Triangle Energy (Global) — Australian Energy and Minerals Investor Conference 2021
14 slides from Triangle Energy (Global)'s conference presentation, Mar 17, 2021
Slide 1: ASX Announcement
ASX Announcement 17 March 2021 ASX:TEG AUSTRALIAN ENERGY AND MINERALS INVESTOR CONFERENCE 17-18 MARCH 2021 Triangle Energy (Global) Limited (Triangle / the Company) (ASX: TEG) is pleased to provide its Investor Presentation to be presented online today by Managing Director, Mr Rob Towner, at the Aus
Slide 2: Investor Presentation March 2021
INVESTOR PRESENTATION March 2021 www.triangleenergy.com.au
Slide 3: Corporate Overview
Corporate Overview CAPITAL STRUCTURE EXPERIENCED BOARD and MANAGEMENT ASX Code TEG Shares on issue 620 million Other Securities on Issue 1.8M Unlisted Options ex @ $0.10, exp 6/11/21 4M Unlisted Options ex @ $0.03 exp 8/2/22 49.0M Performance Rights Share price $0.03 (as at 16 March 2021) Tim Monckt
Slide 4: Cliff Head Resources Summary
CLIFF HEAD RESOURCES SUMMARY Cliff Head (WA-31-L) Contingent Resources (Gross) Net TEG (78.75%) Contingent Resources (MMstb Oil) 1C (Low) 2C (Best) 3C (High) (MMstb Oil) 1C (Low) 2C (Best) 3C (High) SE Nose 0.49 0.81 1.25 SE Nose 0.39 0.64 0.98 West High 0.61 1.06 1.94 West High 0.83 1.53 West Flank
Slide 5: The Triangle Strategy
THE TRIANGLE STRATEGY Unlock significant oil potential within the Perth Basin – a known Huge Footprint and proven O&G region in the Proven O&G Region - Perth Basin Maintain a dominant acreage position where current recent discoveries are happening Dominant Maximise on the high value Exposure to acre
Slide 6: Focus on Strategy
FOCUS ON STRATEGY HISTORICAL PERFORMANCE LOOKING FORWARD Issued Cliff Head Acquired Contingent and TP15 Prospective Acquired Xanadu resources, 2.97 additional L7 SE Nose and L7 MMstb and 7.30 seismic Gradual 45% (30% 50%, thereby West High EP-437 Acquired MMstb, owning 100% ** and Evolution to AWE +
Slide 7: Strong and Ideal Portfolio Mix
STRONG AND IDEAL PORTFOLIO MIX TEG has a strong portfolio of growth opportunities (Exploration to Production) and potential growth strategies • Cliff Head • Cliff Head SE • Cliff Head • Gradual EXPLORATION *** RENEWABLES PRODUCTION DEVELOPMENT Mentelle Nose 0.8 (current evolution 5.4MMstb 2U MMstb 2
Slide 8: Pure Perth Basin Oil Play
PURE PERTH BASIN OIL PLAY OFFSHORE ONSHORE ❑ Cliff Head WA-31-L (Production) (72 sq km) ❑ Mt Horner L7* (149 sq km) • ~800 bopd production • Jurassic Oil Exploration and • 0.8MMstb 2C SE Nose (Devt) Production • 1.1MMstb 2C West High • Triassic oil and Permian oil and (Appr/Devt) Gas Exploration • 5
Slide 9: Cliff Head Mark II – Extension Phase
CLIFF HEAD MARK II – EXTENSION PHASE Mentelle Updip 3-Well priority drilling opportunity to Far North 5.4 MMstb reach 3000 bopd by Mid 2022 West High 1.1 MMstb 2030 and Beyond Jun-2020 (Production) Current production at ~800 1H 2022 2H 2022 SE Nose and West bopd (Development) High (Production) Catt
Slide 10: Production Phase – Cliff Head
PRODUCTION PHASE – CLIFF HEAD • Cliff Head (100%) production overview (Jan-Dec 2020) – Oil production of 242,626 bbls – $14.3 million revenue (@ US$41 average price) – U$26/barrel lifting cost 9
Slide 11: Production Phase – State Gas Investment
PRODUCTION PHASE – STATE GAS INVESTMENT • State Gas Production Overview (as announced by State Gas) PL 231 - Nyanda-7 and 8 drilled in Dec. 2020 and together with Nyanda-4, on production test – Latest production over prior 24 hours to 6am 16 March 2021 ▪ Nyanda-4 620,000 cu ft/day - over double prev
Slide 12: Contact Details
CONTACT DETAILS Triangle Energy (Global) Limited (ASX:TEG) Mr Rob Towner Managing Director Suite 2 Ground Floor, 100 Havelock St West Perth, Western Australia 6005 info@triangleenergy.com.au www.triangleenergy.com.au @Triangle_Energy 11
Slide 13: Disclaimer and Forward Looking Statements
DISCLAIMER AND FORWARD LOOKING STATEMENTS • This Presentation is provided on the basis that Triangle Energy (Global) Limited (“Triangle” or the “Company”) nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any repre
Slide 14: End of Presentation
Triangle END OF PRESENTATON 13
Source: Internet Archive copy of triangleenergy.com.au