Agl Energy Limited · ASX:AGL
Agl Energy — Corporate Update (March 2018)
40 slides from Agl Energy's corporate update, Mar 22, 2018
Slide 1: Silverton Wind Farm Community Consultative Committee
Silverton Wind Farm Community Consultative Committee Meeting No.CCC-027 Tuesday, 22 March 2018
Slide 2: Agenda
Agenda 1 2 3 4 5 6 Welcome Previous Project update Community Topics of interest Other minutes • Overview relations • Rubbish removal business • Wind Farm Works update • Wilangee Road • Connection Works Silverton Wind Farm | 22 March 2018 2
Slide 3: 1. Welcome
1. Welcome
Slide 4: 2. Previous minutes
2. Previous minutes
Slide 5: Previous minutes: Action items
2. Previous minutes Action items Item Action Status Who 5.19.01 AGL to arrange site tour for interested Silverton community members and the Broken Hill City Council. Open AGL – 1/18 4.22.05 Naomi Schmidt to forward copy of email from Mark Coulton on telecommunication upgrade options to Open NS – 1/1
Slide 6: Previous minutes: Action items
2. Previous minutes Action items Item Action Status Who 3.26.25 AGL will continue to liaise with Telstra to avoid any impacts to N Schmidt’s tower Open AGL – 3/18 4.26.01 AGL to confirm volunteers for the Community Fund assessment committee Open AGL – 3/18 4.26.02 AGL to place advertisement in the l
Slide 7: 3. Project update
• Overview • Wind Farm Works • Connection Works 3. Project update
Slide 8: Silverton Wind Farm
3. Project update Silverton Wind Farm Silverton Wind Farm • Located in the Barrier Ranges approximately 5km north of the Silverton township • Generation capacity of 200 MW • Wind turbines: 58 x GE 3.43-130 • Annual Energy Production (AEP) - ~780,000 MWh (capacity factor of 44.5%) - Powering more tha
Slide 9: Scope of works
3. Project update Silverton Wind Farm Scope of works • Silverton Wind Farm consists of two main scope of work: - Wind Farm Works (GE-CATCON) - Connection Works (TransGrid) • AGL has prepared an Overview Environmental Management Strategy (OEMS) in accordance with the project approval • Overview activ
Slide 10: Wind farm works (GE-CATCON)
3. Project update Silverton Wind Farm Wind Farm Works • GE-CATCON (joint venture) has been engaged to deliver the wind farm works - Engineer, Procure, Construct (EPC) Contract • Scope of works, includes - 58 x GE 3.43-130 wind turbines - 33kV electrical reticulation (underground and overhead) and 33
Slide 11: Connection Works
3. Project update Silverton Wind Farm Connection Works • TransGrid (Network Services Provider) has been engaged to deliver the connection works for the wind farm - Project Agreement (construction) • Scope of works, includes - Wind farm 220kV substation - ~25km of 220kV transmission line - New circui
Slide 12: Construction works
3. Project update Wind Farm Works Construction works • Civil works progress: - Access road clearance: 66/68km (~97%) - Access road capping: 53/68km (~78%) • Structural works progress: - WTG foundations excavated: 53/58 (~91%) - WTG foundations poured: 50/58 (~86%) • Electrical works progress: - 33kV
Slide 13: Construction works – Progress photos
3. Project update Wind Farm Works Construction works – Progress photos Silverton Wind Farm | 22 March 2018 13
Slide 14: Erection of Wind Turbines
3. Project update Wind Farm Works Erection of Wind Turbines • Two main cranes are currently being used for the erection of wind turbines. These cranes have been certified and registered with SafeWork NSW. - LR1450 (450 tonne crane) - LR1650 (650 tonne crane) • GE-CATCON is currently sourcing a secon
Slide 15: Local Industry Participation
3. Project update Wind Farm Works Local Industry Participation • Currently ~150 construction workers with approximately 40% from the local area. - Planned increase of workers for commissioning of wind turbines. • High involvement of local suppliers. - Concrete supply, plant and equipment maintenance
Slide 16: Local suppliers
3. Project update Wind Farm Works Local suppliers • Delivery of the Silverton Wind Farm to date has involved the following local suppliers / contractors - Attards Transport - Interhealth Broken Hill - Barrier Daily Truth - Judd Plumbing - Boss Construction - Lawrence Engineering - Broken Hill City C
Slide 17: Wind Turbine GE 3.43-130
3. Project update Wind Farm Works Wind Turbine GE 3.43-130 • Type Wind Turbine is installed in Wieringermeer, Holland (shown in photo). • Nameplate of 3.43 MW with a 130m rotor and hub height of 110m • The 3MW platform machines are an evolution of the 2.5MW turbine, developed in 2004. • The GE 3.4-1
Slide 18: Wind Turbine GE 3.43-130 Power Curve
3. Project update Wind Farm Works Wind Turbine GE 3.43-130 • GE 3.43-130 Power Curve - Cut in wind speed – 3 m/s - Rated wind speed – 12 m/s - Cut out wind speed – 25 m/s Silverton Wind Farm | 22 March 2017 18
Slide 19: Wind Turbine GE 3.43-130
3. Project update Wind Farm Works Wind Turbine GE 3.43-130 • Wind turbine hub height of 110m • Tower height ~108m - Top section (~30m) - Mid section A (~28m) - Mid section B (~21m) - Mid section C (~15m) - Door section (~12m) - Foundation elevation (~2m) • Tower thickness is ~52mm at the bottom tape
Slide 20: Wind Turbine Deliveries
