MUS$) 100% 110

  14. Slide 14: MSB Project Site

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Technical Report NI 43-101 Definitive Feasibility Study Stage One, Minera Salar Blanco Atacama Region, Chile Technical Report NI 43-101 Definitive Feasibility Study Technical Report NI 43-101 Definitive FeasibilityStage Study MSB Project Site One, Minera Sal

  15. Slide 15: Production Process, Annual Production, Project Capex and Schedule

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE eport NI 43-101 Definitive Feasibility Study Minera Salar Blanco gion, Chile Production Process, Annual Production, Project Capex and Schedule Figure 17-2 General Process Diagram Projected Budget Total Project US$ 000 Direct Costs Brine Extraction Wells 33,2

  16. Slide 16: MSB Infrastructure: Roads, Water and Power

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Technical Report NI 43-101 Definitive Feasibility Study Technical Report NI 43-101 Definitive Feasibility Study Stage One, Minera Salar Blanco Stage One, Minera Salar Blanco MSB Infrastructure: Roads, Water and Power Atacama Region, Chile Atacama Region, Chi

  17. Slide 17: Environmental Approval Received

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Technical Report NI 43-101 Definitive Feasibility Study Stage One, Minera Salar Blanco Technical Report NI 43-101 Definitive Feasibility Study Stage One, Minera Salar Blanco Atacama Region, Chile Atacama Region, Chile Environmental Approval Figure 20-5 Endem

  18. Slide 18: MSB Lithium Mining Concessions and History

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE MSB Lithium Mining Concessions and History (Old 1932 Code Law vs New 1983 Code) Technical Report NI 43-101 Definitive Feasibility Study Stage One, Minera Salar Blanco Atacama Region, Chile MSB Mining Concessions Location Map of MSB Mining Concessions Figure

  19. Slide 19: Lithium Measured and Indicated Resources of Stage One Project

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Lithium Measured and Indicated Resources of Stage One Project “Old Code” Concession Measured (M) Indicated (I) M+I Lithium Lithium Lithium Area (KM2) 4.5 6.76 11.25 Aquifer volume (km3) 1.8 1.8 3.6 Mean specific yield (Sy) 0.09 0.12 0.1 Brine volume (km3) 0.

  20. Slide 20: MSB Mining Reserve - Stage One

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE MSB Mining Reserve - Stage One (Old Mining Concessions) Brine Mining Reserve for pumping to ponds Category Year Brine Vol Avg Li conc Li metal LCE (Mm3) (mg/l) (tonnes) (tonnes) Proven 1-7 19 14,000 75,000 1,024 Probable 1-7 13 19,000 102,000 Probable 8-20 6

  21. Slide 21: Lithium Carbonate Measured and Indicated Resource and Exploration Potential

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE SYDNEY, Australia Lithium Carbonate Measured and Indicated Resource and Exploration Potential Figure 2: Geological Exploration Target Stage One and Stage Two (Combined) Stage One Project Stage Two Development (Old Code Concessions) (New Code Concessions) (20

  22. Slide 22: MSB Stage Two New Concessions - Future Expansion

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE MSB Stage Two New Concessions - Future Expansion The new mining concessions from Litio 1-6 owned by MSB will require additional drilling to further increase the existing M+I Resource (979,000 LCE mt) from 200m depth to 400m depth. The evaluation will also co

  23. Slide 23: Bearing Lithium Capital Structure

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE Bearing Lithium Capital Structure (per January 2022) Total Shares Outstanding: 92,657,738 Warrants Outstanding: Issued date @ C$ 0.17 (Nov 2020-Nov 2023) 6,494,960 Issued date @ C$ 0.24 (July 2021- Jan 2024) 9,057,500 Finder’s Warrants 538,395 Total Warrants

  24. Slide 24: Maricunga: Unrivalled Project Quality

    MARICUNGA PROJECT Unrivalled Project Quality Maricunga: Unrivalled project quality Sustainability in design Mitsui: Strategic Alliance Tier-1 companies Green producer reflected in the design - Offtake and funding rights. The project has been developed with Tier-1 - 30% of the water is produced by th

  25. Slide 25: About Bearing Lithium Corp.

    MARICUNGA LITHIUM BRINE PROJECT STAGE ONE INVESTOR PRESENTATION February 2022 About Bearing Lithium Corp. Bearing Lithium Corp (BRZ) is a pure-play lithium company with a 17% interest in the Maricunga Joint Venture. It has one of the world’s highest grade lithium resources at 1,167 mg/l lithium tota

Bearing Lithium — Investor Presentation (February 2022) on 6ix