Prosper Gold Corp. · TSXV:PGX
Prosper Gold — Investor Presentation (February 2014)
22 slides from Prosper Gold's investor presentation, February 2014

Slide 1: Sheslay Porphyry Copper Gold Project
PROSPER GOLD corp TSX.V: PGX SHESLAY PORPHYRY COPPER GOLD PROJECT February 2014

Slide 2: Forward-looking information and qualified person
• THIS DOCUMENT CONTAINS FORWARD-LOOKING INFORMATION, INCLUDING STATEMENTS RELATING TO THE “EXPECTATIONS”, “INTENTIONS” OR “PLANS” OF THE COMPANY. SUCH INFORMATION INVOLVES KNOWN AND UNKNOWN RISKS, UNCERTAINTIES AND OTHER FACTORS -- INCLUDING AVAILABILITY OF FUNDS, THE RESULTS OF FINANCING AND EXPLO

Slide 3: Sheslay Project
SHESLAY PROJECT • LOCATED IN THE STIKINE REGION OF NORTHWESTERN B.C. • DISTRICT HOSTS SIGNIFICANT COPPER GOLD PORPHYRY DEPOSITS: RED CHRIS, GALORE CREEK, SCHAFT CREEK • DRILL CONFIRMED MULTIPLE PORPHRY COPPER GOLD TARGETS WITH PRESERVED SUPERGENE ENRICHMENT CAP • HISTORICAL HIGH GRADE PORPHYRY TYPE

Slide 4: Shares Issued and Outstanding
SHARES ISSUED AND OUTSTANDING SHARES OUTSTANDING 14,881,683 SHARES ISSUED (2013) 10,179,359 TOTAL 25,061,042 OPTIONS & WARRANTS EXPIRY OPTIONS @ $0.42 2,400,000 30/08/2018 WARRANTS @ $0.60 4,482,533 30/08/2015 TOTAL 6,882,533 FULLY DILUTED 31,943,575 As of October 31, 2013 4

Slide 5: Peter Bernier and Dr. Dirk Tempelman-Kluit
MR. PETER BERNIER – PRESIDENT, CEO & CHAIRMAN MR. PETER BERNIER HAS MORE THAN 35 YEARS OF EXPERIENCE IN MINERAL EXPLORATION AND PROJECT MANAGEMENT. MOST NOTABLY AS THE FOUNDER, PRESIDENT, AND CEO OF RICHFIELD VENTURES CORP. UNDER HIS LEADERSHIP RICHFIELD BECAME A PUBLICLY TRADED COMPANY ON THE TSX V

Slide 6: Jason Hynes and Jim Miller-Tait
MR. JASON HYNES, BSC, MBA – DIRECTOR MR. JASON HYNES IS CURRENTLY DIRECTOR OF BUSINESS DEVELOPMENT & GLOBAL SALES WITH ROYAL GOLD, INC. PRIOR TO THIS HE WAS VICE PRESIDENT OF CORPORATE DEVELOPMENT FOR SABINA GOLD & SILVER CORP. JASON ALSO SPENT SEVEN YEARS IN NATIONAL BANK FINANCIAL’S M&A AND MINING

Slide 7: Ted Muraro and K. Brock Riedell, Advisors
MR. TED MURARO – ADVISOR MR. TED MURARO IS A GEOLOGIST WITH OVER 40 YEARS OF EXPERIENCE IN THE MINERAL EXPLORATION INDUSTRY INCLUDING OVER 30 YEARS AT COMINCO LTD. LEADING TO CHIEF GEOLOGIST, EXPLORATION. HE HOLDS A B.ASC IN GEOLOGICAL ENGINEERING FROM THE UNIVERSITY OF BRITISH COLUMBIA, A M.SC IN G

