  1. Slide 1: ESGold Corp.

    ESGold Corp. Q1 2025 CSE: ESAU | OTC: ESAUZF | FSE: N2W www.esgold.com

  2. Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS This presentation contains certain statements that may be deemed “forward-looking statements”. All statements, other than statements of historical fact, that address events or developments that ESGold Corp. expects to occur, are forward-looking statements. Forward-looking

  3. Slide 3: ESGold Overview

    ESGOLD OVERVIEW —_—_—

  4. Slide 4: Value Drivers: Montauban Road to Production

    2024 OUTLOOK VALUE DRIVERS MONTAUBAN – ROAD TO PRODUCTION ▰ Projected is fully permitted to operate 1000m/t per day Merrill-Crowe closed circuit process system for processing tailings at Montauban ▰ Infrastructure in place includes steel structure building (16,000 ft2), Quebec Hydro power line and a

  5. Slide 5: Business Overview

    BUSINESS OVERVIEW ▰ Formed in 2004 and traded on the CSE (CSE:ESAU), ESGold is headquartered in Vancouver, BC ESGold is a Canadian gold ▰ The company is developing the Montauban Mine project to profitably extract exploration company based in significant residue minerals while restoring and returning

  6. Slide 6: Management Team

    MANAGEMENT TEAM Paul Mastantuono Tony J. Giuliano Brad Kitchen CEO & Director CFO President & Director  Started a transportation company in early 2000  Experienced financial executive having worked as  35-year record consisting of investment banking and later focused on the transportation of bulk

  7. Slide 7: Management Team

    MANAGEMENT TEAM André Gauthier Claude Duplessis Director Geology  Over 47 years of experience in the Mining  Senior Engineer with over 26 years of experience in Exploration field and has worked in over 35 the mining industry. countries.  M. Duplessis has a vast experience in mineral  His work ex

  8. Slide 8: Share Structure

    SHARE STRUCTURE Description Number of shares As of January 2025 Total outstanding shares 46,600,287 Issued and Outstanding: 46,600,287 Options outstanding ($0.71 avg price) 2,030,000 Private Placement Warrants ($0.15) 6,109,013 Fully Diluted Issued and Outstanding: 54,739,300 8

  9. Slide 9: Montauban Project

    MONTAUBAN PROJECT —_—_—

  10. Slide 10: The Montauban Project Site

    THE MONTAUBAN PROJECT SITE The property is located approximately 80 km west of Quebec City and 60 km north of Trois-Rivières, in the Montauban Township in the Portneuf County, Quebec 10

  11. Slide 11: Montauban Highlights

    MONTAUBAN HIGHLIGHTS Highlights based on Tailings from Preliminary Economic Assessment (NI 43-101) PROJECT HIGHLIGHTS Resource Prices Current Market Resource Prices ▰ Fully permitted processing operations for 1,000 t/d mill in 2023 PEA Resource Prices for Break Even ▰ Mill building and infrastructur

  12. Slide 12: Drilling & Mineral Resources at Montauban

    DRILLING & MINERAL RESOURCES AT MONTAUBAN ▰ The drill hole database contained 352 valid drill hole collars, with a total meterage of 1,654.04 m and 1,170 assay intervals totaling 1,498.05 m. For the Notre-Dame-de-Montauban tailing a total of 35 test pits and trenches totaling 77.44 m were excavated.

  13. Slide 13: Drilling & Mineral Resources at Montauban

    DRILLING & MINERAL RESOURCES AT MONTAUBAN ▰ The drill hole database contained 352 valid drill hole collars, with a total meterage of 1,654.04 m and 1,170 assay intervals totaling 1,498.05 m. For the Notre-Dame-de-Montauban tailing a total of 35 test pits and trenches totaling 77.44 m were excavated.

  14. Slide 14: Tailings Mineral Resources at Montauban 2023

    TAILINGS MINERAL RESOURCES AT MONTAUBAN 2023 The mineral resources estimate for the Montauban and Notre-Dame-de-Montauban Tailings Au (g/t) Ag (g/t) AuEq (g/t) Tonnes Au Oz Ag Oz AuOz eq MONTAUBAN TAILINGS Indicated 0.4 31 0.78 603,700 7,800 610,350 15,000 Inferred 0.34 28 0.67 292,000 3,150 258,900

  15. Slide 15: The Montauban Site Opportunity

    THE MONTAUBAN SITE OPPORTUNITY ▰ ESGold has the opportunity to create significant asset value for its shareholders by processing the existing gold, silver and mica found in the toxic mine tailings while satisfying the corporate ESG objectives of removing the toxins and restoring the sites back to a

