Slide 1: Vulcan IOCGU Project: Success in Sight?
For personal use only Vulcan IOCGU Project Success in Sight?
Slide 2: Lake Torrens Project: Showing Tectonic Lineaments (WMC, 1975)
Lake Torrens Project: Showing Tectonic Lineaments (WMC, 1975) For personal use only EL 4322
Slide 3: Vulcan IOCGU Discovery - 2010
Vulcan IOCGU Discovery - 2010 For personal use only • IOCGU min./alt. (8 holes) - Cu, Au, Ag, U, Mo (+ REE) • Similar target area to OD > 12 km2 • 57 m of strong cpy cpy//py mineralisation in VUD 3 • +150m “classic” min. hematite- hematite-rich breccias in VUD 7 • Classic zoning ((bornite bornite/ch
Slide 4: IOCGU Project: Residual Gravity Image showing Tasman Drilling
Vulcan IOCGU Project For personal use only Residual Gravity Image showing Tasman Drilling
Slide 5: VUD breccia core
Vulcan VUD 001 For personal use only Heterolithic, sulphide- rich breccia Mineralised, hematite matrix- rich breccia (py, cpy) Heterolithic, carbonate breccia (py, cpy, hem)
Slide 6: VUD Cu-Au-U3O8 Mineralisation
Vulcan VUD 003 Cu - Au - U3O8 Mineralisation For personal use only Core from interval: 0.34m at 5.9% Cu, 2.23g/t Au Core from interval: 0.75m at 4.4% Cu, 1.34g/t Au, 0.58kg/t U3O8
Slide 7: VUD: +150m of Hematite Breccia
Vulcan VUD 7 +150m of Hematite Breccia For personal use only
Slide 8: VUD Silica-Hematite Breccia (+ bornite - chalcopyrite)
Vulcan VUD 008 Silica--Hematite Breccia (+ bornite - chalcopyrite) Silica For personal use only
Slide 9: Olympic Dam – Vulcan Zonation Comparison
Olympic Dam – Vulcan Zonation Comparison For personal use only
Slide 10: Geochronology: Re187–Os187 in MoS2
Vulcan Geochronology Re187 – Os187 in MoS2 (PACE 2020) For personal use only • MoS2 widespread at Vulcan - ideal for direct dating of mineralisation • 4 samples from 3 holes - average age 1590 Ma • 1590 Ma consistent with age of Olympic Dam, Prominent Hill and Carrapateena MoS2 (grey) in VUD 001
Slide 11: Rio Tinto Exploration (RTX) Farm-in/JVA (conditional)
Rio Tinto Exploration (RTX) Farm--in/JVA (conditional) EL 4322 Farm For personal use only • $10m to Tasman to drill 12,000m ((est est $5m) in 12 months • RTX to pay TAS $7m and spend $25m on exploration for 55% • If TAS dilutes, RTX may spend $50m for further 25% (ie 80%) • TAS may then contribute o
Slide 12: IOCGU Project: Residual Gravity Image showing Tasman Drilling
Vulcan IOCGU Project For personal use only Residual Gravity Image showing Tasman Drilling
Slide 13: Project: Comparisons
Vulcan Project: Comparisons For personal use only
Slide 14: Lake Torrens Project: Bouguer gravity (+residual inset)
Lake Torrens Project: Bouguer gravity (+residual inset) For personal use only EL 4322
Slide 15: Competent Person’s Statement
Competent Person’s Statement For personal use only The information in this presentation that relates to Exploration Results and Activities is based on information compiled by Robert Smith and Michael Glasson who are Members of the Australian Institute of Geoscientists. Robert Smith and Michael Glass