Galilee Energy Limited · ASX:GLL

Galilee Energy — Non-Deal Roadshow (July 2018)

14 slides from Galilee Energy's roadshow presentation, July 2018

  1. Slide 1: Non-Deal Investor Roadshow Presentation

    Slide 1: Non-Deal Investor Roadshow Presentation

    Non-Deal Investor Roadshow Presentation July 2018 ASX: GLL

  2. Slide 2: Company overview

    Slide 2: Company overview

    Company overview  Brisbane based gas explorer (ASX:GLL). Location of Glenaras Gas Project  100% owner of the 2nd largest Contingent Gas Resource (Galilee Basin) in Queensland (excluding the big 3 LNG exporters).  Management team has a proven track record of top tier coal seam gas and conventional

  3. Slide 3: Peer snapshot

    Slide 3: Peer snapshot

    Peer snapshot Measure Galilee Energy Blue Energy Comet Ridge Strike Energy Real Energy Market Capitalisation $101 million $114 million $250 million $137 million $28 million Cash $10.24 million* $3.06 million* $13.45 million* $4.15 million* $7.75 million* Enterprise Value (EV) $90.76 million $110.94

  4. Slide 4: Australian East Coast Gas Crisis

    Slide 4: Australian East Coast Gas Crisis

    Australian East Coast Gas Crisis • Supply to meet domestic demand has Eastern and south-eastern Australia domestic been constrained by LNG exports, huge gas production (excluding LNG), 2017-2036 East Coast Gas volumes contracted for export. • Gas prices have increased from 2008- 2010 levels of $2/GJ

  5. Slide 5: Glenaras Gas Project – The Asset

    Slide 5: Glenaras Gas Project – The Asset

    Glenaras Gas Project – The Asset  The Glenaras Gas Project is a mature exploration project with over $90 million spent to date.  The resource is clearly defined with over 20 exploration wells, 700km of seismic and two multi well pilots.  Importantly, the existing assets include a large water stor

  6. Slide 6: Glenaras Gas Project – The Asset

    Slide 6: Glenaras Gas Project – The Asset

    Glenaras Gas Project – The Asset  The project has a clear path to market. Jemena and Galilee have signed a binding MOU to fast-track a pipeline from Glenaras to the east coast market.  Low field development cost: – No fraccing; – Low water treatment cost, reinjection solution.  Strong stakeholder

  7. Slide 7: Glenaras Gas Project - CSG properties

    Slide 7: Glenaras Gas Project - CSG properties

    Glenaras Gas Project - CSG properties  Successful CSG projects require three key parameters: – Resource Concentration (thickness, gas content) ✓ – Productivity (thickness, permeability) ✓ – Pressure drawdown in the coal (well design) ? R1  Resource concentration and coal productivity have been pro

  8. Slide 8: Glenaras Gas Project – Production Operations Status

    Slide 8: Glenaras Gas Project – Production Operations Status

    Glenaras Gas Project – Production Operations Status NEW MULTI-LATERAL PILOT IS THE PATH FORWARD TO FIRST RESERVES BOOKING  Target good permeability coal in the near vicinity of the existing pilot. Allow use of existing key infrastructure; camp, pond, flare.  Glenaras 10L and 12L continuing to perf

  9. Slide 9: Jemena MOU – Clear Path to Market

    Slide 9: Jemena MOU – Clear Path to Market

    Jemena MOU – Clear Path to Market  Jemena and Galilee have signed a binding MOU to fast-track a pipeline from Glenaras to the east coast market. This provides a clear, large scale path to market for this important asset.  Galilee are in discussion with a number of gas customers: – Domestic and exp

  10. Slide 10: Share price catalysts

    Slide 10: Share price catalysts

    Share price catalysts GLENARAS  Glenaras 10L and 12L continuing to perform strongly with excellent water rates.  Production will continue to be ramped up over the coming weeks to achieve full reservoir Commercial drawdown flow results  Success would result in sizeable Reserves booking, transformi

  11. Slide 11: Disclaimer

    Slide 11: Disclaimer

    Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated with oil and gas businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying

  12. Slide 12: Galilee Energy – Experienced Board and Management Team

    Slide 12: Galilee Energy – Experienced Board and Management Team

    Appendix Galilee Energy – Experienced Board and Management Team

  13. Slide 13: Experienced oil and gas team

    Slide 13: Experienced oil and gas team

    Experienced oil and gas team Board Dr. David King Peter Lansom Ray Shorrocks Stephen Kelemen Non-Executive Director Managing Director Non-Executive Chairman Non-executive Director PhD, MSc, B.E. Petroleum (Hons) B.A. History/Philosophy (Hons), B.E. Mechanical M.B.A. Finance FAusIMM, FAICD. 20+ years

  14. Slide 14: Experienced oil and gas team

    Slide 14: Experienced oil and gas team

    Experienced oil and gas team Management Ashley Edgar Milton Cooper Peter Lansom Gerard Ryan Business Development and General Manager - Operations Geoscience Manager Managing Director Commercial Manager B.E. (Mech.) M.Sc. (Petroleum) B. App Science (Applied Geo) B.E. Petroleum (Hons) B.A. Accountancy

Source: Internet Archive copy of galilee-energy.com.au