Slide 8: Option Agreement with Firesteel Resources Inc.
OPTION AGREEMENT WITH FIRESTEEL RESOURCES INC. • PROSPER TO SPEND $5,000,000 OVER A 4 YEAR PERIOD ON EXPLORATION, PROVIDE 1,000,000 PGX SHARES, AND PAY $1,000,000 CASH TO ACQUIRE UP TO 80% OF THE SHESLAY PROJECT (FORMERLY KNOWN AS THE COPPER CREEK PROPERTY) 4 yr Option Agreement (TSX Approval 30/08/

Slide 9: Sheslay Project location map, British Columbia
y Project , Dease Lake Pree @ © KUTCHO 7 Telegraph Creek= ai Ge © RED CHRIS 1 SCHAFT CREEK 7) GALORE CREEK ® COPPER CANYON. © KEMESS \ Dies CREEK ® @ MT MILLIGAN * Smithers Princé Rupert °®"% como — Prince George © BLACKWATER ® Quesnel (@ MOUNT POLLEY Ya hy rewaeton,, Kamloops BRITISH COLUMBIA «© HI

Slide 10: Note on resource estimates of nearby deposits
NOTE: ALL RESOURCE ESTIMATES ARE BASED ON PUBLISHED INFORMATION. THIS INFORMATION HAS 10 NOT BEEN VERIFIED NOR IS IT NECESSARILY INDICATIVE OF MINERALIZATION THAT MAY BE CONTAINED ON THE SHESLAY PROPERTY

Slide 11: Sheslay Porphyry Copper Gold District
SHESLAY PORPHYRY COPPER GOLD DISTRICT HISTORY • 1937 – DISCOVERED • 1955 – BRIKON EXPLORATION (4 DDH 149M) • 1958-73 – SKYLINE JV’S (6 DDH 1050M, GRID GEOCHEM, GROUND MAG, MAPPING) • 1976-80 – UNITED CAMBRIDGE DISCOVERS DICK SHOWING • 1991 – GOLDEN RING (AERODAT SURVEY) • 1996 – ERIN (11.2 KM VLF SU

Slide 12: Sheslay Project claim map
325000 m 345000m —_347500m —_350000m —_352500m —_355000 m & = € g fn “= 8 eas 3 Spine F Prince Goon B x ~— 1 in “ a Hy Prince Rupert ea g iS Do. 7 ra 8 # Kelowna 3 : ancouver ¢ r Universal Transverse Mercator - Zone 09 (N) | e North American 1983 (Canada) Se E 1:125,000 Lem : 1.25 km 8 lt e E ei \ 2

Slide 13: Historical drill hole results
Hole From To Interval Cu Au EOH Cu/Au Number m (EOH) m m % g/t Mineralization CC2004-01 3.00 239.90 236.9 0.32 0.18 Weak CC2004-02 0.00 173.10 173.1 0.41 0.17 Strong CC2004-03 0.00 240.80 240.8 0.23 0.06 Strong CC2004-04 0.00 108.50 108.5 0.19 0.06 Strong CC2004-05 0.00 242.30 242.3 0.44 0.32 Strong

Slide 14: Drill hole intercepts
Hole From To Interval Cu Au Ag Number m m m % g/t g/t S024 4.88 317.04 EOH 312.16 0.37 0.24 0.69 incl 4.88 82 77.12 0.66 0.553 1.11 S024 82 115 33 0.21 0.111 0.38 S024 115 201 86 0.34 0.164 0.38 S024 201 251 50 0.18 0.064 0.35 S024 251 287 36 0.38 0.188 0.7 S024 287 317.04 30.04 0.21 0.107 0.42 S025

Slide 15: Star, North Star, East Star targets
• STAR, NORTH STAR, EAST STAR TARGETS ARE INTERPRETED TO BE A CLUSTER OF 3 COPPER GOLD BEARING PORPHYRY BODIES COVERING A 4 SQUARE KM TARGET AREA • 12 SQUARE KM DEEP PENETRATION IP SURVEY AND GROUND MAGNETICS COMPLETED IN 2013 • PYRRHOTITE CREEK A SECOND PORPHYRY TARGET AREA 15