  16. Slide 16: Near Surface Hard Rock Resources - Map

    NEAR SURFACE HARD ROCK RESOURCES - MAP Surface resources - section 1310 N Grab Samples 1 11.90 g/t Au 31.4 g/t Ag 2 33.20 g/t Au 74.00 g/t Ag 3 1.20 g/t Au 25.00 g/t Ag Based on Historical independent reports non NI 43-101 † Source : Jacques Marchand for Mirabel Resources 16 ‡ Source : Izza Mineraux

  17. Slide 17: Near Surface Hard Rock Resources – Historical Reports

    NEAR SURFACE HARD ROCK RESOURCES – HISTORICAL REPORTS Zone MT Au (g/t) Ag (g/t) North Zone* 274,500 2.80 15.00 South Zone* 114,473 6.1 94 3.76 38.33 Total 388,973 (47,198 oz) (480,998 oz) *based on Historical independent reports NI 43-101 J. Marchand (2003) Zone MT Au (g/t) Ag (g/t) Golden Goose** 6

  18. Slide 18: Near Surface Potential Hard Rock Resources - Overview

    NEAR SURFACE POTENTIAL HARD ROCK RESOURCES - OVERVIEW Near Surface Potential 1M+ tons Gold Silver 3.55 g/t 22.94 g/t 124,164 oz Au 801,121 oz Ag ▰ Montauban deposit and area have not been explored with modern exploration technique ▰ Past producer has never focused on gold and silver ▰ VMS are cluste

  19. Slide 19: Montauban Mine Past Production

    MONTAUBAN MINE PAST PRODUCTION 1913-1944* 1948-1955* 1983-1990† tons zinc 77,000 39,600 - tons lead 24,000 15,600 - oz. gold 40,000 16,876 92,553 oz. silver 4,000,000 2,647,517 323,376 * Source : Jean Depatie for Boiville Ressources Ltd † Source : Genivar Inc. for MRNQ Anacon Shaft Entrance 19

  20. Slide 20: ESGold's Montauban Business Model

    ESGOLD’S MONTAUBAN BUSINESS MODEL ESGold Corp. has a viable solution, which encompasses the restoration of contaminated tailings sites and the extraction of precious metals including gold and silver as well as industrial minerals such as mica. ACQUISITION MILL FACILITY OPERATION & REVENUE NEW PRODUC

  21. Slide 21: ESGold Local Support

    ESGOLD LOCAL SUPPORT STRONG SUPPORT FROM THE STRONG SUPPORT FROM THE HIGH INTEREST FOR NEW GOOD MUNICIPALITY, MAYOR, LOCAL POPULATION PERMANENT QUALITY JOB ADMINISTRATION CREATION 21

  22. Slide 22: Work Completed to Date by ESGold

    WORK COMPLETED TO DATE BY ESGOLD ▰ Over $15M has been invested in developing the Montauban Project ▰ ESGold has obtained all the required permits to restore this contaminated site and has signed the required protocols with the municipality of Notre-Dame-de- Montauban ▰ The company has completed all

  23. Slide 23: Montauban Plant Engineering Design

    MONTAUBAN PLANT ENGINEERING DESIGN 23

  24. Slide 24: Montauban Plant Site Plan

    MONTAUBAN PLANT SITE PLAN DRAIN PIPE (6p) @ = 280 mm ACCUMULATION BASIN Park boundary of. existing tailings pond NEW ROUTE ON THE DAM \ PROCESSING MILL FACILITY \ PUMPING EXISTING ACCESS STATION ROAD Jcurenr PROJECT LEGEND Joare ue Precious Metals = Layout pian for lRAFTMAN DNA Eresen SH=ODE the pla

  25. Slide 25: Project Investment Objectives

    PROJECT INVESTMENT OBJECTIVES Secure private and public sector financing to begin production within 6 months of financing 1 completion Process mining residues, recover the precious metals (gold, silver and industrial metal muscovite 2 (mica) and restore the site (decontaminate) through treatment and

  26. Slide 26: Corporate Directory

    CORPORATE DIRECTORY ESGold Corp. Paul Mastantuono, CEO +1 514 712-1532 CSE: ESAU | OTC: ESAUZF | FSE: N2W pmastantuono@esgold.com 1500 – 1050 W Georgia St. Brad Kitchen, President Vancouver, BC, V6E 4N7 +1 604 506-7555 bkitchen@esgold.com Email: info@esgold.ca This presentation has been reviewed by