Triangle Energy (Global) Limited · ASX:TEG

Triangle Energy (Global) — Australian Energy and Minerals Investor Conference 2021

14 slides from Triangle Energy (Global)'s conference presentation, Mar 17, 2021

  1. Slide 1: ASX Announcement

    Slide 1: ASX Announcement

    ASX Announcement 17 March 2021 ASX:TEG AUSTRALIAN ENERGY AND MINERALS INVESTOR CONFERENCE 17-18 MARCH 2021 Triangle Energy (Global) Limited (Triangle / the Company) (ASX: TEG) is pleased to provide its Investor Presentation to be presented online today by Managing Director, Mr Rob Towner, at the Aus

  2. Slide 2: Investor Presentation March 2021

    Slide 2: Investor Presentation March 2021

    INVESTOR PRESENTATION March 2021 www.triangleenergy.com.au

  3. Slide 3: Corporate Overview

    Slide 3: Corporate Overview

    Corporate Overview CAPITAL STRUCTURE EXPERIENCED BOARD and MANAGEMENT ASX Code TEG Shares on issue 620 million Other Securities on Issue 1.8M Unlisted Options ex @ $0.10, exp 6/11/21 4M Unlisted Options ex @ $0.03 exp 8/2/22 49.0M Performance Rights Share price $0.03 (as at 16 March 2021) Tim Monckt

  4. Slide 4: Cliff Head Resources Summary

    Slide 4: Cliff Head Resources Summary

    CLIFF HEAD RESOURCES SUMMARY Cliff Head (WA-31-L) Contingent Resources (Gross) Net TEG (78.75%) Contingent Resources (MMstb Oil) 1C (Low) 2C (Best) 3C (High) (MMstb Oil) 1C (Low) 2C (Best) 3C (High) SE Nose 0.49 0.81 1.25 SE Nose 0.39 0.64 0.98 West High 0.61 1.06 1.94 West High 0.83 1.53 West Flank

  5. Slide 5: The Triangle Strategy

    Slide 5: The Triangle Strategy

    THE TRIANGLE STRATEGY Unlock significant oil potential within the Perth Basin – a known Huge Footprint and proven O&G region in the Proven O&G Region - Perth Basin Maintain a dominant acreage position where current recent discoveries are happening Dominant Maximise on the high value Exposure to acre

  6. Slide 6: Focus on Strategy

    Slide 6: Focus on Strategy

    FOCUS ON STRATEGY HISTORICAL PERFORMANCE LOOKING FORWARD Issued Cliff Head Acquired Contingent and TP15 Prospective Acquired Xanadu resources, 2.97 additional L7 SE Nose and L7 MMstb and 7.30 seismic Gradual 45% (30% 50%, thereby West High EP-437 Acquired MMstb, owning 100% ** and Evolution to AWE +

  7. Slide 7: Strong and Ideal Portfolio Mix

    Slide 7: Strong and Ideal Portfolio Mix

    STRONG AND IDEAL PORTFOLIO MIX TEG has a strong portfolio of growth opportunities (Exploration to Production) and potential growth strategies • Cliff Head • Cliff Head SE • Cliff Head • Gradual EXPLORATION *** RENEWABLES PRODUCTION DEVELOPMENT Mentelle Nose 0.8 (current evolution 5.4MMstb 2U MMstb 2

  8. Slide 8: Pure Perth Basin Oil Play

    Slide 8: Pure Perth Basin Oil Play

    PURE PERTH BASIN OIL PLAY OFFSHORE ONSHORE ❑ Cliff Head WA-31-L (Production) (72 sq km) ❑ Mt Horner L7* (149 sq km) • ~800 bopd production • Jurassic Oil Exploration and • 0.8MMstb 2C SE Nose (Devt) Production • 1.1MMstb 2C West High • Triassic oil and Permian oil and (Appr/Devt) Gas Exploration • 5

  9. Slide 9: Cliff Head Mark II – Extension Phase

    Slide 9: Cliff Head Mark II – Extension Phase

    CLIFF HEAD MARK II – EXTENSION PHASE Mentelle Updip 3-Well priority drilling opportunity to Far North 5.4 MMstb reach 3000 bopd by Mid 2022 West High 1.1 MMstb 2030 and Beyond Jun-2020 (Production) Current production at ~800 1H 2022 2H 2022 SE Nose and West bopd (Development) High (Production) Catt

  10. Slide 10: Production Phase – Cliff Head

    Slide 10: Production Phase – Cliff Head

    PRODUCTION PHASE – CLIFF HEAD • Cliff Head (100%) production overview (Jan-Dec 2020) – Oil production of 242,626 bbls – $14.3 million revenue (@ US$41 average price) – U$26/barrel lifting cost 9

  11. Slide 11: Production Phase – State Gas Investment

    Slide 11: Production Phase – State Gas Investment

    PRODUCTION PHASE – STATE GAS INVESTMENT • State Gas Production Overview (as announced by State Gas) PL 231 - Nyanda-7 and 8 drilled in Dec. 2020 and together with Nyanda-4, on production test – Latest production over prior 24 hours to 6am 16 March 2021 ▪ Nyanda-4 620,000 cu ft/day - over double prev

  12. Slide 12: Contact Details

    Slide 12: Contact Details

    CONTACT DETAILS Triangle Energy (Global) Limited (ASX:TEG) Mr Rob Towner Managing Director Suite 2 Ground Floor, 100 Havelock St West Perth, Western Australia 6005 info@triangleenergy.com.au www.triangleenergy.com.au @Triangle_Energy 11

  13. Slide 13: Disclaimer and Forward Looking Statements

    Slide 13: Disclaimer and Forward Looking Statements

    DISCLAIMER AND FORWARD LOOKING STATEMENTS • This Presentation is provided on the basis that Triangle Energy (Global) Limited (“Triangle” or the “Company”) nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any repre

  14. Slide 14: End of Presentation

    Slide 14: End of Presentation

    Triangle END OF PRESENTATON 13

Source: Internet Archive copy of triangleenergy.com.au

More decks from Triangle Energy (Global) Limited

All 40 Triangle Energy (Global) decks