3. Project update Wind Farm Works Wind Turbine Deliveries • Delivery of wind turbine components are both oversized and/or overmass - Restricted Access Vehicles (RAV) require special operating permits • Components requiring police escort - Tower mid section A - Tower top section - Blades • Components
Slide 21: Wind Turbine GE 3.43-130
3. Project update Wind Farm Works Wind Turbine GE 3.43-130 • Inside the GE 3.43-130 wind turbine Silverton Wind Farm | 22 March 2018 21
Slide 22: Connection Works Practical Completion
3. Project update Connection Works Practical Completion • TransGrid has complete the connection works - Existing Broken Hill 220kV substation (connection point) - 220kV transmission line - Wind farm 220kV substation • Connection works were successful energised on 23 Feb 2018. • TransGrid’s Project D
Slide 23: Connection Works
3. Project update Connection Works Silverton Wind Farm | 22 March 2017 23
Slide 24: 4. Community relations update
4. Community relations update
Slide 25: Community enhancement program
4. Community relations update Community enhancement program Community Enhancement Program AGL has finalised the Community Enhancement Program for the Silverton Wind Farm, in accordance with condition 18 (schedule 2) of the project approval and will implement the program in order to give effect to th
Slide 26: Silverton Community Fund
4. Community relations update Community enhancement program Silverton Community Fund • Applications will be accepted from 5 April to 3 May 2018 • Advertisements will appear in the Barrier Daily Truth from next week calling for applications • Guidelines outlining eligibility criteria will be availabl
Slide 27: Silverton Solar Program
4. Community relations update Community enhancement program Silverton Solar Program • AGL expects to start installation of solar panels by mid-April 2018 • AGL is contacting members of the community to discuss what work may be required on their properties before installations begin • Properties that
Slide 28: Water Tank Program
4. Community relations update Community enhancement program Water Tank Program • AGL has progressed quotes for water tanks with potential supplier and installers (plumbers) • AGL has spoken to water tank suppliers and determined that a 10,000L tank is the most appropriate size for the region • AGL w
Slide 29: Mobile Reception Program
4. Community relations update Community enhancement program Mobile Reception Program • Mobile Black Spot Program - Silverton has been identified as a “community reported black spot”. • Black Spot Funding – Rounds 1 and 2 - Together rounds 1 and 2 are delivering almost $600 million in new investment
Slide 30: Mobile Reception Program
4. Community relations update Community enhancement program Mobile Reception Program • AGL is progressing the previous 4GX solution developed with Telstra for the mobile reception program - Installation of a 20m monopole at Telstra’s Silverton Exchange site with a 4GX small cell which will provide 4
Slide 31: Mobile Reception Program
4. Community relations update Community enhancement program Mobile Reception Program • The coverage predications below provide and indicative view of the coverage the proposed 4GX small cell would provide - Proposed 4GX solution would require a 4G 700 MHz compatible device to benefit from the improv
Slide 32: Visual Impact Mitigation
4. Community relations update Visual impact mitigation Visual Impact Mitigation AGL issued notification to the Silverton residents in accordance with condition 2 (schedule 3) of the project approval in relation to the visual impact mitigation measures outlined in condition 1 (schedule 3). • Owners w
Slide 33: Community engagement
4. Community relations update Community engagement Silverton Information Centre • AGL will be utilising the old butchers shop in Silverton during the construction of the wind farm to provide project information and updates Community information AGL contact details for community and project informati
Slide 34: 5. Topics of interest
• Rubbish Removal • Wilangee Road 5. Topics of interest
Slide 35: Rubbish removal
5. Topics of interest Wind Farm Works and Silverton Road Rubbish removal • Broken Hill Skip Bins provide removal of waste services from the Silverton Wind Farm - All loads are secured and covered before leaving site • Community engagement - Our vision is for AGL to be a trusted and respected member
Slide 36: Wilangee Road
5. Topics of interest Wilangee Road Wind Farm Emergency Access • The emergency access from the Silverton Wind Farm intersects with Wilangee Road on the western boundary of the wind farm. • Access for construction of this emergency access was internal to the wind farm. • RMS installed advisory signag
Slide 37: Heavy and over-dimensional vehicle routes
5. Topics of interest Heavy and over-dimensional vehicle routes Primary Access Route • The Silverton Wind Farm is accessed via Daydream Mine Road. • Wind Farm emergency access intersects with Wilangee Road. • An internal site access road has been construction along the “flat country” on the western
Slide 38: 6. Other business
6. Other business
Slide 39: Next meeting
Silverton Wind Farm Community Consultative Committee (CCC) • Next meeting (TBC) - Thursday, 24 May 2018 - Time: 3-5pm - Silverton Municipal Chambers, Silverton Next meeting
Slide 40: Contact
Contact AGL Energy Silverton Wind Farm 1800-039-600 AGLcommunity@agl.com.au