Slide 16: Star, Copper Creek, North Star and Pyrrhotite Creek targets
STAR COPPER CREEK TARGET • 550 m by 950 m SOIL GEOCHEMICAL COPPER AND GOLD IN SOIL ANOMALY. OPEN FOR EXTENSION • TWO SOIL ANOMALIES SPREAD OVER A 550 m BY • COINCIDENT IP CHARGEABILITY AND MAGNETIC 1000 m AREA. ANOMALY, OPEN FOR EXTENSION • 6 HISTORICAL SHORT DRILL HOLES PRIOR TO • 85% HISTORICAL DR

Slide 17: Star target map with drill collars and soils
+ SHESL AYO) Conga mi hi) 6459000 m 6458500 m * 6455000 m ccz004-01 fe \ SER Nenad €C2004-04 _ ¢ aay | WOE cc 2004-0; ce200%-03 €C2005-08 * 7 ew wt co200518 (CC20045 yolseiy 339000 m 339500 m 1 €C2005-10 a | 7 cc2005-11| VY / 2005-16 cua oS €c2005-15 J 2005-13 | DDH Collars — 2013 IP Survey _— DDH T

Slide 18: Star targets 2014 Phase 1 drilling
L ROJECT - PHASE x, DDH 341500 m Star Targets - 2014 Phase 1 DDH ye 2014 Phase 1 DDH 2013 DDH Collars CAT Trails Target Outline CoA mM i . | Universal Transverse Mercator - Zone 09 (N)| 2 North American 1983 (Canada) 1:10000 1m: 100.00 m Chargeability 341000m

Slide 19: Pyrrhotite Creek target map
6456500 m 6456000 m 6455500 m 6455000 m 335500 m 337500 m 338000 m 335000 m 335500 m 336500 m 337000 m NN Pyrrhotite Creek Target 2014 Phase 1 DDH Historical DDH CAT Trails 2013 Cu-in-soils (ppb) 68625 25450 16175 6620 350 198 35 500 m 337500.m 338000 m 6456500 m 6456000 m 6455500 m 6455000 m

Slide 20: 2013 Exploration Program Highlights
2013 EXPLORATION PROGRAM HIGHLIGHTS • 2,340 METRE DIAMOND DRILL PROGRAM • 6 HOLES ON STAR TARGET • TEST FOR DEPTH: MINERALIZED SYSTEM IS DEEP ROOTED WITH POTENTIAL TO AT LEAST 598m FROM SURFACE • REGIONAL GEOCHEMISTRY AND FILL IN SOIL GEOCHEMISTRY ON HISTORICAL OPEN ENDED TARGETS • 3,464 SOIL SAMPLE

Slide 21: 2014 Exploration Program
2014 EXPLORATION PROGRAM • MULTI-YEAR AREA BASED (MYAB) NOTICE OF WORK PERMIT IN HAND (5 YEAR) • SURFACE DRILLING FROM 200 GROUND AND HELICOPTER SUPPORTED LOCATION • CAMPS: UP TO 35 PEOPLE AT STAR & 8 PEOPLE AT PYRRHOTITE CREEK • MECHANICAL TRENCHING AT 50 SITES • 50 LINE km IP SURVEY • 5 km OF NEW

Slide 22: Pete Bernier – President & CEO
PETE BERNIER – PRESIDENT & CEO PROSPER GOLD CORP. 468 B REID STREET QUESNEL, BC V2J 2M6 OFFICE: (250) 992-6644 MOBILE: (250) 316-6644 EMAIL: INFO@PROSPERGOLDCORP.COM 22
Source: Internet Archive copy of prospergoldcorp.com
More decks from Prosper Gold Corp.
Investor Presentation (April 2025)26 slides · Apr 17, 2025
Investor Presentation (September 2024)15 slides · September 2024
Investor Presentation (July 2024)16 slides · Jul 9, 2024
Investor Presentation (May 2024)16 slides · May 2024
Investor Presentation (April 2023)18 slides · Apr 24, 2023
Investor Presentation (March 2023)21 slides · March 2023